Section 1: Project Formation and Site Analysis

Task:

In a group of approx. 10, students are required to contribute in developing the Flood Resilient Centre’s (FRC) Design Outlines Formation based on these areas:
The SoA and Concepts Proposed building typologies: Existing FRC, Disaster Relief Centre, Co-Living, Survival Training and Rescue Training
The Building Regulations and
The Site Analysis
The Objectives Key Results (OKRs) for each area are described in the shared wiki-website of this project.
The Key Results (KRs) must be presented in wiki-website, slide presentation format and verbal presentation on FRC.
Section 1: Objective Key Results 1
6
Segment
Objectives
Key Results
Stretched KRs
CLOs
Section No
1
Project’s Definition and Scope
To define what is a FRC and develop a standard Schedule of Accommodation for the project
SCHEDULE OF ACCOMODATION
PRECEDENT STUDIES
KEY DESIGN's CONSIDERATION i.e. Risk Analysis, Accessibility, Safety, Co Living
IMPORTANT REFERENCES
CLO 1
1
2
Site Analysis
To record and analyse the current condition and context of the site with understanding that the site will be used for a FRC.
SITE PLAN
SITE 3D MODEL
SITE PHYSICAL MODEL
ENVIRONMETAL DATA
Current Mitigation Methods
Flood Related Issues -Local and Regional
CLO 4
1
No results from filter

Section 1: Activity Plan

Week
Session
Activity/Program
Products
LOD
1
Tue, Jul 11, 2023
Studio and Design Briefing
Project Formation & Site Analysis: Start
Input Lecture and Discussion on Project Realisation:
Studio Website
Digital Presentation
Group-team and Structure Group-Project (Part 1) start Agreement on Digital Presentation Initiatives
Fri, Jul 14, 2023
Project Formation & Site Analysis: Progress
Discussion on Project Progress:
Identifying services need and integration Report on Group Development
2
Tue, Jul 18, 2023
Project Formation & Site Analysis: Progress
Site Visit/Data Findings
Data Collection and Observation on Site Sketches, Photo, Videos
Fri, Jul 21, 2023
Project Formation & Site Analysis: Progress
Wiki Site Development Site Plan and Model Start
3
Tue, Jul 25, 2023
Project Formation & Site Analysis: Progress
Tutorial
Group Development
Fri, Jul 28, 2023
Submission 1
Project Formation & Site Analysis:
Group Project (Part 1) end Verbal Presentation Site Plan and Models Pre-SoA

Submissions

Objective Key Results Submission
Wiki Website for Studio Design 3B July 2023

Guide on Expected Content

Precedent Studies

The objective of precedent studies for this project is to develop a schedule of accommodation:
The key items that should be concentrated in the studies are the precedent building’s:
Operational information:
The main activities and functions
Number and type of occupants
Operation hours and frequency
Locational information
Location plan
Ingress and Egress
Contour
Orientation
Site Layout
Spatial Information:
Relationships between rooms and groups of rooms.
Zoning
Layout
Internal circulation system
Room type / description
Room size (i.e. floor area, and sometimes dimensions, which may include height).
Environmental conditions required:
temperature range
humidity
air movement
acoustic conditions
lighting levels
Furniture, fixtures and equipment requirements

Site Analysis

A. Infrastructure (during flood and non-flood) - Group 1

Temporary Evacuation Centre (PPS)
Previously there are 3 PPS for Hulu Langat flood victims. (to identify the distance)
Pangsapuri Desa Lembah Permai, Ampang
Sekolah Kebangsaan (SK) Kampung Sungai Serai dan
Kompleks Penghulu Mukim Cheras Batu 10
Access roads for rescue teams and essential supplies
Power Supply
Water Supply
Healthcare Facilities

B. Cultural - Group 2

Activities
Man Made Features
Socio-Economic
Culture, Architecture and History

C. Land Use - Group 2

Land use and Laws
Structure Plan
Land zone

D. Ecological - Group 3

Topography
Climate
Sensory
Natural Features

E. Architecture Documents - Group 3

Drawings
Site Plan
Site Sections
Site Elevations
Site Model
Physical