Skip to content
CloudPlay
  • Pages
    • Project Overview
      • Product roadmap
    • Documentation
      • Transformation
      • Server Requirements
      • System Requirements
      • Own Servers vs Cloud Rental
      • Design Related
      • Cloud GPUs
      • AWS Cloud Gaming
      • icon picker
        Harvester Integration Node
      • Operational Costs
    • Team
    • Tasks
    • Funding
    • Funding Cadence
      • Month 1
      • Month 2
      • Month 3
      • Month 4
      • Month 5
      • Month 6
      • Month 7
      • Month 8
      • Month 9
    • Updates
    • Discussions

Harvester Integration Node

This server is used to run Harvester, which connects and synchronizes data between the Streaming Server APIs and session orchestration layer. It handles API calls, GPU session provisioning, and telemetry collection for testing and validation before production deployment.
Component
Specification / Description
cost
invoice
Chassis
4U Rackmount Server Chassis, GPU-compatible (supports full-length, full-height dual RTX GPUs), efficient front-to-back airflow, hot-swap bays
$239,74
CPU
AMD EPYC 74xx / 75xx Series, minimum 24 cores / 48 threads, supports AMD-V, SR-IOV, and IOMMU for virtualization
$665,43
GPU
2× NVIDIA RTX Series GPUs
$1209,43
RAM
128 GB DDR5 ECC (expandable to 256 GB)
$328,77
Storage
1 TB NVMe SSD (OS + cache) + optional 2 TB SSD (game and session data)
$184,33
Motherboard / Platform
Server-grade AMD SP3 / WRX80 board, dual PCIe 4.0/5.0 x16 slots, ECC and SR-IOV support
$473.99
Power Conditioner
2000 VA Line-Interactive or Online UPS with integrated Power Conditioning
$51.47
PSU
1200W–1600W 80+ Platinum PSU, multi-rail support
$258,21
Network
10 Gbps internal LAN, 1–2 Gbps uplink for low-latency streaming


Virtualization Platform
Harvester
-
-
Target Capacity
Up to 4× 1080p60 sessions or 2× 1440p60 sessions
-
-
There are no rows in this table
Note: Although this was not originally defined as a “server” in the funding plan, it now fully meets all functional requirements for Harvester testing. Therefore, there is no need to purchase the more expensive test server specified earlier in the Funding Cadence. Additionally, invoice_ww_614.pdf includes a motherboard component that was returned, which may cause it to appear twice in the financial report.

 
Want to print your doc?
This is not the way.
Try clicking the ⋯ next to your doc name or using a keyboard shortcut (
CtrlP
) instead.