ANIMAL QUARANTINE STATION
SEWAGE PRE‐TREATMENT FACILITY IMPROVEMENTS
DOA KING ST FAC
HUMAN RESOURCES OFFICE REPLACE PACKAGED AIR CONDITIONING UNIT
DOA KING STREET FACILITY
ELEVATOR REPLACEMENT
EAST MAUI WATER SYSTEMS IMPROVEMENTS ‐ HONOPOU, KEANAE, & NAHIKU
THE PROJECT WILL IMPROVE AUWAI SYSTEMS AND ENSURE A MORE RELIABLE SOURCE OF IRRIGATION WATER AND SERVE THE TARO FARMERS IN THE EAST MAUI AREA.
EAST MAUI WATER SYSTEMS IMPROVEMENTS ‐ WAILUANUI
THE PROJECT WILL IMPROVE AUWAI SYSTEMS AND ENSURE A MORE RELIABLE SOURCE OF IRRIGATION WATER AND SERVE THE TARO FARMERS IN THE EAST MAUI AREA.
GALBRAITH LANDS ‐ BOTTWELL PUMP IMPROVEMENTS
THE PROJECT WILL CONVERT THE SYSTEM TO BE POWERED BY ELECTRICITY, FOR BETTER RELIABILITY AND REDUCED COST. THE INCREASED RELIABILITY WILL ENSURE THAT FARMERS HAVE AN CONTINUOUS SUPPLY OF WATER. IT WILL ALSO PROVIDE A BACKUP ENERGY SOURCE.
KAHUKU AGRICULTURAL PARK‐ PUMP HOUSE AND MISCELLANEOUS IMPROVEMENTS
THE PUMPING STATION IMPROVEMENTS, INCLUDING PUMP REPLACEMENT ARE REQUIRED TO CONTINUOUSLY PROVIDE WATER TO FARMERS IN THE AREA AND CONTINUE AGRICULTURE PRODUCTION.
KAMUELA VACUUM COOLING PLANT ‐ DEMOLITION OF EXISTING, UNUSED WAREHOUSE
THE EXISTING, UNUSED WAREHOUSE IS KNOWN TO CONTAIN ASBESTOS AND LEAD‐ BASED PAINT. DEMOLITION IS NEEDED TO REMOVE THESE CONTAMINANTS.
KAMUELA VACUUM COOLING PLANT ‐ FSMA
PROJECT IMPROVEMENTS ARE NEEDED FOR THE KAMUELA VACUUM COOLING PLANT COOP FARMERS TO HAVE A FACILITY THAT IS IN COMPLIANCE WITH FSMA REGULATIONS .
LIVESTOCK FEED MILL
REDUCE FEED COST, WHICH IS 60‐70% OF LIVESTOCK PRODUCTION COSTS. BETTER UTILIZE NUMEROUS WASTE STREAMS (E.G. AGRICULTURE, BIODIESEL AND FOOD WASTE) AS ANIMA! FEED INGREDIENTS. LOWER FEED COST WILL REVITALIZE THE STATE'S LIVESTOCK INDUSTRY.
MAUI PLANT QUARANTINE GREENHOUSE
REPAIRS AND IMPROVEMENTS
MOLOKAI IRRIGATION SYSTEM ‐ WAIKOLU VALLEY MISCELLANEOUS IMPROVEMENTS
PROJECT IMPROVEMENTS ARE NEEDED FOR WORKERS TO SAFELY ACCESS COMPONENTS OF THE WATER COLLECTION SYSTEM FOR THE MOLOKAI IRRIGATION SYSTEM, ALLOWING THE SYSTEM TO CONTINUE OPERATION
PATHOLOGY GREENHOUSE
PROVIDE A STATE‐OF‐THE‐ART PATHOLOGY GREENHOUSE/QUARANTINE HOUSE FOR RESEARCH WORK TO COMBAT PLANT PEST AND DISEASES. MAY ALSO BE USED FOR ENVIRONMENT CONTROLLED RESEARCH ON WAYS TO REDUCE ENERGY USE, WASTE, AND CARBON.
STATE IRRIGATION SYSTEM RESERVOIR SAFETY IMPROVEMENTS ‐ WAIMANALO RESERVOIR CREST AND EMBANKMENT STABILIZATION
IMPROVEMENTS TO THE RESERVOIR ARE NEEDED TO STABILIZE THE DAM AND PREVENT POTENTIAL FAILURE.
STATEWIDE METER REPLACEMENT AND MISCELLANEOUS IMPROVEMENTS ‐ WAIMANALO, WAIMEA, & HONOKAA‐PAAUILO IRRIGATION SYSTEMS
THE PROJECT IS NEEDED TO ADDRESS AGING COMPONENTS OF AGRICULTURAL INFRASTRUCTURE AND ALLOW FOR CONTINUED SUPPLY OF AGRICULTURAL WATER TO FARMERS.
WAIAHOLE WATER SYSTEM IMPROVEMENTS
THIS PROJECT WILL ADD IRRIGATION WATER STORAGE AND A BACKUP WELL IN THE EVENT OF DROUGHT OR WATER SHORTAGE, ALLEVIATING THE NEED TO USE POTABLE WATER FOR IRRIGATION.
WAIMANALO IRRIGATION SYSTEM ‐ BASEYARD IMPROVEMENTS
THE WAIMANALO BASEYARD OFFICE AND STORAGE STRUCTURES ARE SEVERELY DETERIORATED, MAKING THE STRUCTURES VULNERABLE TO VANDALISM, THEFT, AND PEST INFESTATION. THE IMPROVEMENTS ARE NEEDED FOR THE CREW TO SUPPORT THE IRRIGATION SYSTEM AND ENSURE THAT THE FARMERS' WATER SUPPLY IS NOT DISRUPTED.
WAIMANALO IRRIGATION SYSTEM MAUNAWILI VALLEY AND MISCELLANEOUS IMPROVEMENTS, PHASE II
THE PROJECT WILL IMPROVE EFFICIENCY OF THE WATER DELIVERY
DOA KING STREET FACILITY
BASEMENT WATERPROOFING REPAIRS AND IMPROVEMENTS
DOA MAUI FACILITY
AIR CONDITIONING SYSTEM IMPROVEMENTS
HALE KANAHOAHOA
FIRE ALARM SYSTEM REPLACEMENT
REMOVE TAR AT HALAWA FACILITY
REMOVE TAR AT HALAWA FACILITY
BISHOP MUSEUM
LIFE AND SAFETY IMPROVEMENTS
CAMP MALUHIA
NEW DINING PAVILION AND MOBILE KITCHEN
DAGS BUILDINGS, OAHU
REKEY BUILDINGS AND ENTRANCE DOORS
DAGS MANAGED OFFICE BUILDINGS AND PARKING
STATEWIDE MASTER PLAN
DIAMOND HEAD THEATRE
NEW THEATRE, OAHU
ETS RADIO FACILITIES, STATEWIDE
RADIO SYSTEM ENHANCEMENT FY2020
ETS RADIO FACILITIES, STATEWIDE
EMERGENCY GENERATOR AND FUEL SYSTEM UPGRADES
ETS RADIO FACILITIES, SW
UPGRADE OF COMM EQUIP FOR P25 SYS & TRUNKING, PH 2
ETS ROUND TOP RADIO FACILITY
TOWER AND FACILITY REPLACEMENT
FORMER HONOLULU AIRPORT TOWER, OAHU
NEW COMMUNICATION EQUIPMENT ROOM
FRIENDS OF THE LIBRARY OF HAWAII
ACQUISITION OF NEW SITE AND FACILITY, OAHU
HALE KAULIKE PARKING LOT YJ
INSTALL ELECTRIC VHCL CHRGNG STN & RLTD IMPRVMTS
HAWAII COUNTY ECONOMIC OPPORTUNITY COUNCIL
NEW MECH REPAIR & TRAINING FACILITY
HAWAII ISLAND PORTUGUESE CHAMBER OF COMMERCE
CULTURAL AND EDUCATIONAL CENTER
HILO STATE OFFICE BUILDING
REROOF
ICSD KILOHANA RADIO FACILITY, KAUAI
COMMUNICATION TOWER REPLACEMENT
ICSD KUKUI COMMUNICATIONS FACILITY
COMMUNICATION EQUIPMENT BUILDING REPLACEMENT
ICSD KUKUIOLONO RADIO FACILITY, KAUAI
RENOVATE FORMER HI TEL BUILDING & DEMO FORMER HIANG FACILITY
KA HALE A KE OLA HOMELESS RESOURCE CTRS. INC.
DEMO. AND RE‐CONSTRUCT BLDG 9
KAHULUI CIVIC CENTER
UPGRADE ELECTRICAL SWITCHGEAR AND RELATED IMPROVEMENTS
KALANI HONUA
LARGE CAPACITY CESSPOOL CONVERSION
KALANIMOKU BUILDING
REPLACE SWITCHGEAR
KAUAI DOH VECTOR CONTRL & PLANT INDUSTRY FAC.,
REPAVE PARKING LOT AND DRIVEWAY
KAUAI DOH VECTOR CONTROL BUILDING
REPAIR ROOF/GUTTERS AND PAINT EXTERIOR
KEKAULUOHI BUILDING
ELECTRICAL AND ELEVATOR UPGRADES
KEKAULUOHI BUILDING
ELECTRICAL UPGRADES
KEKAULUOHI BUILDING
ELEVATOR UPGRADES
KEKUANAOA BLDG
UPGRADE ELECTRICAL MAINS
KINAU HALE
REPAIR LANAIS
KINAU HALE, KING KALAKAUA BLDG, & WAIPAHU CIV CTR
RESURF RESTRIPE LOTS L, M, W
KOHALA STATE OFFICE BUILDING
REPAIR ROOF/SOFFIT AND SEAL EXTERIOR WALLS
MAUI ARTS AND CULTURAL CENTER
NEW MAINTENANCE AND EVENT STORAGE BUILDING
MAUI ARTS AND CULTURAL CENTER
NEW DANCE STUDIOS AND CLASSROOMS
MAUI YOUTH AND FAMILY SERVICES, INC.
