Gallery
Evaluations
Share
Explore

Preventive Maintenance Calculator

These activities qualify as PM (each one should have a procedure attached or a single document that covers all of them)
1 (e.g. Visual inspection)
Time required per BAP
Frequency based on...(e.g. distance travelled, running time, elapsed time, # of picks, # of suction cup engagements...and then we should also try to roughly equate these to each other)
Can we adjust for facility cleanliness?
2 (e.g. Lidar cleaning)
Time required per BAP
3 (e.g. Check Z-axis belt tension)
Time required per BAP
4 (e.g. Check pump actuation data and suction cup sealing)
Time required per BAP
5 (e.g. Check wheel wear and turning accuracy)
Time required per BAP
6 (e.g. Check tightness of X% of bolts in assembles A, B & C)
7 (e.g. Visual inspection of linear bearing condition/rail wear
Each Runner requires X hours of preventive maintenance per quarter (do some math from above)
Input: Number of Runners on a given site
Operating hours: XX (this might be more helpful as a percentage but whatever)


Share
 
Want to print your doc?
This is not the way.
Try clicking the ⋯ next to your doc name or using a keyboard shortcut (
CtrlP
) instead.