These activities qualify as PM (each one should have a procedure attached or a single document that covers all of them) 1 (e.g. Visual inspection) Frequency based on...(e.g. distance travelled, running time, elapsed time, # of picks, # of suction cup engagements...and then we should also try to roughly equate these to each other) Can we adjust for facility cleanliness? 3 (e.g. Check Z-axis belt tension) 4 (e.g. Check pump actuation data and suction cup sealing) 5 (e.g. Check wheel wear and turning accuracy) 6 (e.g. Check tightness of X% of bolts in assembles A, B & C) 7 (e.g. Visual inspection of linear bearing condition/rail wear Each Runner requires X hours of preventive maintenance per quarter (do some math from above)
Input: Number of Runners on a given site
Operating hours: XX (this might be more helpful as a percentage but whatever)