NEW ADMINISTRATION FACILITY
MOLOKAI STATE OFFICE BUILDING NOS. 1 & 2
INSTALL PHOTOVOLTAIC SYSTEMS
NAALEHU STATE OFFICE BUILDING
ELECTRICAL UPGRADE
PACIFIC GATEWAY CENTER
HISTORIC 653 ALA MOANA PUMP STATION REPAIRS
PUBLIC FACILITIES & SITES, STATEWIDE
IMPROVEMENTS & MAINTENANCE FOR 2019‐2021
PUBLIC FACILITIES AND SITES, STATEWIDE
PROOF OF CONCEPT FOR 2017‐2018
SHADE INSTITUTE
PLANNING AND DESIGN FOR WAIPIO POINT ACCESS ROAD IMPROVEMENTS
STATE CAPITOL BUILDING
RENOVATE ELEVATORS
STATE CAPITOL BUILDING
REPAIR METAL SOFFITS
STATE OFFICE BUILDING, STATEWIDE
REMODELING AND UPGRADES FOR FY2019
WAIMANALO COMMUNITY VALUES AND PRIORITIES
PHASE 2‐IMPLEMENTATION OF PRIORITIZED INITIATIVES
WAIPAHU CIVIC CENTER
COURTYARD AND EXTERIOR ELEVATIONS
ETS FMS
FMS
BISHOP MUSEUM
INSTALL FIRE SUPPRESSION SYSTEM
AIEA HIGH SCHOOLS
BUILDINGS A & B SHELTER HARDENING
DIAMOND HEAD CRATER, OPERATIONS SUPPORT CENTER (BUILDING 303)
BUILDING 303 ROOF REPLACEMENT
DOD FORT RUGER BUILDING 306A ALTERATIONS
DESIGN AND CONSTRUCTION FOR THE RENOVATION OF OFFICE SPACE WITHIN FORT RUGER BUILDING 306A TO CREATE A SECURED FACILITY, SECURE ROOM AND OFFICES FOR THE HAWAII STATE FUSION CENTER, AND OTHER RELATED IMPROVEMENTS.
DOD FORT RUGER BUILDING 306A ALTERATIONS
DESIGN AND CONSTRUCTION FOR THE RENOVATION OF OFFICE SPACE WITHIN FORT RUGER BUILDING 306A TO CREATE A SECURED FACILITY, SECURE ROOM AND OFFICES FOR THE HAWAII STATE FUSION CENTER, AND OTHER RELATED IMPROVEMENTS.
EMERGENCY FIBER OPTIC CABLE SYSTEM FOR DOD DIAMOND HEAD OPERATION CENTER, OAHU
DESIGN AND CONSTRUCTION OF UNDERGROUND FIBER OPTIC CABLING SYSTEM TO CONNECT STATE EMERGENCY OPERATIONS CENTER (BIRKHIMER TUNNEL) AND JOINT OPERATIONS CENTER IN BATTERY 407
ENERGY SAVINGS IMPROVEMENTS AND RENEWABLE ENERGY PROJECTS ‐ B29 PHOTOVOLTAIC AND FACILITY UPGRADE
IMPROVEMENTS WILL BE MADE TO ACCOMMODATE A PARKING LOT WITH A PHOTOVOLTAIC SYSTEM ABOVE THE PARKING STALLS AND OTHER IMPROVEMENTS TO INCLUDE ADA RAMP, CURBS, FENCES, GATES AND OTHER ELEMENTS TO SATISFY ANTI‐TERRORISM REQUIREMENTS; FENCE AND GATE ENCLOSURE FOR THE AC COOLING TOWER; EMERGENCY GENERATOR AND ELECTRIC TRANSFORMER FOR SAFETY; GALAXY ELECTRONIC ENTRY SYSTEM; AND CABLING FOR SECURITY CAMERAS.
EWA BEACH PUBLIC & SCHOOL LIBRARY
SHELTER HARDENING
FORT RUGER STATE MOTOR POOL ‐ ABOVE GROUND FUEL STORAGE TANK
DESIGN AND CONSTRUCTION FOR AN ABOVE GROUND FUEL STORAGE TANK AND ACCESSORY STRUCTURES TO SUPPORT THE DEPARTMENT OF DEFENSE STATE MOTOR POOL.
FORT RUGER, BUILDINGS 90, 90C, AND 90D,VARIOUS REPAIRS AND MAINTENANCE
REPLACE CORRUGATED METAL ROOF DECK AND INSTALLING THERMAL INSULATION BLANKET, REPLACING WALL SIDING AND FLASHING, REPLACING STEEL CHANNEL PURLINS AND STEEL FRAME, REPAINTING BUILDINGS, REPLACING WINDOWS, DEMOLISHING DAMAGED GYPSUM BOARD SHEATHING, BASE CABINET AND MEZZANINE WOOD DECK, REPLACING ELECTRICAL LIGHT FIXTURES, INSTALLING GRINDER PUMP AND CONTAINER SYSTEM AND CONNECTING TO SEWER MANHOLE, REPLACING HAND WASH SINK AND OTHER RELATED WORK.
KAHUKU ELEMETARY SCHOOL
BUILDING C CAFETERIA SHELTER HARDENING
KAUAI VETERANS CEMETERY ‐ ADDITIONAL COLUMBARIUM WALL
CONSTRUCT ONE COLUMBARIUM WALL (128 NICHES) AND PROVIDE LANDSCAPING AND WALKWAY AS REQUIRED.
KAUAI VETERANS CEMETERY ‐ NEW ACCESS ROAD, EXPANSION & IMPROVEMENTS
ADD APPROXIMATELY 350 COLUMBARIUM UNITS, 150 IN‐GROUND CREMAINS, AND 200 PRE‐PLACED DOUBLE‐DEPTH IN GROUND BURIAL CRYPTS. PROVIDE ASPHALTIC CONCRETE PAVED ACCESS ROAD AND PARKING STALLS AS REQUIRED. CONVERT EXISTING ENTRY ROAD FRONTING THE COMMITTAL SHELTER INTO A PEDESTRIAN WALKWAY, INCLUDING NEW GATE, CONCRETE PAVEMENT, SEAT WALLS, AND THREE FLAG POLES. RENOVATE EXISTING COMMITTAL SHELTER TO CREATE A NEW MAIN ENTRY AT WEST SIDE OF THE STRUCTURE AND A NEW MULTI‐PURPOSE FAMILY ROOM ON THE SOUTH END. PROVIDE AUTOMATIC IRRIGATION SYSTEM FOR THE EXISTING CEMETERY AND EXPANSION IMPROVEMENTS, INCLUDE WATER TANK AS NECESSARY, WITH CAPACITY TO IRRIGATE THE WHOLE CEMETERY AS SHOWN ON THE MASTER PLAN. UPGRADES AND/OR IMPROVEMENTS TO EXISTING ELECTRICAL, SEWER, WATER, GRADING, GRASSING, TREES, AND LANDSCAPING, FENCING, AND DRAINAGE SYSTEMS AS RELATED TO THE PROJECT SCOPE.
MAUI VETERANS CEMETERY ‐ ADDITIONAL COLUMBARIUM NICHES
CONSTRUCTION OF 640 NEW COLUMBARIUM NICHES (IN FOUR COLUMBARIUM UNITS, EACH WITH 160‐NICHES), MEMORIAL WALL, AND ASSOCIATED CONCRETE PAVEMENT WALKWAY, LANDSCAPING, AND IRRIGATION AT THE MAUI VETERANS CEMETERY.
UPGRADES AND IMPROVEMENTS TO NATIONAL GUARD READINESS CENTERS AND FACILITIES ‐ BUILDING 29 PHOTOVOLTAIC AND FACILITY UPGRADE
IMPROVEMENTS WILL BE MADE TO ACCOMMODATE A PARKING LOT WITH A PHOTOVOLTAIC SYSTEM ABOVE THE PARKING STALLS AND OTHER IMPROVEMENTS TO INCLUDE ADA RAMP, CURBS, FENCES, GATES AND OTHER ELEMENTS TO SATISFY ANTI‐ TERRORISM REQUIREMENTS; FENCE AND GATE ENCLOSURE FOR THE AC COOLING TOWER; EMERGENCY GENERATOR AND ELECTRIC TRANSFORMER FOR SAFETY; GALAXY ELECTRONIC ENTRY SYSTEM; AND CABLING FOR SECURITY CAMERAS.
UPGRADES AND IMPROVEMENTS TO NATIONAL GUARD READINESS CENTERS AND FACILITIES ‐ BUILDING 509 AND 522 DEMOLITION
DEMOLITION AND DEBRIS REMOVAL OF BLDG 509 AND 522, PREVIOUSLY UTILIZED AS THE MEDIC BUILDING, ON KEAUKAHA MILILTARY RESERVATION (KMR). TEST FOR HAZARDOUS MATERIALS, AND DISPOSE PER FEDERAL AND STATE REGULATIONS.
UPGRADES AND IMPROVEMENTS TO NATIONAL GUARD READINESS CENTERS AND FACILITIES ‐ EMERGENCY FIBER OPTIC CABLE SYSTEM FOR DOD DIAMOND HEAD OPERATION CENTER, OAHU
DESIGN AND CONSTRUCTION OF UNDERGROUND FIBER OPTIC CABLING SYSTEM TO CONNECT STATE EMERGENCY OPERATIONS CENTER (BIRKHIMER TUNNEL) AND JOINT OPERATIONS CENTER IN BATTERY 407
UPGRADES AND IMPROVEMENTS TO NATIONAL GUARD READINESS CENTERS AND FACILITIES ‐ KMR NURSES COTTAGE RENOVATIONS
RENOVATE EXISTING HISTORIC NURSES COTTAGE IN ACCORDACNE WITH US INTERIOR DEPT GUIDELINES WHICH IS ELIGIBLE FOR LISTING ON THE NATIONAL HISTORIC REFISTER
UPGRADES AND IMPROVEMENTS TO NATIONAL GUARD READINESS CENTERS AND FACILITIES ‐ KMR PAREMETER FENCING UPGRADE
FURNISH AND INSTALL APPROXIMATELY 1300 LF OF NEW CHAINLINK FENCE WITH GATES, TO INCLUDE A PARTIAL PROPERTY SITE SURVEY; INSTALLATION OF PERMANENT MONUMENT SURVEY MARKERS, CLEARING, GRADING, TREE REMOVAL, EXCAVATION AND SECURITY SIGNS.
UPGRADES AND IMPROVEMENTS TO NATIONAL GUARD READINESS CENTERS AND FACILITIES ‐ UPGRADE AND IMPROVE THE UTILITY OF THE ARMY AVIATION FACILITY, KALAELOA
TO UPGRADE THE KALAELOA AASF BUILDING 30 THAT SUPPORTS THE HIARNG AVIATION CH‐47 HELICOPTER UNITS WITH THE ADDITION OF WASH RACK AND PHOTOVOLTAIC.
YOUTH CHALLENGE ACEDEMY BLDGS 1786 & 1787 RAILING REPLACEMENT AND OTHER IMPROVEMENTS
DESIGN AND CONSTRUCTION FOR THE REPLACEMENT OF BALCONY AND STAIRWAY GUARDRAILS AT THE YOUTH CHALLENGE ACADEMY (YCA) BUILDING 1786 AND 1787.
HAWAII STATE VETERANS HOME, OAHU (VA LONG TERM CARE FACILITY, OAHU)
CONSTRUCTION FOR 120‐BED LONG TERM CARE HOME. THE WORK GENERALLY CONSISTS OF CONSTRUCTION OF A NEW SPRINKLERED STATE VETERANS HOME CONSISTING OF THREE BUILDINGS INCLUDING INTERIOR FINISHES, AND ONSITE PAVING AND OTHER SITEWORK IMPROVEMENTS: A SKILLED NURSING FACILITY/ COMMUNITY BUILDING AND TWO RESIDENTIAL NEIGHBORHOOD BUILDINGS. EACH BUILDING WILL HAVE TWO STORIES WITH MECHANICAL PENTHOUSES.
DISASTER WARNING AND COMMUNICATION DEVICES (SIRENS)
THE ALL‐HAZARD OUTDOOR SIREN WARNING SYSTEM FOR PUBLIC SAFETY IS ONE PART OF HAWAII’S STATEWIDE ALERT & WARNING SYSTEM USED TO NOTIFY THE PUBLIC DURING EMERGENCIES. HAWAII'S WARNING SIRENS ARE USED TO ALERT THE PUBLIC TO ANY EMERGENCY THAT MAY POSE A THREAT TO LIFE OR PROPERTY. THE DEPARTMENT OF ACCOUNTING & GENERAL SERVICES (DAGS) AND HAWAII EMERGENCY MANAGEMENT AGENCIES (HI‐EMA) TELECOMMUNICATIONS BRANCH IS RESPONSIBLE FOR NEW INSTALLATIONS, UPGRADES, AND MAINTENANCE OF THE 400+ SIRENS STATEWIDE. DAGS & HI‐EMA WORKS WITH OTHER STATE DEPARTMENTS & COUNTY PARTNERS TO UPGRADE EXISTING LEGACY SIRENS AND CONSTRUCT NEW SIRENS IN AREAS OF GAP COVERAGE.
DISASTER WARNING SATELITE MODEM REPLACEMENT
THE PURPOSE OF THIS REQUEST IS TO PROVIDE FUNDING FOR THE SYSTEM‐WIDE REPLACEMENT OF SATELLITE MODEMS USED TO ACTIVATE AND CONTROL DISASTER WARNING SIRENS. THE DISASTER WARNING SIRENS EMPLOY REDUNDANT CELLULAR AND SATELLITE MODEMS TO ENSURE THAT EACH SIREN RECEIVES ACTIVATION AND CONTROL SIGNALS. THE DECOMMISSIONING OF THE CURRENT SATELLITE INMARSAT I‐3 WILL AFFECT ALL 408 SIREN SATELLITE MODEMS. BACKGROUND INFORMATION FOLLOWS: THE CURRENT SATELLITE MODEM IN USE IS THE DMR800 AND WORKS ON A SYSTEM CALLED ISATM2M SERVICE ON THE INMARSAT SATELLITE I‐3 NETWORK THAT HAS AN END‐OF‐LIFE DATE OF 31 DECEMBER 2020. HI‐EMA HAS BEEN USING THIS NETWORK FOR THE PAST THIRTEEN YEARS SINCE 2007. THE NEW PLATFORM CALLED ISATDATA PRO WAS INITIATED IN 2011‐2015 ON THE INMARSAT SATELLITE NETWORK I‐ 4 AND REQUIRES A NEW ST 6100 MODEM TO OPERATE. GIVEN OUR PAST EXPERIENCE, THE STATED MISSION LIFE OF THE I‐4 SATELLITE AND SUBSEQUENT REPLACEMENT NETWORKS, AND THE EXPRESSED FORWARD COMPATIBILITY OF THE ST1600 MODEM WITH FUTURE INMARSAT SATELLITES WE ARE ESTIMATING A MINIMUM LIFE EXPECTANCY OF TEN YEARS OR MORE FOR THE REPLACEMENT MODEMS.
ENERGY SAVINGS IMPROVEMENTS AND RENEWABLE ENERGY PROJECTS ‐ B407 HVAC CHILLER
IMPROVEMENTS TO REPLACE THE HVAC CHILLER IN B407
ENERGY SAVINGS IMPROVEMENTS AND RENEWABLE ENERGY PROJECTS ‐ KMR‐AFRC SOLAR RENEWABLE
IMPROVEMENTS TO ACCOMMODATE A ROOF AND/OR PARKING LOT WITH A PHOTOVOLTAIC SYSTEM
FT. RUGER BLDG 90 COMPLEX RESURFACING
RESURFACE PAVEMNT WITHIN AND AROUND BUILDING 90. BUILDING 90 COMPLEX IS WHERE ALL OF STATE MAINTENANCE PARKS THEIR WORK VEHICLES EACH DAY. OVER TIME, THIS AREA HAS DEVELOPED POTHOLES AND CHECKS WHICH CAUSE TRIPPING HAZARDS AS WELL AS ROAD HAZARDS. DUE TO THE LARGE VOLUME OF TRAFFIC THAT THIS AREA SEES, RESURFACING THE AREA WILL PREVENT DAMAGE TO SUSPENSIONS AND TIRES OF STATE VEHICLES. ADDITIONALLY, RESURFACING THE AREA WILL MITIGATE THE POTENTIAL OF STATE PERSONNEL FROM TRIPPING OR INJURING THEMSELVES WHILE STAGING AND WORKING IN THIS AREA.
HSVC COMMITTAL PARKING REPAVEMENT
AT HSVC, THE COMMITAL AREA IS WHERE CEREMONIES ARE HELD BEFORE VETERANS ARE BURRIED. THE PARKING LOT THAT IS USED FOR THIS AREA HAS POTHOLES AND CRACKS THAT ARE GROWING IN SIZE. THE POTHOLES ARE A TRIPPING HAZARD TO ALL IN THE AREA, SO STATE MAINTENANCE TRIES TO FILL THESE POTHOLES ONCE A MONTH. BECAUSE THE WRONG MATERIAL IS USED, THE POTHOLES RESURFACE EVERY OTHER MONTH. REPAVING THE PARKING LOT WILL DECREASE THE AMOUNT OF TIMES STATE MAINTENANCE HAS TO FILL THESE HOLES AS A STOP‐GAP AND ALSO MITIGATE THE RISK OF TRIPPING.
UPGRADES AND IMPROVEMENTS TO NATIONAL GUARD READINESS CENTERS AND FACILITIES ‐ 10.9 DRY WELL REPAIR AND CLEANING
REPAIR AND CLEAN THE DRY WELL IN THE RECENTLY ACQUIRED LOT B IN KALAELOA
UPGRADES AND IMPROVEMENTS TO NATIONAL GUARD READINESS CENTERS AND FACILITIES ‐ 10.9 PERIMETER FENCING
IMPROVEMENTS WILL BE MADE TO REALIGN AND REPAIR/REPLACE 10.9 ACRE LOT B IN KALAELOA
UPGRADES AND IMPROVEMENTS TO NATIONAL GUARD READINESS CENTERS AND FACILITIES ‐ 1784 HVAC
IMPROVEMENTS TO REPLACE THE FAILING B1784 HVAC CHILLER
UPGRADES AND IMPROVEMENTS TO NATIONAL GUARD READINESS CENTERS AND FACILITIES ‐ 1874 SPLIT AC INSTALLATION
IMPROVEMENTS TO INSTALL NEW SPLIT A/C SYSTEMS IN B1874
UPGRADES AND IMPROVEMENTS TO NATIONAL GUARD READINESS CENTERS AND FACILITIES ‐ 1898 CHILLER REPLACEMENT
IMPROVEMENTS TO REPLACE THE FAILING B1898 HVAC CHILLER
UPGRADES AND IMPROVEMENTS TO NATIONAL GUARD READINESS CENTERS AND FACILITIES ‐ HIARNG‐WIDE DOOR REPLACEMENTS
IMPROVEMENTS TO REPLACE EXTERIOR DOORS AT VARIOUS HIARNG FACILITIES STATE‐ WIDE
UPGRADES AND IMPROVEMENTS TO NATIONAL GUARD READINESS CENTERS AND FACILITIES ‐ PUUNENE WATER TANK REPAIR
IMPROVEMENTS TO REMOVE RUST AND REPAIR AGING WATER TANK AT THE PUUNENE ARMORY.
FARRINGTON HIGH
I, RENOVATE 1ST FLR REST/ROOMS
FARRINGTON HIGH
AW3, 2ND FLR, RENOVATE R/RM
HEEIA ELEM
D REPLACE VENT GRILLS
HILO INTER
B REPLACE 2ND FLOOR CEILING
HONAUNAU ES – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD SPLIT SYSTEM UNITS WITH NEW EQUIPMENT. EXISTING EQUIPMENT IS NEARING 25 YEARS OLD AND IS BEYOND ITS EXPECTED USEFUL LIFE.
HONOKAA HS – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE BROKEN PACKAGED UNITS WITH HIGH EFFICIENCY VRF SPLIT SYSTEM UNITS.
HOOKENA ES – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD WINDOW UNITS WITH HIGH EFFICIENCY VRF SPLIT SYSTEM UNITS. WINDOW UNITS USE A LOT OF ENERGY AND CREATE MORE CLASSROOM NOISE THAN A VRF SPLIT SYSTEM.
IAO INTER
G RPL HEAT EXCH
JARRETT MIDDLE
E RENOVATE R/RM
KAAAWA ELEM
P‐2 , RENO R/RMS
KAHAKAI ES – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD SPLIT SYSTEM UNITS WITH HIGH EFFICIENCY EQUIPMENT. EXISTING UNITS ARE NEARING 20 YEARS OLD AND ARE BEYOND THEIR EXPECTED USEFUL LIFE.
