Pursuit / Conceptual
Dec 31, 2024
Mar 16, 2025
Open
25% Schematic Design Phase
Mar 15, 2025
Apr 29, 2025
Open
50% Design Development Phase
Apr 30, 2025
Jun 14, 2025
Open
75% Construction Documents Phase
Jun 16, 2025
Jul 31, 2025
Open
Addenda & Design Clarifications
Aug 1, 2025
Sep 5, 2025
Open
Hold for Contract Negotiations
Sep 5, 2025
Oct 2, 2025
Open
GMP Established / Contract Signing
Oct 3, 2025
Open
Place footing concrete
Jul 4, 2025
Jul 26, 2025
Jul 6, 2025
Jul 6, 2025
Open
Form slab-on-grade
Aug 10, 2025
Aug 20, 2025
Aug 10, 2025
Aug 20, 2025
Open
Lay CMU block walls
Aug 22, 2025
Sep 5, 2025
Aug 22, 2025
Sep 5, 2025
Open
Install brick veneer
Jul 31, 2025
Aug 25, 2025
Jul 31, 2025
Aug 25, 2025
Open
Erect structural steel columns
Jul 17, 2025
Aug 4, 2025
Jul 17, 2025
Aug 4, 2025
Open
Install steel beam connections
Jun 28, 2025
Jul 27, 2025
Jun 28, 2025
Jul 27, 2025
Open
Install plywood sheathing
Wood, Plastics & Composites
Jun 18, 2025
Jul 1, 2025
Jun 18, 2025
Jul 1, 2025
Open
Set roof trusses
Wood, Plastics & Composites
Sep 3, 2025
Sep 30, 2025
Sep 3, 2025
Sep 30, 2025
Open
Apply waterproofing membrane
Thermal & Moisture Protection
Jun 12, 2025
Jun 23, 2025
Jun 17, 2025
Jun 15, 2025
Open
Install rigid insulation
Thermal & Moisture Protection
Aug 2, 2025
Aug 21, 2025
Aug 2, 2025
Aug 21, 2025
Open
Install exterior doors and frames
Aug 13, 2025
Aug 22, 2025
Aug 13, 2025
Aug 22, 2025
Open
Mount window assemblies
Aug 24, 2025
Sep 1, 2025
Aug 24, 2025
Sep 1, 2025
Open
Paint interior walls
Aug 28, 2025
Sep 7, 2025
Aug 28, 2025
Sep 7, 2025
Open
Lay porcelain tile flooring
Aug 21, 2025
Aug 29, 2025
Aug 21, 2025
Aug 29, 2025
Open
Install toilet partitions
Jul 29, 2025
Aug 25, 2025
Jul 29, 2025
Aug 25, 2025
Open
Mount architectural signage
Jul 22, 2025
Aug 20, 2025
Jul 22, 2025
Aug 20, 2025
Open
Set rooftop HVAC units
Jul 11, 2025
Aug 2, 2025
Jul 11, 2025
Aug 2, 2025
Open
Install laboratory fume hood
Jul 11, 2025
Jul 27, 2025
Jul 11, 2025
Jul 27, 2025
Open
Place office workstations
Jul 7, 2025
Aug 2, 2025
Jul 9, 2025
Jul 9, 2025
Open
Set up cafeteria seating
Jun 22, 2025
Jul 13, 2025
Jul 6, 2025
Jun 27, 2025
Open
Construct concrete pool shell
Jul 25, 2025
Aug 1, 2025
Jul 25, 2025
Aug 1, 2025
Open
Install precast stadium seating
Jun 21, 2025
Jul 1, 2025
Jun 21, 2025
Jul 1, 2025
Open
Install passenger elevator
Aug 12, 2025
Aug 29, 2025
Aug 12, 2025
Aug 29, 2025
Open
Set escalator modules
Jul 18, 2025
Aug 16, 2025
Jul 18, 2025
Aug 16, 2025
Open
Rough-in fire sprinkler piping
Aug 12, 2025
Sep 11, 2025
Aug 12, 2025
Sep 11, 2025
Open
Install fire pump assembly
Aug 20, 2025
Sep 5, 2025
Aug 20, 2025
Sep 5, 2025
Open
Install sanitary waste piping
Jul 14, 2025
Aug 2, 2025
Jul 14, 2025
Aug 2, 2025
Open
Set plumbing fixture rough-ins
Aug 14, 2025
Aug 30, 2025
Aug 14, 2025
Aug 30, 2025
Open
Install AHUs
Heating, Ventilating & Air Conditioning (HVAC)
Jun 15, 2025
Jun 22, 2025
Jun 20, 2025
Jun 18, 2025
Open
Fabricate and install ductwork
Heating, Ventilating & Air Conditioning (HVAC)
Jul 14, 2025
Aug 10, 2025
Jul 14, 2025
Aug 10, 2025
Open
Program BAS controller
Jul 15, 2025
Aug 14, 2025
Jul 15, 2025
Aug 14, 2025
Open
Test sensor and actuator points
Aug 25, 2025
Sep 3, 2025
Aug 25, 2025
Sep 3, 2025
Open
Pull electrical feeders
Jul 9, 2025
Jul 31, 2025
Jul 9, 2025
Jul 9, 2025
Open
Install LED lighting fixtures
Jul 31, 2025
Aug 15, 2025
Jul 31, 2025
Aug 15, 2025
Open
Terminate category 6 data cabling
Jun 11, 2025
Jun 22, 2025
Jun 11, 2025
Jun 22, 2025
Open
Install telecom backbone rack
Jun 22, 2025
Jul 18, 2025
Jun 22, 2025
Jul 18, 2025
Open
Mount CCTV cameras
Electronic Safety & Security
Sep 7, 2025
Sep 22, 2025
Sep 7, 2025
Sep 22, 2025
Open
Install access control readers
Electronic Safety & Security
Aug 2, 2025
Aug 16, 2025
Aug 2, 2025
Aug 16, 2025
Open
Excavate foundation trenches
Sep 2, 2025
Sep 10, 2025
Sep 2, 2025
Sep 10, 2025
Open
Backfill around building perimeter
Jul 12, 2025
Jul 22, 2025
Jul 12, 2025
Jul 22, 2025
Open
Pave parking lot
Aug 23, 2025
Aug 30, 2025
Aug 23, 2025
Aug 30, 2025
Open
Install site hardscape pavers
Jun 27, 2025
Jul 9, 2025
Jun 27, 2025
Jul 9, 2025
Open
Install water service main
Sep 2, 2025
Sep 11, 2025
Sep 2, 2025
Sep 11, 2025
Open
Connect sanitary sewer lateral
Jul 20, 2025
Aug 12, 2025
Jul 20, 2025
Aug 12, 2025
Open
Lay asphalt roadway surface
Jun 30, 2025
Jul 8, 2025
Jun 30, 2025
Jul 8, 2025
Open
Install roadway signage
Jul 8, 2025
Aug 4, 2025
Jul 8, 2025
Aug 4, 2025
Open
Drive sheet pile bulkhead
Waterway & Marine Construction
Jul 23, 2025
Aug 5, 2025
Jul 23, 2025
Aug 5, 2025
Open
Dredge marina basin
Waterway & Marine Construction
Aug 6, 2025
Aug 28, 2025
Aug 6, 2025
Aug 28, 2025
Open
Install process piping supports
Jun 9, 2025
Jun 22, 2025
Jun 9, 2025
Jun 22, 2025
Open
Conduct pump skid startup
Jun 23, 2025
Jul 11, 2025
Jun 23, 2025
Jul 11, 2025
Open