Retrofit plans

icon picker
Compatibility assessment

This section looks at the chosen measures and how they interact, it also checks that any work undertaken will not block any measures to be installed later in the process.
Recommended measures for the house
0
Row Number
Name
Compatibility
1
1
Remove solid fuel heating
Before floor insulation
2
2
Block open chimneys
Before loft insulation
3
3
Floor insulation (solid or suspended)
After ventilation has ben upgraded
4
4
Loft Insulation (between and over ceiling joists)
After ventilation has been upgraded
5
5
Decentralised mechanical extract ventilation
Before loft insulation
Before floor insulation
6
6
Solar photovoltaics
After loft insulation
7
7
Ground-source heat pump
After insulation measures to achieve maximum effectiveness.