- UUK 144: Cladding on external walls
- UUK 197: Protected lobbies
- UUK 200: Stairwell ventilation for buildings exceeding 18m
- UUK 229: Access and fire-fighting measures in buildings taller than 18.3m
- UUK 230: Installation and testing of dry-riser systems
- UUK 242: Fire-fighting access spaces
- UUK 243: Fire-fighting lifts