JavaScript required
We’re sorry, but Coda doesn’t work properly without JavaScript enabled.
Skip to content
Superhomes assessment 3 Piping Road PAS0018
PAS 2035 Assessment for 3 Piping Road PAS0018
Retrofit assessment
Retrofit plans
Biodiverse improvement options for your home
Retrofit design
Claim of compliance with PAS 2035
Handover documents for client
Monitoring and evaluation
More
Share
Explore
Path B assessment requirements
Detailed construction assessment of materials and thermal transmittance beyond SAP for older buildings
Materials and thermal transmittance
Materials and thermal transmittance
Element
Composition
U value
Element
Composition
U value
walls
Cavity
floor
Suspended timber
roof
Pitched roof
windows
Double glazed
doors
Double glazed
There are no rows in this table
5
Count
Measured survey of building including windows and doors
Site constraints
Building services and effectiveness
Occupancy and vulnerability
Historical assessment
Historical assessment
Occupancy
Condition
Vulnerability
Occupancy
Condition
Vulnerability
occupied
good
There are no rows in this table
1
Count
Want to print your doc?
This is not the way.
Try clicking the ⋯ next to your doc name or using a keyboard shortcut (
Ctrl
P
) instead.