Agenda & Workflow

Progressive's billing
NOTES

QUESTIONS:
# of payments
Identify the breakdown of payments
FOLLOW UP:

Estimating / Proposal overview (demo with Johns house)
NOTES

QUESTIONS:

FOLLOW UP:

Management of billing / collections
NOTES

QUESTIONS:
Identify primary payment methods (check, Wire, ACH, card)
FOLLOW UP:

Review open questions on master Coda Doc
What are the most important reports.
TV Screens / Boards
Terminology
Process
Step Name
Step Details
Responsible Role
6
Form fill customer information into questionaire
Schedule date and time for estimator to visit client
Send information profile of estimator scheduled
Order ariel measurments
GAF Quick Measure or Eagleview
Send reminder to client with date and time of estimate
9
Enter measurements into job card estimating
Take pictures
Produce proposal
Presentation to client
Follow up with client thru the new system.
Send email with liturature or more information
Call customer to be sure they received information
Final follow up unless customer is still interested for the future
Schedule a follow up date
6
Schedule to meet client at home to review and sign documents
Prepare in house closing documents
Prepare permitting and city documents (COMPLETED BY PERMITTING)
Obtain tile or shingle selections
Prepare folder with all documents
1: Signed contract and documents
2: Job card with drawing
3: A and B drawing for permitting
4: Material list
5: P&L
6: Commision sheet
Turn in job folder to Sales Manager for approval
17
Receive in new job folder from Sales Manager
Contact customer for introductory phone call
Scan and email all signed documents to client
Order tile samples if needed
Send client license and insurance for HOA if needed
Order special engineering and Asbestos survey if needed
File Notice of Commencement
Prepare invoices for client
Obtain HOA Approval
Order tile if a tile roof system or check material availability for shingle
Complete permit application
Complete all documents needed for permit
Apply for Permit
Update customer with progress
Obtain approved permit
Update client when permit is obtained
Move folder to Operations
2
Receive in folder from Permitting
1: Contact customer for introductory phone call
2: Choose vendor
3: Confirm roof colors with client
4: Order materials
5: Update client weekly on progress
7
Schedule start date (OPERATIONS)
Post job to calendar and messaging system
1: Update client with delivery and Phase schedules
Assign crew
Schedule material delivery Phase I
1: Update client of delivery date to clear driveway for Phase
2: Have client re-read the Pre Start Checklist and resend if needed
Schedule material delivery Phase II if needed
Schedule inspection for phase I
1: Have client clear the drive way for work to commence for Phase I
DAY BEFORE START - In house production
1: Deliver Permit Box
2: Deliver Permit
3: Deliver Invoices
4: Deliver and set up ladder
4
Remove roof and install 1st layer
Take pictures of rotten wood
Update Operations of any change order (Wood, Stucco etc.)
Estimator to visit job and update customer of progress (ESTIMATOR)
8
Schedule inspection for Phase II.
(If a flat roof only then go to FINAL INSPECTION)
Contact client to update and inform of in progress of Phase I
1: Update client about possible wood and stucco change order
2: Update client with Phase II material delivery date to clear driveway
COLLECT PAYMENT
COLLECT 30% IF TILE OR TILE AND FLAT ROOF
COLLECT ADDITIONAL WOOD CHARGES IF ANY
(NEXT DAY) Perform Quality Control inspection of Phase I
(In House Production)
1: Update client with confirmation of Phase II work schedule to
2: Update client with addition wood / stucco charges if any
3: Email job pictures from Phase I
4: Submit change order to client if any
Perform Quality Control inspection of Phase I (In House Production)
1: Take pictures
2: Update Operations of any damage or items to be addressed
COLLECT PAYMENT
COLLECT 30% IF TILE OR TILE AND FLAT ROOF
COLLECT ADDITIONAL WOOD CHARGES IF ANY
Update client with confirmation of Phase II work schedule to clear driveway
Update client with addition wood / stucco charges if any
Email job pictures from Phase I
Submit change order to client if any
Next Day
Perform Quality Control inspection of Phase I (In House Production)
Take pictures
Update Operations of any damage or items to be addressed
1
Install materials for Phase II
Install tile underlayment or additional layer for a shingle roof
If no additional layer for shingle roof then install shingles and move to FINAL INSPECTION
Estimator to visit job and update customer of progress (ESTIMATOR)
4
Schedule materials to be delivered for Phase III if any
Schedule inspection for Phase III if tile roof or shingle roof with additional underlayment
Update client with Phase III material delivery date to clear driveway if any
Update client with Phase III work schedule to clear driveway if any
Perform in house Quality Control inspection of Phase II (In House Production) if any
Take pictures
Update Operations of any damage or items that need to be addressed
COLLECT PAYMENT
COLLECT 30% FOR TILE OR TILE AND FLAT ROOF
COLLECT STUCCO CHARGES IF ANY
3
Install materials for Phase III
Install tile or shingles if Phase II was additional underlayment for shingle roof
Deliver trailer if tile roof (In House Production)
Estimator to visit job and update customer of progress (ESTIMATOR)
4
Schedule Engineering if tile roof
Update client with next steps for final inspection
Perform in house Quality Control inspection of Phase III if any (NEXT DAY)
Take pictures
Update Operations of any damage or items that need to be addressed
COLLECT PAYMENT
COLLECT 30% FOR TILE OR TILE AND FLAT ROOF
4
Schedule final inspection
Perform final clean up (In house Production)
Prepare clients final paperwork package
Schedule estimator for final walk through and final payment collection (RECEPTION)
6
Meet with client
Thank for trusting us
Ask for review
Turn in final payment to Operations
Operations to close out file and send to book keeping
COLLECT PAYMENT
COLLECT FINAL 10% FOR TILE OR TILE AND FLAT ROOF
COLLECT FULL PAYMENT IF SHINGLE OR SHINGLE AND FLAT OR FLAT ONLY
Auto complete address search
When estimate accepted. Convert to lead.
Have the ability to send all emails at the same time GG - sends 4 single emails prior to planning / job setup
Lien release request from distributor
Tile 3 collection
Shingle single collection after job completed