Skip to content
Gallery
Design Studio 3B
Share
Explore
Studio Programs

icon picker
Section 3: Building Design

Task:

Individually, carry on the design process for the Putrajaya Halfway House through a series of circle studies, group discussions and consultations with tutors. In this section the expected level is LOD 200.
Students are required to develop further any one or a combination of the concept proposed in previous section to suit their own authentic concept. The students need to determine the 40% design route of their choice and develop their own SoA for the choice’s segment.
The utilisation of conceptual boards, diagrams and themes are very much encouraged in this phase even though the final products are supposed to be a preliminary presentation drawing quality.

Section 3: Objective Key Results 3
Search
Segment
Objectives
Key Results
Stretched KRs
Canvas
Section No
Submission
1
Floor Plans
To develop a set of floor plans that shows the layout of the buildings that fulfill the building’s requirements and regulations
Upper Floor Plans with at least the spaces with openings sizes and positions. (LOD 200)
3D model of each floor
Open
3
2
Sections
To develop a set of sections that shows the structure logic, multi level space configuration and integration of services
Sections with at least the spaces with openings sizes and positions (LOD 200)
3D sections
Open
3
No results from filter

Section 3: Activity Plan

Week
Session
Activity/Program
Products
LOD
5
Fri, Dec 9, 2022
Building Design (LOD 200): Start
Briefing on Building Design (LOD 200) Expectation
Briefing on Study Circle and Rotation of Facilitators
Circle Study Start
Individual Portfolio Webpage/CODA Start Study Circle Identified
200
6
Tue, Dec 13, 2022
Building Design (LOD 200): Progress
Circle Study
Exit Class Feedback
Initial Site Plan + Ground Floor Plan/Sections Mass + Architectural Configuration
200
Fri, Dec 16, 2022
Building Design (LOD 200): Progress
Circle Study
Exit Class Feedback
Developed Site Plan + Ground Floor Plan/Sections Mass + Architectural Configuration
200
7
Tue, Dec 20, 2022
Building Design (LOD 200): Progress
Circle Study
Exit Class Feedback
Developed Site Plan + Ground Floor Plan/Sections Upper Floor Plans + Basement Integration Mass + Architectural Configuration
200
Fri, Dec 23, 2022
Submission 3: Interim Crit 1
Building Design (LOD 200): End
Integrating the Structure and the Services (LOD 300): Start
Individual Portfolio Webpage/CODA Finalised Site Plan + Ground Floor Plan/Sections Upper Floor Plans + Basement Integration Mass + Architectural Configuration
200
Circle Study Group
Tutor
Name
Matric ID
Digital
Rizal bin Husin
8
ABDUL AZEEM BIN ABD. RAHMAN
203922347
AHMAD ADIL IYA
191921051
ALI YOUSEF ASHRAF ABDALLA
193921499
FAIQAH SURAIYA BINTI FUDZIL
211022472
KHAIREEN NIZAR BIN KHAMIDON
201021824
MUHAMMAD ASYRAAF BIN AFIZAL
211022534
NIK AHMAD ZAKIR BIN NIK AHMAD TADJUD
202022017
PUTERA SYAZLAN BIN ZAHARI
212022645
Ar. Mohd Kamal Abdullah
7
ABDUL MATIN BIN OMAR DANNY
193921715
ABDULLAH IMRAN BIN ABDUL RAHIM
151014775
GOH SHILEY
201021761
MOHAMED KHALED SHAKER HUSSEIN
193921564
MUHAMMAD DANISH BIN MOHAMMAD DANIEL
202021938
MUHAMMAD FARIS AZMIER BIN NASRI
211022538
OLA HAFIZ BASHIER MOHAMED
193921729
Siti Najwa Sheikh Yahya
7
CHONG WEI YEE
212022564
DEENIE H'YATT BIN JUMAT
193021517
HORAGAMPITA LASINDU RUVINDA GAMAGE
202921964
MOHAMED YASSIN BIN ABDUL KARIM
211022458
NANTIINI A/P K JAYASELAN
172018776
ONG KHAI JIE
201021762
QUTREEN NADA BINTI KHAIRUL SHAHRIL
211022444

Submissions

Sample of Expected Products

This link can't be embedded.


What supposed to be shown in a site plan


Want to print your doc?
This is not the way.
Try clicking the ⋯ next to your doc name or using a keyboard shortcut (
CtrlP
) instead.