Skip to content
Design Brief

icon picker
Schedule of Accommodation

This schedule of accommodation (SoA) was developed based on the study done at the of the project.
Schedule of Accommodations
Category
Sub Category
Space
Nos
Area per unit (m2)
Total Area
Percentage
Resilient Training (Convertible)
15
Accomodation
7
Dorm
6
35
210
10.64%
Single Room (Trainer)
6
9
54
2.74%
Sick Bay
1
20
20
1.01%
Laundry/Dry Yard
2
8
16
0.81%
Housekeeping/Store
2
5
10
0.51%
Pantry
2
5
10
0.51%
Lobby/Common Area
1
5
5
0.25%
325
16.47%
Multi Purpose
4
Resilient Hall
1
250
250
12.67%
Classrooms
6
30
180
9.12%
Meeting/Seminar
1
30
30
1.52%
Toilet
2
10
20
1.01%
480
24.33%
Toilet
2
Toilet Shared (Dorm)
6
12
72
3.65%
Toilet Single (Trainer)
6
4
24
1.22%
96
4.87%
Services
1
Kitchen
1
80
80
4.05%
80
4.05%
Public Utilities
1
Canteen
1
150
150
7.6%
150
7.6%
Administration
4
Workspace
1
Office (4 people)
1
20
20
1.01%
20
1.01%
Toilet
1
Staff Toilet (2 people)
1
4
4
0.2%
4
0.2%
Services
2
Storage
1
9
9
0.46%
Pantry
1
6
6
0.3%
15
0.76%
Public
5
Workspace
1
NGO Support Office
1
20
20
1.01%
20
1.01%
Toilet
2
Public Toilet (6 people)
2
12
24
1.22%
Public Toilet (OKU)
2
4
8
0.41%
32
1.62%
Public Utilities
2
Surau
2
35
70
3.55%
Lobby
1
50
50
2.53%
120
6.08%
Circulation & Services
3
Building Services
2
M&E rooms
2
8
16
0.81%
Waste Bay
1
15
15
0.76%
31
1.57%
Circulation
1
Circulation
1
600
600
30.41%
600
30.41%
1973
100%

Note:

The carpark block area is excluded from this SoA
Student is allowed to add additional open space area i.e. swimming pool, game courts, football field etc. These space are not calculated in as long as they are open and no roof covering over them.

Want to print your doc?
This is not the way.
Try clicking the ⋯ next to your doc name or using a keyboard shortcut (
CtrlP
) instead.