2.1 Participate in scope focusing discussions for MURI study sites
10/1/2023
2.2 Identify hybrid statistical-dynamical modeling workflow for study sites
12/1/2023
2.3 Implement hybrid statistical-dynamical modeling workflow for study sites
4/1/2024
2.4 Present/future projections of TWLs using TESLA and AOGCM/GTSM models
8/1/2024
2.4 Present/future projections of TWLs using TESLA and AOGCM/GTSM models (part 2)
7/1/2026
2.4.1 TESLA (part 2)
7/1/2026
2.4.2 AOGCM/GTSM (part 2)
7/1/2026
2.5 Modeling approach refinements
1/1/2025
2.6 Initial data for input to vulnerability assessments
4/1/2025
2.7 Uncertainty assessment of model estimates
6/1/2025
2.8 Assessment of adaptation options (part 1)
11/1/2025
2.8 Assessment of adaptation options (part 2)
1/1/2027
2.9 Focus Group Meetings
1/1/2026
2.9.1 Focus group summaries describing flood sensitivities and thresholds
1/1/2026
2.9.2 Data for input to vulnerability assessments
1/1/2026
2.10 Complete and submit manuscripts
7/1/2026