Skip to content
Gallery
Design Studio 3B
Share
Explore
Design Brief

icon picker
Product Description

Level of Detail

LoD Content
Model Content
3D Model-based Coordination
4D Scheduling
Cost Estimation
Program Compliance
Sustainable Materials
Analysis/Simulation
Canvas
1
LOD 100
Site level coordination
Total project construction duration. Phasing of major elements
Conceptual cost allowance Example $/sf of floor area, $/hospital bed, $/parking stall, etc. assumptions on future content
Gross departmental areas
Green strategies
Strategy and performance criteria based on volumes and areas
Open
2
LOD 200
Major large object coordination
Time-scaled, ordered appearance of major activities
Estimated cost based on measurement of the generic element (i.e. generic interior wall)
Specific room requirements
Approximate quantities of materials by Green categories
Conceptual design based on geometry and assumed system types
Open
3
LOD 300
General object-level coordination
Time-scaled, ordered appearance of detailed assemblies
Estimated cost based on measurement of specific assembly (i.e. specific wall type)
FF&ampE, casework, utility connections
Precise quantities of materials with percentages of recycled and/or locally purchased materials
Approximate simulation based on specific building assemblies and engineered systems
Open
4
LOD 400
Design certainty coordination
Fabrication and assembly detail including construction means and methods (cranes, man-lifts, shoring, etc.)
Committed purchase price of specific assembly at buyout
Specific manufacturer selections
Precise simulation based on the specific manufacturer and detailed system components
Open
5
LOD 500
N/A
N/A
Record cost
Purchase documentation
Commissioning and recording of measured performance
Open
There are no rows in this table

Want to print your doc?
This is not the way.
Try clicking the ⋯ next to your doc name or using a keyboard shortcut (
CtrlP
) instead.