KAHALUU ELEM
B RENOVATE R/RM
KAHALUU ELEM
D RENOVATE RRMS
KAHUKU HIGH & INTER
V REPL BLEACHERS‐ PH 1
KAHUKU HIGH & INTER
PT‐1, RENOVATE R/RMS
KAILUA HIGH
R REM / RPL GYM CEILING TILES
KAILUA INTER
B RENOV DWNSTRS STUDENT R/RMS
KAIULANI ELEM
B‐17 RECARPET CLASSROOM
KAIULANI ELEM
ABC 2ND FLR INSTL H20 FOUNTAIN
KAIULANI ELEM
C RENOVATE RRM
KALAHEO HIGH
H REPLACE LANAI FLOOR DRAINS
KALAMA INTER
WT RM REROOF & TENT
KALIHI ELEM
B‐4 REPLACE CARPET & ACM ABATEMENT
KALIHI UKA ELEM
B101‐102 RPL WNDWS TO LOUVERS
KAPIOLANI ELEM
H ROOM 40 RPL FLOOR COVERING
KAPOLEI ES – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD WINDOW AIR CONDITIONING UNITS WITH HIGH EFFICIENCY VRF SPLIT SYSTEM UNITS. SOME EXISTING EQUIPMENT 20+ YEARS OLD AND WELL BEYOND THEIR EXPECTED USEFUL LIFE. WINDOW UNITS USE A LOT OF ENERGY AND CREATE MORE CLASSROOM NOISE THAN A VRF SPLIT SYSTEM.
KAPOLEI HS – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD AIR HANDLING UNITS (AHUS) AND FAN COIL UNITS (FCUS) WITH HIGHER EFFICIENCY EQUIPMENT. EXISTING EQUIPMENT IS 15+ YEARS OLD AND AT THE END OF THEIR EXPECTED USEFUL LIFE.
KAPOLEI MS – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD AIR HANDLING UNITS, UNIT VENTILATORS AND FAN COIL UNITS WITH HIGHER EFFICIENCY EQUIPMENT. EXISTING EQUIPMENT IS 20+ YEARS OLD AND AT THE END OF THEIR EXPECTED USEFUL LIFE.
KAU HIGH & PAHALA ELEM
F REROOF/GUTTER
KAU HIGH & PAHALA ELEM
M REROOF
KAU HS – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE A PACKAGED UNIT WITH NEW EQUIPMENT. THE EXISTING PACKAGED UNIT IS EXHIBITING EXTREME CORROSION FROM THE SALT AIR IN KAU WITH THE ALUMINUM FINS FALLING OFF OF THE CONDENSER COILS.
KAULUWELA ELEM
M CARPENTRY RPRS TO CEILING
KAUNAKAKAI ES – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE AN OLD PACKAGED UNIT AND SPLIT SYSTEM UNIT WITH NEW EQUIPMENT. EXISTING EQUIPMENT IS 20+ YEARS OLD AND WELL BEYOND THEIR EXPECTED USEFUL LIFE. EXISTING EQUIPMENT IS OVERSIZED AND USING MORE ENERGY THAN NECESSARY TO COOL THE SPACE.
KEAAU ES – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD AHUS AND UNIT VENTILATORS WITH NEW EQUIPMENT. EXISTING EQUIPMENT IS 22+ YEARS OLD AND BEYOND THEIR EXPECTED USEFUL LIFE.
KEAAU MS – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD SPLIT SYSTEM UNITS WITH HIGH EFFICIENCY VRF SPLIT SYSTEM UNITS. EXISTING EQUIPMENT IS 15+ YEARS OLD AND AT THE END OF THEIR EXPECTED USEFUL LIFE.
KEKAULIKE HIGH
B REROOF
KEKAULIKE HIGH
A REROOF
KEKAULIKE HIGH
F REROOF
KEOLU ELEM
B & C SEAL UP WKWYS
KEONEPOKO ES – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD SPLIT SYSTEM UNITS AND WINDOW AIR CONDITIONING UNITS WITH NEW HIGH EFFICIENCY EQUIPMENT. EXISTING EQUIPMENT IS 18+ YEARS OLD AND AT THE END OF THEIR USEFUL LIFE.
KIHEI ELEM
E REROOF
KING INTER
DEMO TRAILER
KOHALA HS – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE AND OLD SPLIT SYSTEM UNIT WITH NEW EQUIPMENT. WE BELIEVE THE EXISTING EQUIPMENT IS 12+ YEARS OLD AND AT THE END OF ITS USEFUL LIFE.
KONAWAENA ELEM
CAMPUS REPLACE GUTTERS PH2
KONAWAENA ELEM
C INSTALL ON DEMAND WATER HEATER FOR CAFETERIA
KONAWAENA HS – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE A VERY OLD 20‐TON SPLIT SYSTEM UNIT WITH NEW EQUIPMENT. EXISTING UNIT IS 35+ YEARS OLD AND WELL BEYOND ITS EXPECTED USEFUL LIFE.
KONAWAENA MS – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD SPLIT SYSTEM UNITS WITH NEW EQUIPMENT. WE BELIEVE THE EXISTING EQUIPMENT IS 10+ YEARS OLD.
KULA ELEM
A REROOF WALKWAY
KULA ELEM
B INSTL GTR NE END
KULA ELEM
P2 INSTL SEC SCRN
KULA ELEM
P6 INSTL SEC SCRN
KULA ELEM
CAMPUS RPR IRR
KULA ELEM
A INSTL SEC SCREENS
KULA ELEM
D ADD AIR CURTAINS
KULA ELEM
D RPL GUTTER & D/S
KULA ELEM
F RPL GUTTER & D/S
KULA ELEM
A&D RPL GUTT & DNSPT
KULA ELEM
C5‐6 RPL W/ VCT
KULA ELEM
A REROOF
LAHAINA INTER
P2105 RPL CEILING P3
LAHAINA INTER
B REROOF
LAHAINA IS – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE AN EXISTING PACKAGED UNIT WITH NEW EQUIPMENT. EXISTING PACKAGED UNIT IS 12+ YEARS OLD AND NEARING THE END OF ITS USEFUL LIFE
LAHAINALUNA HIGH
S RENO LOBBY & KIT
LAHAINALUNA HIGH
S RENO INT ROOMS
LAHAINALUNA HIGH
K RPL AC
LAHAINALUNA HIGH
L REROOF
LAHAINALUNA HIGH
K REROOF & CARP RPRS
LAHAINALUNA HS – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD SPLIT AND PACKAGED UNITS WITH HIGH EFFICIENCY EQUIPMENT. EXISTING EQUIPMENT IS 16+ YEARS OLD AND AT THE END OF THEIR EXPECTED USEFUL LIFE. MOST OF THE NEW AIR CONDITIONING UNITS WILL BE HIGH EFFICIENCY VRF SPLIT SYSTEMS.
LAUPAHOEHOE SCHOOL – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE AN EXISTING 25‐TON SPLIT SYSTEM UNIT WITH NEW EQUIPMENT. EXISTING EQUIPMENT IS 17+ YEARS OLD AND NEARING THE END OF ITS USEFUL LIFE.
LIHOLIHO ELEM
J RENO R/RM
LINAPUNI ELEM
A ,B & C, REPLACE SINKS & FIXTURES
LOKELANI IS – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD SPLIT AND PACKAGED UNITS WITH HIGH EFFICIENCY EQUIPMENT. SOME OF THE EXISTING EQUIPMENT IS NEARING 30 YEARS OLD AND ANOTHER UNIT IS STILL USING R‐22 REFRIGERANT – R‐22 HAS BEEN PHASING OUT OF THE INDUSTRY AND REPLACEMENT REFRIGERANT AND EQUIPMENT IS DIFFICULT TO OBTAIN. MOST OF THE NEW AIR CONDITIONING UNITS WILL BE HIGH EFFICIENCY VRF SPLIT SYSTEMS.
LUNALILO ELEM
A,B,C REPAIRS AND PAINT RAILINGS
MAILI ES – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE THE SCHOOL’S EXISTING CHILLED WATER AIR CONDITIONING SYSTEMS WITH AIR COOLED UNITARY AIR CONDITIONING EQUIPMENT AND IS ONE OF FMB’S HIGH PRIORITY PROJECTS. THE SCHOOL’S UNDERGROUND CHILLED WATER PIPES ARE LEAKING. DESPITE MULTIPLE ATTEMPTS TO FIND THE LEAKS, FMB HAS NOT BEEN ABLE TO LOCATE THEM. FMB HAS ALSO TOLD US THAT DOE’S SERVICE CONTRACTORS HAVE HISTORICALLY NOT BEEN ABLE TO PROPERLY MAINTAIN WATER COOLED CHILLED WATER SYSTEMS. FMB EXPECTS THE NEW UNITARY EQUIPMENT WILL BE EASIER TO MAINTAIN, WHICH WILL HELP REDUCE THE LIFE CYCLE COST OF THE SCHOOLS AIR CONDITIONING OVERALL.
MAKAKILO ES – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD SPLIT SYSTEM UNITS WITH HIGH EFFICIENCY VRF SPLIT SYSTEM UNITS. EXISTING EQUIPMENT IS 13+ YEARS OLD AND AT THE END OF THEIR EXPECTED USEFUL LIFE.
MANOA ELEM
D RPL WNDWS RMS 11, 12 & 13
MAUI HIGH
K RPL BOILER
MAUI HS – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD UNIT VENTILATORS AND PACKAGED UNITS WITH NEW EQUIPMENT. WE BELIEVE THE EXISTING UNIT VENTILATORS ARE 25+ YEARS OLD.
MAUI WAENA INTER
B, C, D, E, G FIRE DOORS
MAUI WAENA IS – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD PACKAGED UNITS WITH NEW EQUIPMENT. EXISTING EQUIPMENT IS 16+ YEARS OLD AND AT THE END OF THEIR EXPECTED USEFUL LIFE.
MILILANI MIDDLE SCHOOL – CHILLER PLANT REPLACEMENT
THIS PROJECT CONSISTS OF REPLACING ALL THE EXISTING CHILLER PLANT EQUIPMENT AND IS DOE FACILITIES MAINTENANCE BRANCH’S (FMB) NUMBER ONE PRIORITY. CHILLER PLANT EQUIPMENT IS BEYOND ITS USEFUL LIFE. EQUIPMENT IS UNDERSIZED AND ONE OF THE CHILLERS HAS FAILED. CHILLER PLANT CONTROLS NO LONGER WORK PROPERLY AND CANNOT BE PROPERLY FIXED BY THE SCHOOL’S SERVICE CONTRACTOR. PROJECT WILL INSTALL VFDS ON PUMPS AND COOLING TOWERS TO REDUCE ENERGY USAGE.
MILILANI MIDDLE SCHOOL – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE
MOANALUA HIGH
A REROOF
MOLOKAI HS & IS – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD AND BROKEN WINDOW AIR CONDITIONING, SPLIT SYSTEM AND PACKAGED UNITS WITH NEW EQUIPMENT. EXISTING EQUIPMENT IS 17+ YEARS OLD AND BEYOND ITS EXPECTED USEFUL LIFE. ALL BUT ONE OF THE NEW AIR CONDITIONING UNITS WILL BE HIGH EFFICIENCY VRF SPLIT SYSTEMS.
