Section 2: Building System Design
Useful References
Task:
In a group, students are required to develop a few options of Building Systems that are at least up to LOD 100.
The
main objectives
of this section are to:
Create the conceptual mass of the proposed PPS
Plan the external circulation system
Plan the internal circulation system
Position the building services elements and their networking
Comply to the building laws and fire regulation
The
suggested Building System Design approach
are:
Building Operations during non flood and flood.
Modular Structure and Grid
Sustainable energy, resource management and operation
yet, each group may discuss with the studio master and tutor if they think there is another approach that is suitable for this section.
Section 2: Objective Key Results 2
Section 2: Objective Key Results 2
6
Segment
Objectives
Key Results
Stretched KRs
CLOs
Segment
Objectives
Key Results
Stretched KRs
CLOs
1
Building Regulations
To identify and list down the important segments of various building regulations and services that need to be considered in this project
List And Clause Of Building Regulations
List Of Building Services And Suitable Type For This Project
Indication Of Compliance (Size ,Nos , Location)
Compliance Checklist
Common And Best Practice In Compliance
Services And Structure Integration i.e.. Column Grid Spacing For Basement Parking
CLO 5
2
Site Planning
To develop a set of conceptual site massing and site planning system according to the SOA and design variables
Space Arrangement concepts
Circulation System
Early Enviromental Design Strategy
Services Location and Access
Fire Regulation Compliances
Site Concept in 3D (LOD 100)
External Circulation Concept 3D
Internal Circulation Concept 3D
CLO 1
CLO 5
3
Environmental Design Strategy
To develop a set of early passive design strategy
Solar Analysis
Passive Design Strategy
Integration with Landscape and Open Area 3D
CLO 2
No results from filter
Section 2: Activity Plan
Week
Session
Activity/Program
Products
LOD
Week
Session
Activity/Program
Products
LOD
3
Fri, Jul 28, 2023
Submission 1
Project Formation & Site Analysis:
Group Project (Part 1) end Verbal Presentation Site Plan and Models Pre-SoA
4
Tue, Aug 1, 2023
Building System Design (LOD 100): Start
Briefing on Building System Design
Finalised SoA released Input Lecture on Autodesk Insight for Sustainability Strategy and LOD 100
SoA
100
Fri, Aug 4, 2023
Building System Design (LOD 100): Progress
Input Lecture on Fire Regulation
Group discussion
Mass Model Option and Experiment
Site Massing and Planning Space Zone Planning Initial Mass Models Vertical Horizontal Connections
100
5
Tue, Aug 8, 2023
Submission 2
Building System Design (LOD 100):
Site Massing and Planning Options
Space Zone Plan Options
Building Design (LOD 200): Start
Finalised Mass and Zoning Models options
100
Building Regulations
A. Land and Development Regulations
B. Fire Safety Requirements
C. Building Services
Submission Samples
MASSING - group halfway.
pdf
8 MB
Building System Design.
pdf
10.3 MB
GROUP 2 SOLAR AND WIND PROPOSALS (1).