Successful construction projects follow structured design methodologies. The SD, DD, and CD sequence, standardized by the American Institute of Architects, provides this essential framework for transforming concepts into built environments.
Beginning with Schematic Design
Schematic Design converts client aspirations into tangible design concepts. This initial phase explores building form, scale relationships, and spatial organization without excessive detail.
Architects produce conceptual site arrangements, preliminary space plans, exterior appearance studies, fundamental building sections, and illustrative materials. These outputs facilitate alignment discussions and strategic direction-setting.
The phase offers vision synchronization, early financial projections, strategic decision flexibility, and feasibility validation. These benefits establish project foundations when adaptability remains highest and modification costs lowest.
Advancing through Design Development
Design Development transforms approved concepts into technically defined proposals. Structural engineers, mechanical designers, electrical specialists, and plumbing consultants develop integrated systems supporting architectural intentions.
Material selections become specific, dimensions turn precise, and system configurations receive detailed definition. Regulatory compliance verification occurs to ensure permitting success.
DD produces dimensioned drawing packages, structural system designs, MEP infrastructure layouts, material specification outlines, and refined budget estimates. This information enables contractors to provide realistic pricing.
Benefits include technical soundness confirmation, system coordination achievement, financial precision enhancement, quality standard establishment, and code compliance assurance. These outcomes minimize construction-phase surprises and associated costs.
Completing with Construction Documents
Construction Documents represent the design conclusion, generating complete building instructions for contractors and permit authorities. Design freezes at this point while documentation production intensifies.
Final deliverables encompass comprehensive architectural drawing sets, fully coordinated engineering plans across disciplines, detailed technical specifications, and complete bidding/contract documentation.
CD advantages include accurate bidding facilitation, permit acquisition enablement, construction guidance clarity, and contractual foundation strength. Documentation quality directly impacts construction efficiency and outcome quality.
Key Phase Differences
Each stage serves unique functions with distinct characteristics. SD emphasizes conceptual exploration with minimal coordination and brief timelines. DD focuses on technical refinement with intensive coordination and moderate duration. CD prioritizes comprehensive documentation with final coordination and extended timelines.
Approval requirements also differ: concept validation for SD, material and system confirmation for DD, and complete documentation acceptance for CD.
Understanding these progressions helps teams plan resources, schedule activities, and manage expectations appropriately throughout project development from inception through construction readiness.
Address: 10th floor, CIT Building, No 6, Valley 15, Duy Tan street, Cau Giay ward, Hanoi, Vietnam #vibim #vibimglobal #vibim_scan_to_bim_service #DesignDocumentation #BuildingInformationModeling
Follow ViBIM on other platforms: