Skip to content
417 Scalamandre/Nestor Home Reno
Share
Explore
Building Basics
The CliffHaven in Morningside Heights
Prewar
High Ceilings
Decorative Original Plaster Molding

Floorplan
2021: Phase 1
Phase 1: Keeps Existing Plumbing Locations and Footprint but takes down a few cosmetic walls

Screen Shot 2021-05-30 at 12.44.35 PM.png
2025: Phase 2
Phase 2 will include the purchase of a hallway space, closing off the second bedroom and making a hallway
Redoing the Windows on the Landmark Facade part of the space

1804b52c (1).png
Floorplan Current State
698a0397.jpeg
Want to print your doc?
This is not the way.
Try clicking the ⋯ next to your doc name or using a keyboard shortcut (
CtrlP
) instead.