Skip to content
Section 4: Integrating the Structure and the Services (+ Landscape)

icon picker
Interim Crit 2: Schedule

Venue: 407 Block 11
Date: 19 September 2023
Interim Crit 2
3
External Panel
Name
Time
Rizal Husin
7
NANTIINI A/P K JAYASELAN
​2:00 PM
MUHAMMAD SYAKIR BIN KHAIRUL ANUAR
​2:30 PM
ABDULLA MURTADA
​3:00 PM
YAP WI XI
​3:30 PM
MAISARAH BINTI ESMADY
​4:00 PM
ABDULLAH IMRAN BIN ABDUL RAHIM
​4:30 PM
ANANYA JEBA FARIHA
​5:00 PM
Ar Mohd Kamal Abdullah
7
BATRISYIA BALQIS BINTI JAAFAR
​2:00 PM
LIEW YU SHENG
​2:30 PM
SARAH RAIHANAH BINTI SHARIF
​3:00 PM
HAMID HESHAM AMIR ABDULWAHAB
​3:30 PM
DEENIE H'YATT BIN JUMAT
​4:00 PM
AL AMRI MALAK ABDULLAH HASSAN
​4:30 PM
IZZAH SYAZANA BINTI IBRAHIM
​5:00 PM
Siti Najwa Sh Yahya
7
PRITHIKA A/P GUNALAN
​2:00 PM
SITI NUR ZAKIRAH BINTI ZAHARI
​2:30 PM
NIK AFIQ BIN NIK AZMAN
​3:00 PM
HUSNA FATINI BINTI MOHD NIZARUDDIN
​3:30 PM
AMMAR IKHWAN JASMIN BIN ZAMZURI JASMIN
​4:00 PM
MUHAMMAD IQBAL BIN HENDRI
​4:30 PM
AIMAN DARWISY BIN KHAIRIL ANUAR
​5:00 PM
Ar Patmaselvi
6
RAHMAH NUR SARAH BINTI HARISFAISAL
​2:00 PM
HAZIQAH BINTI IBRAHIM
​2:30 PM
HASHI HASHI MOHAMED
​3:00 PM
ARIEF AZRAEI BIN AZMAN
​3:30 PM
SITHAI A/P SELLATHURAI
​4:00 PM
ABDELHAMID IMAN SAMIR ABDELHAMID ABDEL
​4:30 PM
Ar Mohd Hayazi Agusi
6
SYUHADA BINTI ANUAR
​2:00 PM
TAN YONG KIT
​2:30 PM
SEETUL DASHABHUJA
​3:00 PM
MUKAISH RAO A/L APPA RAO
​3:30 PM
AIMAN ARIF BIN NANI
​4:00 PM
ARAVIN A/L GUNA SEELAN
​4:30 PM
Interim Crit 2: Assessment Criterias
6
Segment
Objectives
Key Results
Stretched KRs
Search
Segment
Weight
Objectives
Key Results
Stretched KRs
Achieve (40)
Developing (41-74)
Examplary (75-100)
1
Site Plans
20%
To develop a site plan and circulation planning that shows how the design setting, circulation and context of building.
Site Plan 1:500 or greater
3D model of each floor
The key results identified but not yet in satisfactory manner and major correction required
The key results identified in satisfactory manner and minor correction required
The key results identified in good manner and very minor correction required. Some stretched key results produced in satisfactory manner
2
Floor Plans
40%
To develop a set of floor plans that shows the layout of the buildings that shows integration between department, circulation, building services and structure.
Floor Plans with at least the spaces with openings sizes and positions. (LOD 200)
Scale 1:200 or greater
3D model of each floor
The key results identified but not yet in satisfactory manner and major correction required
The key results identified in satisfactory manner and minor correction required
The key results identified in good manner and very minor correction required. Some stretched key results produced in satisfactory manner
3
Callout Plans
30%
To develop callout floor plan for each accomodation types with space arrangement, openings and furnitures.
Callout floor plan for each accomodation types plans with furnitures (LOD 300)
Scale 1:100 or greater
3D sections
The key results identified but not yet in satisfactory manner and major correction required
The key results identified in satisfactory manner and minor correction required
The key results identified in good manner and very minor correction required. Some stretched key results produced in satisfactory manner
No results from filter

Want to print your doc?
This is not the way.
Try clicking the ⋯ next to your doc name or using a keyboard shortcut (
CtrlP
) instead.