0.5
2016
This is the third plant at the Upington Airport
2015
Nordex N117
134.4
This link can't be embedded.
Open
2016
Wheeling proiject
10
2021
Beaufort West Wind Facility
140
Rumours 5,000 MW
Scoping done in 2013
68
2020
Performing in line with expectations
USD 366m
ZAR 5bn
2018
Braklaagte Solar Facility
75
7 X Vestas V112
21.5
2015
Coleskop Wind Energy Facility
140
Colley Wobbles Power Station
42
1985
34 Acciona 3.15 MW turbines 102
3/1/2021
ZAR 202bn
2018
1
2
This link can't be embedded.
Open
2017
Sinovel SL3000
27
UPC 86
Longyuan Mulilo Consortium
96
UPC 86
Longyuan Mulilo Consortium
139
Mainstream Renewable Power
50
2014
Nordex N100
100
2014
Drakensberg Pumped Storage Scheme
1000
1981
Mainstream Renewable Power
50
2014
Droogfontein 2 (Matla A Bokone)
75
2020
2018
Du Plessis Dam Solar PV 1
75
Ekurhuleni Metropolitan Municipality
0.75
2018
Ekurhuleni Metropolitan Municipality
0.5
Ekurhuleni Metropolitan Municipality
1.5
13 X 2.5Mw Turbines
Goldwin GW121
32.5
2020
2018
Nordex N90
111
This link can't be embedded.
Open
2017
48 X 2.5Mw turbines
Blue Crane Route Local Municipality
120
6/30/2021
2021
2018
Wind turbine: 46 X ACCIONA Windpower AW100/3000.
138
This link can't be embedded.
Open
2015
20 X Vestas V112
61.5
This link can't be embedded.
Open
2016
Grootspruit Solar PV Project
75
Vestas V100
66
2014
Ingula Pumped Storage Scheme
1332
2017
75
2014
Implementation time was around 2 years
60 Siemens SWT 2.3MW turbines
Mainstream Renewable Power
138
2014
2012
18
Landfil to gas project Johannesburg
Open
2018
Run-on-river
10
2015
61 Turbines
Mainstream Renewable Power
140