Dates: 12/29/2025 - 1/4/2026
Release completion: 75% (3 of 4 items delivered)
Additional value: 11 production bugs resolved during the release cycle, 2/2 development items completed.
Reason for 1 undelivered: Underestimated required time for QA on Redirection URL affected Convert Ticket To Task feature completion.
Planned Work
Release (3/4)
Sandbox
Target: Release | Outcome: Done | Hours: — | Links: —
Planned Owners: Farin | Actual Contributors: Hasan, Farin, Nafi, Suchi
Notes: Hasan took over the issues from Farin as they were a bit complicated at the end.
Redirection URL
Target: Release | Outcome: Done | Hours: — | Links: —
Planned Owners: Farin | Actual Contributors: Hasan, Farin, Suchi, Nafi
Notes: Hasan took over the work from Farin to ensure all necessary paths and related logic work.
Public Form in Client Portal
Target: Release | Outcome: Done | Hours: — | Links: —
Planned Owners: Abed | Actual Contributors: Abed, Hasan, Suchi, Nafi, Atik
Notes: Abed completed the feature mostly, but there were 4 bugs and few other translation issues which were taken over by Hasan.
Convert Ticket To Task
Target: Release | Outcome: Incomplete | Hours: — | Links: —
Planned Owners: Hasan | Actual Contributors: —
Notes: Hasan was out of bandwidth to fix or look at the bugs. Rebase was done last week as planned.
Development (2/2)
User purchase flow automtion journey
Target: Development | Outcome: Done | Hours: — | Links: —
Planned Owners: Nafi | Actual Contributors: Nafi, Suchi
Notes: QA needs support on updating one or two ids then their flow limited to the task description is done.
Onetime and Subscription Together
Target: Development | Outcome: Done | Hours: — | Links: —
Planned Owners: Atik | Actual Contributors: Atik, Hasan
Notes: Both addon and upsell
Test (1/1)
YouTrack and Xero Connection Feasibility Study
Target: Test | Outcome: Done | Hours: — | Links: —
Planned Owners: Hasan | Actual Contributors: Hasan, Mehzabeen
Notes: Hasan completed YouTrack study, shared the study approach; Requested Mehzabeen to follow same procedure to complete Xero. Mehzabeen followed and completed.
Triage (0/2)
Google Drive Integration
Target: Triage | Outcome: Not Started | Hours: — | Links: —
Planned Owners: Hasan | Actual Contributors: —
Notes: In last meeting team indicated that this feature has be cleaned up and a study was required to understand the amount of time needed to complete.
Public Form Automation
Target: Triage | Outcome: Not Started | Hours: — | Links: —
Planned Owners: Atik | Actual Contributors: —
Notes: To understand how much time it would need, a study has to be conducted.
Unplanned Work
Production Bug Fix (11/14)
Craftquad other 9 bugs
Target: Production Bug Fix | Outcome: Done | Hours: — | Links: —
Planned Owners: — | Actual Contributors: Hasan, Nafi, Shakib
Notes: Hasan initially assigned Shakib and then took over from him to fix 7/9 issues; Other two issues were delcared unclear by QA
Workspace not switching
Target: Production Bug Fix | Outcome: Done | Hours: — | Links: —
Planned Owners: — | Actual Contributors: Hasan
Notes: —
Excessive vertical space in service list page
Target: Production Bug Fix | Outcome: Done | Hours: — | Links: —
Planned Owners: — | Actual Contributors: Hasan
Notes: —
Active sidebar color not present (Craftquad)
Target: Production Bug Fix | Outcome: Done | Hours: — | Links: —
Planned Owners: — | Actual Contributors: Hasan, Nafi
Notes: Hasan implemented WCAG guidelines on Sidebar menu items; instructed team to study Accessibility.