NAALEHU ES – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD VRF SPLIT SYSTEM UNITS WITH NEW EQUIPMENT. THE SCHOOL HAS TOLD US THAT THE OUTSIDE AIR UNITS FOR THIS SYSTEM NO LONGER WORK SO THE SPACES HAVE HIGH CO2 CONCENTRATIONS. EXISTING UNITS ARE 10+ YEARS OLD AND NEARING THE END OF THEIR USEFUL LIFE.
NIU VALLEY MIDDLE
F RPR B/G R/RMS
PAHOA HS – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE AN OLD PACKAGED UNIT WITH NEW EQUIPMENT. EXISTING UNIT IS 15+ YEARS OLD AND BEYOND ITS EXPECTED USEFUL LIFE.
PALOLO ELEM
C RENOVATE R/RM
PARKER ELEM
C RPR RRMS
PRINCESS NAHIENAENA ES – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD PACKAGED UNITS WITH NEW EQUIPMENT. PACKAGED UNITS ARE 12+ YEARS OLD AND AT THE END OF THEIR EXPECTED USEFUL LIFE.
PUUHALE ELEM
B, RENOVATE RESTROOMS
RED HILL ELEM
B REPLACE RAILINGS
ROYAL ELEM
B RENOVATE R/RM PH1
STEVENSON MIDDLE
A RENOVATE 1ST FLOOR STUDENT RESTROOMS
WAHIAWA MIDDLE
L REPLACE KITCHEN EXHAUST FAN
WAIAKEA IS – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD SPLIT SYSTEM UNITS WITH NEW HIGHER EFFICIENCY EQUIPMENT. EXISTING EQUIPMENT IS NEARING 20 YEARS OLD AND AT THE END OF THEIR EXPECTED USEFUL LIFE.
WAIALUA ES – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD WINDOW AIR CONDITIONING UNITS WITH HIGH EFFICIENCY VRF SPLIT SYSTEM UNITS. EXISTING EQUIPMENT IS 18+ YEARS OLD AND WELL BEYOND THEIR EXPECTED USEFUL LIFE. WINDOW UNITS USE A LOT OF ENERGY AND CREATE MORE CLASSROOM NOISE THAN A VRF SPLIT SYSTEM.
WAIANAE HIGH
COV WKWY CONC & MTL RPRS
WAIANAE HIGH
J RPR INT & EXT CMU WALLS
WAIANAE INTER
RENOV LKRM SHOWERS AREAS
WAIKOLOA ES – AC EFFICIENCY IMPROVEMENTS
THIS PROJECT WILL REPLACE OLD SPLIT SYSTEM UNITS AND PACKAGED UNITS WITH NEW EQUIPMENT. THE LARGEST UNIT IN THIS PROJECT, A 30‐TON SPLIT SYSTEM UNIT, IS 21+ YEARS OLD AND BEYOND ITS EXPECTED USEFUL LIFE.
WAILUKU ELEM
L38‐41 RPL W/ VCT
WAILUKU ELEM
K24‐28 RPL W/ VCT
WAILUKU ELEM
G RPL CARPET W/ VCT
WASHINGTON MIDDLE
F, RENOVATE 1ST/2ND FLR RESTROOMS
JOB ORDER CONTRACTING
PENDING ADDITIONAL INFORMATION
AINA HAINA PUBLIC LIBRARY
FIRE ALARM UPGRADE
HANA PUBLIC LIBRARY
STRUCTURAL REPAIRS
HAWAII STATE LIBRARY
VARIOUS REPAIRS AND IMPROVEMENTS TO
HILO PUBLIC LIBRARY
WASTEWATER SYSTEM IMPROVEMENTS
HONOKAA PUBLIC LIBRARY
REPLACE A/C SYSTEM
KAHULUI PUBLIC LIBRARY
REPLACE A/C SYSTEM
KAHULUI PUBLIC LIBRARY
REPLACE CEILING, LIGHTING SYSTEM UPGRADE
KAILUA‐KONA PUBLIC LIBRARY
REPLACE A/C SYSTEM
KAIMUKI PUBLIC LIBRARY
PARKING LOT DRAINAGE IMPROVEMENTS
KAIMUKI PUBLIC LIBRARY
FIRE ALARM UPGRADE
KANEOHE PUBLIC LIBRARY
VARIOUS UPGRADES AND RENOVATIONS
KAPAA PUBLIC LIBRARY
FEASIBILITY STUDY TO RELOCATE LIBRARY
KEALAKEKUA PUBLIC LIBRARY
CESSPOOL CLOSURE AND WASTEWATER SYSTEM IMPROVEMENTS
MAKAWAO PUBLIC LIBRARY
DUE DILIGENCE FOR EXPANSION OF MAKAWAO LIBRARY
MILILANI PUBLIC LIBRARY
REPAVE PARKING LOT
MT. VIEW‐KEAAU PUBLIC LIBRARIES
PLANNING STUDY TO CONSOLIDATE/REPLACE MT. VIEW‐KEAAU PUBLIC LIBRARIES
PAHALA PUBLIC LIBRARY
REPLACE A/C SYSTEM
SALT LAKE/MOANALUA PUBLIC LIBRARY
RECONFIGURE & REPAVE PARKING LOT & DRIVEWAYS
SALT LAKE/MOANALUA PUBLIC LIBRARY
REROOF AND INSTALL PV SYSTEM
STATEWIDE
EVALUATION AND METHODOLOGY TO CESSPOOL CLOSURES AND WASTEWATER SYSTEM IMPROVEMENTS
STATEWIDE
UPDATE ADA TRANSITION PLAN
WAHIAWA PUBLIC LIBRARY
MISCELLANEOUS REPAIRS AND IMPROVEMENTS
WAIALUA PUBLIC LIBRARY
CESSPOOL CLOSURE AND WASTEWATER SYSTEM IMPROVEMENTS
WAIKIKI‐KAPAHULU PUBLIC LIBRARY
REPAVE PARKING LOT
WAIMEA PUBLIC LIBRARY
REPLACE CHILLER, PUMPS, AND OTHER IMPROVEMENTS
PRINCEVILLE PUBLIC LIBRARY
VARIOUS REPAIRS AND RENOVATION (REPLACE A/C, REPAIR CONCRETE FLOOR SLAB, DRAINAGE IMPROVEMENTS, LIGHTING IMPROVEMENTS)
HONOMU SUBSISTENCE AGRICULTURAL LOTS
CONSTRUCT INFRASTRUCTURE (ROADWAYS, UTILITIES) FOR UP TO 16 SUBSISTENCE AGRICULTURE LOTS IN HONOMU, HAWAII.
KAUMANA SUBDIVISION LOT REHABILITATION
REPAIRS AND MAINTENANCE, INCLUDING GRADING, DRAINAGE AND RETAINING WALLS TO THREE LOTS IN KAUMANA SUBDIVISION, ISLAND OF HAWAII.
KEOKEA‐WAIOHULI RESIDENCE LOTS, PHASE 2A
SITE IMPROVEMENTS AND INFRASTRUCTURE DEVELOPMENT FOR ROADS, WATER, DRAINAGE AND UTILITIES FOR 76 RESIDENTIAL LOTS IN KEOKEA‐WAIOHULI RESIDENCE LOTS, PHASE 2A, KULA, MAUI.
MOLOKAI VETERANS CENTER
CONSTRUCTION AND EQUIPMENT FOR A FACILITY TO PROVIDE SERVICES TO VETERANS AND HOMESTEAD RESIDENTS IN HOOLEHUA, MOLOKAI.
PULEHUNUI WASTEWATER
CONSTRUCT SITE IMPROVEMENTS AND INFRASTRUCTURE DEVELOPMENT FOR SEWAGE TREATMENT SYSTEM IMPROVEMENTS TO SERVICE THE ENTIRE PULEHUNUI DEVELOPMENT AREAS, MAUI.
PUNONO ROAD IMPROVEMENTS
REPAIRS AND MAINTENANCE INCLUDING GRADING, DRAINAGE AND INSTALLATION OF ROAD IMPROVEMENTS AT PUNONO ROAD, NIENIE, ISLAND OF HAWAII.
VARIOUS LOT IMPROVEMENTS FOR WAIEHU KOU AND PAUKUKALO SUBDIVISIONS
LOT IMPROVEMENTS INCLUDING GRADING, DRIVEWAY, RETAINING WALLS FOR VARIOUS LOTS IN WAIEHU KOU AND PAUKUKALO, ISLAND OF MAUI
ANAHOLA FARM LOTS WATER PROJECT, PHASE 2
CONSTRUCTION OF A REPLACEMENT WATER TANK WITH APPURTENANCES SERVICING THE ANAHOLA FARM LOTS IN ANAHOLA, KAUAI.
KA’U WATER SYSTEM DEVELOPMENT
CONSTRUCT WATER SYSTEM, INCLUDING A 100,000‐GALLON WATER TANK TO SERVE DHHL PASTORAL LESSEES IN KA'U, HAWAII.
KAHIKINUI DRIVE WAY REPAIRS, KAHIKINUI KULEANA HOMESTEADS
REPAIRS AND MAINTENANCE INCLUDING DEMOLITION, GRADING AND INSTALLATION OF ROAD AND DRIVEWAY IMPROVEMENTS FOR KAHIKINUI KULEANA HOMESTEADS, ISLAND OF MAUI
KEOKEA‐WAIOHULI RESIDENCE LOTS, PHASE 2B
SITE IMPROVEMENTS AND INFRASTRUCTURE DEVELOPMENT FOR ROADS, WATER, DRAINAGE AND UTILITIES FOR 76 RESIDENTIAL LOTS IN KEOKEA‐WAIOHULI RESIDENCE LOTS, PHASE 2A
LAIOPUA 4 HEMA
SITE IMPROVEMENT AND INFRASTRUCTURE DEVELOPMENT FOR ROADS, WATER, SEWER, DRAINAGE AND UTILITIES FOR 125 NEW HOMESTEAD RESIDENTIAL LOTS, VILLAGES OF LAIOPUA, KEALAKEHE, ISLAND OF HAWAII.
MOLOKAI WATER SYSTEM IMPROVEMENTS, PACKAGE 1
CONSTRUCT WATER SYSTEM IMPROVEMENTS AT SIX SITES IN HO'OLEHUA, MOLOKAI, INCLUDING WATER RESERVOIRS, BOOSTER PUMPS, CONTROL VALVES, AND WATERLINES.
NANAKULI DRAINAGE
CONSTRUCT IMPROVEMENTS TO LINED DRAINAGE CHANNEL, INCLUDING RE‐LINING, AND INSTALLATION OF FENCING IN NANAKULI, OAHU.
