Value Engineering

fuse_square
Project |
Status
Item
CSI
Estimated Savings
1
Remove copper mesh from monumental glass
$50,000.00
$50,000.00
Sum
4
Use Concrete Masonry Unit (CMU) in Lieu of Double Layer Drywall and framing at Public Restrooms
$5,000,000.00
Foundation Design Optimization
$250,000.00
Further define site plan grades, elevations, retaining walls.
$1,100,000.00
Define the engineering impact on the deep foundations due to not having a project specific current soils report
$2,500,000.00
$8,850,000.00
Sum
2
Use standard Bobrick Toilet Partitions in lieu of full-height specialty Thrislington Toilet Partitions in Public Restrooms.
$210,000.00
Use standard fabric materials for operable partitions in lieu of custom materials and or multiple materials on the same panel, allowance is $30/sy
$110,000.00
$320,000.00
Sum
$9,220,000.00