Gallery
Philips - 22030 Client Portal
Share
Explore
Philips - 22030 Client Portal

icon picker
Design Revision

Current

Last updated on 1/18/24

Concept E


Fly Through Animation

Click this
to view full screen on Vimeo 📼
Loading…

Renderings

Click preview to enlarge images 🔎
1
Philips14 revision_004.jpg
Philips14 revision_005.jpg
Philips14 revision_050.jpg
Philips14 revision_049.jpg
Philips14 revision_051.jpg
Philips14 revision_052.jpg
Philips14 revision_053.jpg
Philips14 revision_054.jpg
Philips14 revision_055.jpg
Philips14 revision_057.jpg
Philips14 revision_056.jpg
Philips14 revision_058.jpg
Philips14 revision_060.jpg
Philips14 revision_059.jpg
Philips14 revision_010.jpg
Philips14 revision_006.jpg
Philips14 revision_007.jpg
Philips14 revision_009.jpg
Philips14 revision_008.jpg
Philips14 revision_013.jpg
Philips14 revision_011.jpg
Philips14 revision_012.jpg
Philips14 revision_017.jpg
Philips14 revision_016.jpg
Philips14 revision_015.jpg
Philips14 revision_014.jpg
Philips14 revision_048.jpg
Philips14 revision_018.jpg
Philips14 revision_047.jpg
There are no rows in this table

Archive

Last updated on 1/12/24

Concept E

NEW CONCEPT ver7.jpg
NEW CONCEPT ver8.jpg
Last updated on 1/10/24

New Concepts

Concept A

version 1.jpg

Concept B

version 2.jpg

Concept C

version 3.jpg

Concept D

version 4.jpg
Last updated on 12/22/23

Video Comments

Loading…

Notes:

Wetland Buffer
We took the wetland buffer challenge as an opportunity to make the project even better
Created a two tier grotto design
Added an opening in the grotto to connect the pool with the island section
Redesigned the catch basin to be more interactive and useful
Added additional seating areas
Additional walk up bar at kitchen
Cabana Update
Renderings show correct cabana design. The flythrough animation shows incorrect cabana design with open rafter ceiling.
Ceiling will be tongue and groove instead of open rafters. This will provide a cleaner look, allow for can lights, and will be easier to clean and maintain.
We will replace sconce lights on the rear posts with well lights. This will solve the conflict with the downspouts.
Next steps:
Client feedback
Redesign as necessary
Create new take off
Update invoice
Two tier grotto and flagstone pathway will require additional load of rock
This cost may be partially offset by some hardscape cost reductions

Renderings

Click preview to enlarge images 🔎
1
Philips12 revision_013.jpg
Philips12 revision_002.jpg
Philips12 revision_014.jpg
Philips12 revision_015.jpg
Philips12 revision_016.jpg
Philips12 revision_017.jpg
Philips12 revision_018.jpg
Philips12 revision_001.jpg
Philips12 revision_003.jpg
Philips12 revision_007.jpg
Philips12 revision_004.jpg
Philips12 revision_006.jpg
Philips12 revision_009.jpg
Philips12 revision_005.jpg
Philips12 revision_010.jpg
Philips12 revision_008.jpg
Philips12 revision_012.jpg
Philips12 revision_011.jpg
There are no rows in this table

Animation

Loading…


Share
 
Want to print your doc?
This is not the way.
Try clicking the ⋯ next to your doc name or using a keyboard shortcut (
CtrlP
) instead.