WAIKUPANAHA SUBSISTENCE AGRICULTURAL LOTS
CONSTRUCT INFRASTRUCTURE (ROADWAYS, UTILITIES) FOR A 30‐LOT SUBSISTENCE AGRICULTURE SUBDIVISION IN WAIMANALO, OAHU.
WAIOHULI DRAINAGE
DRAINAGE AND ROAD SAFETY IMPROVEMENTS WITHIN KEOKEA‐WAIOHULI DEVELOPMENT (KOAPUUPUU STREET AND OLAKINO STREET), KULA, MAUI.
ANAHOLA DAMS
REPAIRS AND MAINTENANCE TO THREE RESERVOIRS (DAMS) IN ANAHOLA FOR COMPLIANCE WITH HAWAII DAM SAFETY ACT, WHICH INCLUDE GRADING, DEMOLITION AND SLOPE REMEDIATION IN ANAHOLA, ISLAND OF KAUAI.
ANAHOLA FARM LOTS WATER PROJECT, PHASE 1
REPLACE APPROXIMATELY 8,200 LINEAR FEET OF WATER LINES SERVICING THE ANAHOLA FARM LOTS IN ANAHOLA, KAUAI.
EAST KAPOLEI, INCREMENT II‐C
CONSTRUCT INFRASTRUCTURE (ROADWAYS, UTILITIES, LOT GRADING) FOR A 130‐ LOT SINGLE‐FAMILY SUBDIVISION IN EAST KAPOLEI, OAHU.
HONOKAIA WATER SYSTEM IMPROVEMENTS
DEVELOPMENT AND CONSTRUCTION OF A STOCK WATER SYSTEM TO SERVICE 42 HONOKAIA PASTORAL LESSEES, INCLUDING INSTALLATION OF 104,600 GAL. WATER TANK, ABOVE GROUND DRISCOLL PIPELINES, LATERALS AND METERS, ISLAND OF HAWAII.
HONOKOWAI WATER
DEVELOPMENT OF A POTABLE WELL AND TANK SITE, TRANSMISSION LINES, CONTROL STATION, AND NEW OFFSITE WATER STORAGE TANK IN HONOKOWAI AND WAHIKULI, LAHAINA, ISLAND OF MAUI
KANEHILI PEDESTRIAN ACCESS
CONSTRUCT WALKWAYS CONNECTING THE KANEHILI SINGLE‐FAMILY SUBDIVISION TO THE KUALAKAHA'I PARKWAY AND TRANSIT FACILITIES IN EAST KAPOLEI, OAHU.
LAIOPUA RENT WITH OPTION
DEVELOPMENT OF 163 SINGLE‐FAMILY HOMES THROUGH A 15‐YEAR RENT WITH OPTION TO PURCHASE PROJECT, VILLAGES OF LAIOPUA, KEALAKEHE, ISLAND OF HAWAII.
MOLOKAI WATER SYSTEM IMPROVEMENTS, PACKAGE 2
CONSTRUCT WATER SYSTEM IMPROVEMENTS IN KALAMAULA, MOLOKAI, INCLUDING ACCESS ROAD GRADING AND PAVING AND TRANSMISSION MAIN REPLACEMENT.
PANAEWA LOT 185
SITE IMPROVEMENT AND INFRASTRUCTURE DEVELOPMENT FOR ROADS, WATER, DRAINAGE AND UTILITIES FOR 16 NEW ONE‐HALF ACRE SUBSISTENCE AGRICULTURE LEASES IN PANAEWA, ISLAND OF HAWAII
PU'UNANI HOMESTEAD
PLANNING, DESIGN AND CONSTRUCTION FOR 161 NEW RESIDENTIAL HOMESTEADS IN WAIKAPU, MAUI, ISLAND OF HAWAII.
WAIANAE VALLEY INCREMENT 4 SITE IMPROVEMENTS
CONSTRUCT INFRASTRUCTURE (ROADWAYS, UTILITIES, LOT GRADING) FOR 8 NEW HOUSE LOTS WITHIN A SINGLE‐FAMILY SUBDIVISION IN WAIANAE, OAHU.
WAIMANALO DRAINAGE (WAIOKEOLA STREAM)
CONSTRUCT IMPROVEMENTS TO DIRT DRAINAGE CHANNEL, INCLUDING INSTALLATION OF RIP RAP IN VARIOUS AREAS, AND INSTALLATION OF FENCING IN WAIMANALO, OAHU.
HAWAII YOUTH CORRECTIONAL FACILITY
SEWER SYSTEM IMPROVEMENTS
HAWAII YOUTH CORRECTIONAL FACILITY
GYMNASIUM FOUNDATION REPAIRS
HAWAII YOUTH CORRECTIONAL FACILITY
WATER SYSTEM IMPROVEMENTS
HAWAII YOUTH CORRECTIONAL FACILITY
CAMPUS IMPROVEMENTS, PLANNING
HAWAII YOUTH CORRECTIONAL FCLTY, OBSRVTN & ASSESSMENT COTTAGE
PERIMETER FENCE
HOOPONO BUILDING A
HOOPONO FLOOD ZONE REMEDIATION, OAHU‐L/S
HOOPONO BUILDING A
HO'OPONO FLOOD ZONE REMEDIATION, OAHU‐CON
HOOPONO BUILDING A
HO'OPONO FLOOD ZONE REMEDIATION, OAHU‐DES
PALOLO SITE AND BUILDING IMPROVEMENTS PHASE 4
MODERNIZATION INCLUDING HAZMAT, ELECTRICAL, MECHANICAL, KITCHEN, BATHS, PAINTING, ROOFING, SITE AND UTILITIES.
AMP 34 SECURITY PERIMETER FENCE AND GUARD GATE
SECURITY MEASURES INCLUDES BUT NOT LIMITED TO NEW SLIDING ENTRY DOORS, GATED CARD‐READER ENTRANCE, HIGHER PERIMETER FENCE
AMP 39 INSTALL SECURITY CAMERAS AT 3 SITES
INSTALL SECURITY CAMERAS AT VARIOUS SITES
ELE`ELE SITE AND BUILDING IMPROVEMENTS
INTERIOR AND EXTERIOR RENOVATION INCLUDING RENOVATION TO KITCHENS, BATHROOMS, PAINTING, REFLOORING, ELECTRICAL AND LOW FLOW PLUMBING FIXTURES, REPLACEMENT TO SEWER AND WATER LINES, REGRADING TO ADDRESS SITE EROSION, ADA IMPROVEMENTS TO UNITS AND SIDEWALKS AND ABATEMENT TO HAZMAT MATERIALS.
HALE ALOHA O PUNA SITE AND BUILDING IMPROVEMENTS
MODERNIZATION INCLUDING FLOORING, CABINETS, WINDOWS, DOORS, AND PLUMBING FIXTURES.
HAU`IKI SITE AND BUILDING IMPROVEMENTS
MODERNIZATION INCLUDING HAZMAT, ELECTRICAL, MECHANICAL, KITCHEN, BATHS, PAINTING, ROOFING, SITE AND UTILITIES. WILL INCLUDE WORK TO MOVE POWER UNDERGROUND.
KAHALE MUA ‐ FEDERAL ‐ UTILITY & SITE IMPROVEMENTS
REPLACE ALL GAS PIPING IN EACH UNIT, REPLACE ELECTRICAL BOXES
KAHEKILI EXTERIOR REHABILITATION TO BUILDINGS
REPLACE ROOF, WINDOWS, PAINT , METER GAS
KAIMALINO RE‐ROOFING, INTERIOR MAJOR MODERNIZATION, BUILDING, SITE, AND ADA IMPROVEMENTS.
INTERIOR MAJOR MOD, BUILDING AND SITE IMPROVEMENTS TO INCLUDE BUT NOT LIMITED TO: COMPLETE RENOVATION OF THE INTERIOR OF ALL UNITS, INCLUDING NEW KITCHENS, APPLIANCES, BATHROOMS, LEAD BASE PAINT AND ASBESTOS ABATEMENT, INTERIOR FINISHES, ELECTRICAL, PLUMBING, AND SEWER SYSTEMS; RENOVATION OF THE COMMUNITY CENTER; RE‐ROOFING OF ALL BUILDINGS; RE‐PAVEMENT OF ENTIRE PARKING LOT/ COMPLETE REPAIRS OF ALL SIDEWALKS/WALKWAYS; SITE LIGHTING; FENCING; NEW IRRIGATION SYSTEM AND SEWER LINES.
KAPA`A SITE AND BUILDING IMPROVEMENTS
REROOFING, REPAVEMENT, INTERIOR AND EXTERIOR RENOVATION INCLUDING RENOVATION TO KITCHENS, BATHROOMS, PAINTING, REFLOORING, ELECTRICAL AND LOW FLOW PLUMBING FIXTURES, ADA IMPROVEMENTS TO UNITS AND SIDEWALKS AND ABATEMENT TO HAZMAT MATERIALS.
LANAKILA HOMES PH. I & II BUILDING IMPROVEMENTS
REPLACE FASCIA BOARDS, RENOVATE BATHROOMS AND KITCHENS
MAKANI KAI HALE REPLACE GAS LINES
REPLACE GAS LINES FROM TANK TO UNITS
PHA‐WIDE ADA IMPROVEMENTS
ADA SITE AND BUILDING IMPROVEMENTS TO INCLUDE ACCESSIBLE ROUTES, COMMON AREAS, ACCESSIBLE UNITS AND PARKING TO INCLUDE BUT NOT LIMITED TO KITCHEN, BATHROOM, BEDROOM HALLWAY AND LANAI'S, CABINETS, COUNTER TOPS, GRAB BARS, FIXTURES AND APPLIANCES, ROLL‐IN SHOWERS, WIDENING OF DOORS AND HALLWAYS, ETC. TO MEET CURRENT UFAS, ABA AND ADA STANDARDS.
PHA‐WIDE UPGRADE TO EMERGENCY GENERATORS
UPGRADE EMERGENCY GENERATORS, TRANSFER SWITCHES AND ASSOCIATED MECHANICAL ELEMENTS.
PUMEHANA FIRE SPRINKLERS
INSTALLATION OF FIRE SPRINKLERS
PUNCHBOWL HOMES, MAJOR MODERNIZATION, EXTERIOR AND INTERIOR REPAIRS, SITE IMPROVEMENT INCLUDING FIRE ALARMS
INTERIOR MAJOR MOD, SITE AND BUILDING IMPROVEMENTS TO INCLUDE BUT NOT LIMITED TO: NEW KITCHENS, APPLIANCES, BATHROOMS, LEAD BASED PAINT AND ASBESTOS ABATEMENT, INTERIOR FINISHES, SIGNAGE, PLUMBING, ELECTRICAL & LIGHTING, REPLACE WINDOWS AND DOORS FOR 126 DWELLING UNITS, AND RENOVATION OF NON‐DWELLING UNITS. CONSTRUCTION REQUEST IS FOR PH 1 OF 2 PHASES OF CONSTRUCTION.
