RNP procedures are Position Estimation (Manual, autopilot coupled, etc)
Path Definition (Flight planning for routes and procedures)
Path Steering (Electronic map display for lateral trend vector and vertical range and altitude for active flight plan)
Basic User functions but all of these need to be done in order to have the system work properly for use and setup.
Placement
RNAV Equipment
FAA Documentation
Boeing test sites since they are actively involved in the push for the logistics and physical location for some of this testing
Resources
U.S. Department of Transportation, Federal Aviation Administration, & Barbagallo, J. (2015). U.S. Terminal and En Route Area Navigation (RNAV) Operations (Advisory Circular No. 90-100A; 2nd ed.).
Nakamura, D. A., Boeing Air Traffic Management – Emerging Programs, & Harper, P. M. (2003). Required navigation performance.
BACO_RNav-ExportCntrl.pdf
3.5 MB
AC_90-100A_CHG_2_2015.pdf
278.2 KB
Submission
R-NavSystem5POverview_ClaytonBrown_012026.pdf
312 KB
Load content from python-seabreeze.readthedocs.io?
Loading external content may reveal information to 3rd parties. Learn more
Allow
Want to print your doc? This is not the way.
Try clicking the ··· in the right corner or using a keyboard shortcut (