Skip to content
Gallery
Design Studio 3B
Share
Explore
Section 4: Integrating the Structure and the Services (+ Landscape)

icon picker
Interim Crit 2

Itinerary Program on 13th January 2023

8.30 am Briefing by Studio Master to Assessors 9.00 am Presentation Start 12.30 noon Wrap up session.


Interim Crit 2 All
Assessor
Time
Name
Venue
Rizal Husin
Zairila Juria Zainal Abidin
7
9.00 am
QUTREEN NADA BINTI KHAIRUL SHAHRIL
Gallery Block B
9.30 am
GOH SHILEY
Gallery Block B
10.00 am
CHONG WEI YEE
Gallery Block B
10.30 am
ABDUL MATIN BIN OMAR DANNY
Gallery Block B
11.00 am
MOHAMED YASSIN BIN ABDUL KARIM
Gallery Block B
11.30 am
NANTIINI A/P K JAYASELAN
Gallery Block B
12.00 noon
ABDULLAH IMRAN BIN ABDUL RAHIM
Gallery Block B
Ar Mohd Kamal Abdullah
Idris Taib
8
9.00 am
HORAGAMPITA LASINDU RUVINDA GAMAGE
Gallery Block B
9.30 am
KHAIREEN NIZAR BIN KHAMIDON
Gallery Block B
10.00 am
ABDUL AZEEM BIN ABD. RAHMAN
Gallery Block B
10.30 am
MUHAMMAD ASYRAAF BIN AFIZAL
Gallery Block B
11.00 am
ONG KHAI JIE
Gallery Block B
11.30 am
ALI YOUSEF ASHRAF ABDALLA
Gallery Block B
12.00 noon
PUTERA SYAZLAN BIN ZAHARI
Gallery Block B
12.30 noon
DEENIE H'YATT BIN JUMAT
Gallery Block B
Siti Najwa Sh Yahya
Ar Mohd Hayazi Agusi
7
9.30 am
FAIQAH SURAIYA BINTI FUDZIL
Jasmine Meeting Room
9.30 am
MUHAMMAD DANISH BIN MOHAMMAD DANIEL
Jasmine Meeting Room
10.00 am
MOHAMED KHALED SHAKER HUSSEIN
Jasmine Meeting Room
10.30 am
NIK AHMAD ZAKIR BIN NIK AHMAD TADJUD
Jasmine Meeting Room
10.30 am
OLA HAFIZ BASHIER MOHAMED
Jasmine Meeting Room
11.30 am
MUHAMMAD FARIS AZMIER BIN NASRI
Jasmine Meeting Room
12.00 noon
AHMAD ADIL IYA
Jasmine Meeting Room

Scoring Rubric

Checklists

View 2 of Floor Plans with Legend Checklist
Item
Component/Element
Comments
1
Floor Plans
Ground Floor plans within the site plan
Floor plan for each level
Basement parking layout (consider OKU etc)
Spaces coloured according to department
Legend of the drawing
Room tags
2
Space Callout plans
Floor plans for each accomodation type
Toilet layout for each accomodation type (if attached)
Furnitures and fixtures
3
Section
At least 2 Sections
Main Structure (Wall, Floor, Roof truss)
Construction details (joins between main structures)
Legends of spaces
Room tags
4
Physical 3D Model (mock up)
Main Structure (Wall, Floor, Roof truss)
Representative space size and position
Representative services space size and position
Building skin/shading device concept
There are no rows in this table
Assessor 2

Want to print your doc?
This is not the way.
Try clicking the ⋯ next to your doc name or using a keyboard shortcut (
CtrlP
) instead.