REAC IMPROVEMENT PHA‐WIDE
REAC IMPROVEMENTS INCLUDES BUT IS NOT LIMITED TO HEALTH, SAFETY AND SECURITY IMPROVEMENTS
NORTH SCHOOL STREET PREDEVELOPMENT
PENDING ADDITIONAL INFORMATION
NORTH SCHOOL STREET FIRST PHASE GAP FINANCING
PENDING ADDITIONAL INFORMATION
DIAMOND HEAD, LANAKILA AND LEEWARD HEALTH CENTERS
MODERNIZATION OF ELEVATORS
HAWAII STATE LABORATORIES- KAMAULEULE BUILDING, MECHANICAL SYSTEMS AND OTHER IMPROVEMENTS, 12-20-2722
REPLACE COOLING TOWERS, CHILLERS AND ANCILLARY EQUIPMENT FOR SYSTEM WIDE AIR CONDITIONING SYSTEM AT WAIMANO RIDGE FACILITY.
HILO COUNSELING CENTER & KEAWE HEALTH CENTER
IMPROVEMENTS
WAIMANO RIDGE- HALE C, CONVERT FORMER DORMITORIES INTO OFFICE SPACE, DAGS JOB NO. 12-20-0706
CONVERT FORMER WAIMANO DORMITORY TO OFFICE SPACE FOR DDD STAFF PRESENTLY LOCATED IN DIAMOND HEAD HEALTH CENTER
WAIPAHU CLUBHOUSE- NEW AIR CONDITIONING SYSTEM IMPROVEMENTS, DAGS JOB NO. 12-20-2729
INSTALL NEW AIR CONDITIONING SYSTEM. UPGRADE ELECTRICAL SERVICE TO ACCOMMODATE EQUIPMENT.
BUILDING 9, CONVERT DORMITORY INTO OFFICE SPACES, DAGS JOB NO. 12-20-2726
CONVERT FORMER WAIMANO DORMITORY TO OFFICE SPACE FOR FHSD STAFF PRESENTLY LOCATED IN WILCOX AND WILCOX ANNEX BLDGS.
HALE KAUKA VARIOUS IMPROVEMENTS, DAGS JOB NO. 12-20-2725
CONVERT FORMER WAIMANO RESIDENCE TO OFFICE SPACE FOR AMHD STAFF PRESENTLY IN LEASED SPACE
HOAPILI HALE
SECURITY IMPROVEMENTS
HOAPILI HALE
SECURITY IMPROVEMENTS
KAUAI JUDICIARY COMPLEX
REROOF AND RELATED IMPROVEMENTS, PHASE 1 AND 2
KAAHUMANU HALE
FIRE ALARM UPGRADES
FY18 MAUNAWILI FALLS TRAIL AT QUEEN'S RETREAT, OAHU
TRAIL ACCESS AND PARKING IMPROVEMENTS
FY18‐FY19 KAWAINUI MARSH, OAHU
ENVIRONMENTAL RESTORATION IMPROVEMENTS
FY19 LAHAINA SBH, MAUI
REPLACEMENT OF MARGINAL WHARF WITH FLOATING DOCK
FY20 COQUI FROG ERADICATION CONTAINMENT BARRIER, MAUI
COQUI FROG CONTAINMENT FENCE
FY20 KAENA PT NAR FENCE, OAHU
REPLACEMENT OF PORTIONS OF PREDATOR PROOF FENCE AND GATES
FY20 KAILUA KONA WHARF LOADING DOCK, HI
LOADING DOCK REPLACEMENT
FY20 KANAIO DRY FOREST FENCE, MAUI
DRYLAND FOREST PROTECTION FENCE
FY20 ROYAL HAWAIIAN GROIN REPLACEMENT, OAHU
REPLACEMENT OF GROIN TO TRAP/RETAIN SAND ON WAIKIKI BEACH
FY20 WATERSHED PROTECTION AND INITIATIVES, SW
WATERSHED PROTECTION AND RESTORATION AT VARIOUS SW LOCATIONS
ANUENUE FRC SEWER LINE, OAHU
CONSTRUCTION OF NEW SEWER LINE CONNECTING TWO EXISTING RESTROOMS TO THE EXISTING CITY SEWER, INCLUDING A STUB‐OUT FOR FUTURE RESTROOM/SHOWER BUILDING
FY19 DOFAW OAHU BASEYARD, OAHU
REPLACEMENT OF WASTEWATER TREATMENT SYSTEM
HEEIA KEA SBH, OAHU
CONSTRUCTION OF WASTEWATER SYSTEM IMPROVEMENTS
KAHULUI SBH, MAUI
CONSTRUCTION OF COMFORT STATION
LAHAINA BOAT HARBOR FERRY PIER, MAUI
CONSTRUCTION FOR A FERRY PIER AND RELATED IMPROVEMENTS AT THE LAHAINA BOAT HARBOR. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.
MAKENA STATE PARK, PHASE 2 PARK IMPROVEMENTS, MAUI
CONSTRUCTION FOR TWO NEW COMFORT STATIONS, ONE AT EACH PARKING LOT OF THE BEACH PARK, INCLUDING PARKING LOT IMPROVEMENTS, SITE IMPROVEMENTS AND RELATED WORK
MALAEKAHANA SRA KAHUKU SECTION PARK IMPROVEMENTS PHASE 1, OAHU
CONSTRUCTION OF PARK IMPROVEMENTS INCLUDING ACCESS ROAD, PARKING, COMFORT STATION, POT WASHING STATIONS WITH GREASE INTERCEPTORS, SATELLITE RESTROOM AND MISCELLANEOUS RELATED WORK.
UPCOUNTRY MAUI WELL, MAUI
PLANS, DESIGN AND CONSTRUCTION FOR WATER WELL IN UPCOUNTRY MAUI.
WEST HAWAII BASEYARD WAREHOUSE
PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR A WARE HOUSE FACILITY AT THE WAIMEA STATE TREE NURSERY.
AHIHI KINAU NATURAL AREA RESERVE BOUNDARY FENCE, MAUI
CONSTRUCTION OF FENCE TO PROTECT NATIVE DRYLAND ECOSYSTEMS
AHIHI‐KINAU NATURAL AREA RESERVE OFFICE AND VISITOR CENTER, MAUI
REPLACE TRAILER TEMPORARY OFFICES, AND CREATE OFFICE AND VOLUNTEERS MEETING COMPLEX INSIDE THE EXISTING FOOTPRINT OF THE TRAILER FENCED AREA
ALA WAI CANAL WALL IMPROVEMENTS, OAHU
RECONSTRUCTION OF FAILING PORTIONS OF CANAL WALLS
ALAKAI RARE PLANT BOG FENCES, KAUAI
CONSTRUCTION OF FENCE TO PROTECT MULTIPLE ENDANGERED PLANT SPECIES
BASEYARD FENCE SECURITY, MAUI
CONSTRUCTION OF FENCE TO PREVENT VANDALISM AND THEFT AROUND BASEYARD
DOFAW MAKIKI BASEYARD, OAHU
CONSTRUCTION FOR WASTEWATER SYSTEM IMPROVEMENTS
DOFAW MAUI DISTRICT BASEYARD CONSTRUCTION AND RENOVATION, MAUI
BASEYARD CONSTRUCTION OF OFFICE, HEAVY EQUIPMENT SHOP, PARKING, AND NURSERY TO MEET DISTRICT NEEDS
DOFAW MAUI DISTRICT BASEYARD CONSTRUCTION OF COVERED PARKING, MAUI
CONSTRUCT COVERED PARKING ON EXISTING SLAB TO PROTECT NEW VEHICLES CURRENTLY EXPOSED TO ELEMENTS
DOFAW MAUI DISTRICT BASEYARD GRADE AND ASPHALT NEW PARKING AREA, MAUI
GRADE AND ASPHALT NEW PARKING AREA ADDITION TO BASEYARD TO PROVIDE NEEDED PARKING FOR OPERATIONS
ENDANGERED PLANT RECOVERY
CONSTRUCTION OF HERBIVORE AND PREDATOR PROOF FENCES AND FACILITIES FOR RARE AND ENDANGERED PLANTS
ENDANGERED SEABIRD RECOVERY
CONSTRUCTION OF HERBIVORE AND PREDATOR PROOF FENCES FOR RARE AND ENDANGERED SEABIRDS
ENDANGERED SNAIL RECOVERY
CONSTRUCTION OF PREDATOR PROOF FENCES FOR RARE AND ENDANGERED SNAILS
FOREST RESERVE FIRE PREVENTION (FUELBREAKS) ‐ KAUAI
KAUAI (250K), MAUI(250K), AND W. HAWAII (552K), OAHU (500K)
FOREST RESERVE FIRE PREVENTION (FUELBREAKS) ‐ MAUI
KAUAI (250K), MAUI(250K), AND W. HAWAII (552K), OAHU (500K)
FOREST RESERVE FIRE PREVENTION (FUELBREAKS) ‐ OAHU
KAUAI (250K), MAUI(250K), AND W. HAWAII (552K), OAHU (500K)
FOREST RESERVE FIRE PREVENTION (FUELBREAKS) ‐ W. HAWAII
KAUAI (250K), MAUI(250K), AND W. HAWAII (552K), OAHU (500K)
FOREST RESERVE INFRASTRUCTURE & ACCESS
PLANS, DESIGN, AND CONSTRUCTION FOR DOFAW FOREST RESERVE INFRASTRUCTURE PROJECTS FOR ACCESS AND PUBLIC SAFETY STATEWIDE, INCLUDING REPAIR AND IMPROVEMENT FOR ROADS, CABINS, CAMPSITES, AND REMOVAL OF HAZARDOUS MATERIALS.
FORESTRY ROAD REPAIRS
PLANS, DESIGN, EQUIPMENT, AND CONSTRUCTION FOR REPAIR OF VARIOUS FORESTRY ROADS ON OAHU
FY 21 KAENA POINT PREDATOR PROOF FENCE RETROFITS, OAHU
PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR REPLACEMENT OF EXISTING FENCE AND GATES
FY21 WATERSHED PROTECTION AND INITIATIVES, SW
PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION, AND EQUIPMENT TO PROTECT AND RESTORE FORESTED WATERSHEDS AND OTHER WATER SUPPLIES, STATEWIDE; EQUIPMENT AND APPURTENANCES, AND ALL PROJECT RELATED COSTS. THE LEGISLATURE FINDS AND DECLARES THAT THE APPROPRIATION IS IN THE PUBLIC INTEREST AND FOR THE PUBLIC'S HEALTH, SAFETY AND GENERAL WELFARE OF THE STATE.
HAKALAU FENCE REPLACEMENT
CONSTRUCTION FOR REPLACING DAMAGED UNGULATE FENCES
HALEAKALA ALPINE WILDLIFE SANCTUARY PREDATOR PROOF FENCE UNITS, MAUI
CONSTRUCTION OF PREDATOR PROOF FENCE TO PROTECT ENDANGERED SEABIRDS
HALEPAAKAI CAMP IMPROVEMENTS
REPLACEMENT OF BOARDWALK AND HELICOPTER LZ
HAWAII DISTRICT LAND OFFICE, HILO, HAWAII
CONSTRUCTION FOR RENOVATION OF EXISTING BUILDING FOR NEW DLNR HAWAII DISTRICT LAND OFFICE
HILO BASEYARD ASPHALT REPAIR AND MAINTENANCE
ASPHALT REPAIR AND SEAL COATING.
HILO BASEYARD HANGAR IMPROVEMENTS
PLANS, DESIGN, AND CONSTRUCTION FOR UPGRADES TO THE HILO DOFAW BASEYARD HANGAR
HILO FOREST RESERVE NUKUPAHU FENCE
CONSTRUCTION OF A FENCE TO PROTECT APPROXIMATELY 1,200 ACRES OF WATERSHED, FOREST BIRD, AND RARE PLANT HABITAT.
HILO OFFICE ROOF REPLACEMENT
PURCHASE ROOFING AND REPLACE OLD EXISTING ROOF
HILO WAREHOUSE ROOF REPLACEMENT
CONTRACT THE LABOR TO REPLACE THE CARPENTER AND MECHANIC SHOP ROOF. WE HAVE THE NEW ROOFING ON HAND.
HONOPU WEATHERPORT, KAUAI
PLANS, LAND, DESIGN, CONSTRUCTION AND EQUIPMENT FOR SHELTER FOR FIELD CREWS
HONUAULA ACCESS ROAD
ACCESS ROAD TO HONUAULA FOREST RESERVE
HOOKENA‐HONAUNAU TRAIL SURVEY AND DOCUMENTATION.
METES AND BOUNDS SURVEY OF A 1.5MI. SECTION OF THE OLD GOVERNMENT ROAD THAT CROSSES MULTIPLE PRIVATE LAND HOLDINGS. WITH THE SURVEY THE TRAIL CAN BE TRANSFERRED TO NA ALA HELE AND OPENED TO THE PUBLIC.
HULIHE‘E PALACE SM IMPROVEMENTS, HAWAII
CONSTRUCTION FOR VARIOUS IMPROVEMENTS, INCLUDING WALLS, LANAIS, ROCKWALLS, SEAWALL AND GROUNDS.
IAO VALLEY STATE MONUMENT PARK IMPROVEMENTS, MAUI
CONSTRUCTION FOR PARK IMPROVEMENTS INCLUDING REPLACING THE WATER AND ELECTRICAL LINES, PARKING LOT AND WALKWAYS.
INVERTEBRATE AND PLANT PROPAGATION FACILITY, OAHU
PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR INVERTEBRATE AND PLANT PROPAGATION FACILITY AND BASEYARD IMPROVEMENTS
JUDD TRAIL SURVEY AND DOCUMENTATION
ARCHEOLOGICAL, METES AND BOUNDS SURVEY OF A 0.86 MILE SECTION BETWEEN ALII DRIVE AND KUAKINI HIGHWAY. THIS WILL ALLOW THE PRESERVATION OF THE ARCHEOLOGICAL FEATURES AND FUTURE OPENING FOR PUBLIC USE. A PRESERVATION PLAN, CULTURAL IMPACT ASSESSMENT AND PREPARATION OF QUIT CLAIM DEEDS.
KAALA BOARDWALK REPLACEMENT AND SIGNAGE
PLANS, DESIGN, AND CONSTRUCTION FOR BOARDWALK AND SIGNAGE AT MOUNT KAALA NATURAL AREA RESERVE
KAHANAIKI ACCESS ROAD IMP.
CONSTRUCT NEW ROAD WAY AND GATE FOR KAHANAIKI
KAHIKINUI WATERSHED FENCING
PLANS, DESIGN, AND CONSTRUCTION FOR INTERNAL FENCES FOR MANAGEMENT UNITS TO FACILITATE PROGRESSIVE UNGULATE REMOVAL AND RESTORATION IN LEEWARD HALEAKALA.
KAHOOLAWE EDUCATION AND OPERATIONS CENTER, KIHEI, MAUI
PLANNING, DESIGN AND CONSTRUCTION FOR PHASE I, INCLUDING COMPLETION OF PLANNING FOR DEVELOPMENT OF EDUCATIONAL FEATURES AND EXHIBITS, COMPLETION OF CONSTRUCTION DRAWINGS AND SPECIFICATIONS, AND CONSTRUCTION OF BIO‐SECURE NURSERY TO GENERATE AND PREPARE PLANTING MATERIALS TO CONTINUE KAHOOLAWE RESTORATION.
KANAHENA TO KANALOA FENCE, MAUI
CONSTRUCTION OF FENCE TO PROTECT NATIVE COASTAL ECOSYSTEMS
KAPAPALA COOPERATIVE HUNTING AREA IMPROVEMENTS
WORK CLOSELY WITH KAPAPALA RANCH SO DOFAW'S ACTIVITIES ARE MUTUALLY BENEFICIAL TO LIVESTOCK PRODUCTION AND RANCH OPERATIONS. PREPARE A COOPERATIVE PUBLIC HUNTING PLAN; STRATEGIC FENCING; WATER SYSTEM DEVELOPMENT AND UPGRADES; FEED, MINERAL AND HABITAT MANAGEMENT.
KAPAPALA FOREST RESERVE FENCE REPLACEMENT
REPLACE 4 MILES OF FENCE DESTROYED BY HALEMAUMAU EMISSIONS ON THE BOUNDARY BETWEEN KAPAPALA RANCH AND KAPAPALA FOREST RESERVE.
KAU FOREST RESERVE BOUNDARY REPLACEMENT, HAWAII
REPLACEMENT OF VOG‐DAMAGED FENCE FOR WATERSHED AND ECOSYSTEM PROTECTION ACROSS MULTIPLE FENCE UNITS
KAU FOREST RESERVE FENCE, HAWAII
CONSTRUCTION OF FENCE TO PROTECT NATIVE ECOSYSTEMS AND WATERSHEDS
KAWAINUI LEVEE AND WAIAUIA ACCESS IMP.
CONSTRUCT ROAD WAYS, GATE INFRASTRUCTURE AND CREATE NEW ACCESS FOR WAIAUIA
KAWAINUI MARSH LEVEE IMPROVEMENTS, OAHU
CONSTRUCTION FOR STABILIZATION OF FLOOD CONTROL LEVEE
KAWAINUI RESTORATION‐‐MOKULANA ACCESS IMP
CONSTRUCT ROAD WAY AND STAGING AREAS AT MOKULANA
KEANAKOLU CABIN IMPROVEMENTS
DESIGN AND CONSTRUCTION FOR CABIN IMPROVEMENTS
KOKEE MID‐ELEVATION FACILITIES WATER SYSTEM AND NURSERY IMPROVEMENTS, KAUAI
CONSTRUCTION FOR WATER SYSTEM AND NURSERY IMPROVEMENTS
KOOLAU ENDANGERED TREE SNAIL PREDATOR‐PROOF FENCE, OAHU
PLANS, LAND, DESIGN, CONSTRUCTION AND EQUIPMENT FOR PREDATOR PROOF FENCE
KOOLAU FOREST RESERVE, KEANAE ARBORETUM ACCESS ROAD WIDENING AND IMPROVEMENT, MAUI
WIDENING OF ARBORETUM ACCESS ROAD AND RESURFACE, MERGED INTO STATEWIDE REQUEST.
KULA FOREST RESERVE FIREBREAK IMPROVEMENT (BRUSH MITIGATION)
BRUSH MITIGATION TO WIDEN FIREBREAK WIDTH; REQUEST MERGED INTO ADMIN STATEWIDE REQUEST
LAHAINA SBH, MAUI
CONSTRUCTION OF RANGE LIGHT MODIFICATIONS
LANAI GAME MANAGEMENT AREA, PLANNING AND IMPROVEMENTS, LANAI, MAUI, ROADS, FENCES, HABITAT MANAGEMENT
DEVELOP AND IMPLEMENT MANAGEMENT FOR PUBLIC HUNTING, RESOURCE PROTECTION, HABITAT IMPROVEMENT.
LEEWARD HALEAKALA TREE PLANTING
PLANTING 200,000 NATIVE TREES.
LUPEA FOREST PROTECTION FENCE
CONSTRUCTION OF FENCE TO PROTECT 4,500 ACRES OF MESIC AND DRYLAND FOREST IN KONA
LYON ARBORETUM SEED BANK FACILITY UPGRADES, OAHU
PLANS, LAND, DESIGN, CONSTRUCTION AND EQUIPMENT TO RENOVATE SEED BANK FACILITY
MAALAEA FIRE PREVENTION AND SUPPRESSION, MAUI
CONSTRUCTION OF FIREBREAKS, FUELS MITIGATION, SEDIMENTATION CONTROL, AND DIP TANKS.
MOHIHI CAMP IMPROVEMENTS
INSTALLATION OF WEATHERPORT, DECK AND LUA
MOLOKAI BASEYARD IMPROVEMENTS, MOLOKAI
PLANS, LAND, DESIGN, CONSTRUCTION AND EQUIPMENT FOR PREDATOR PROOF FENCE
NA ALA HELE PROGRAM PLAN
UPDATING THE ORIGINAL AND OUTDATED 1991 PROGRAM PLAN
NA ALA HELE TRAIL HEAD AND PARKING IMPROVEMENTS
CONSTRUCTION OF ACCESSIBLE PARKING, ACCESS AND INTERPRETIVE SIGNS AT 7 TRAILS. PUU OO, PUNA TRAIL, AINAPO ROAD/TRAIL, UPPER WAIAKEA ATV PARK, KAUMANA TRAIL AND DR'S PIT TRAIL.
NAWILIWILI SBH, KAUAI
CONSTRUCTION OF PIER 400 FLOATING DOCK IMPROVEMENTS
OAHU PLANT NURSERY IMPROVEMENTS
CONSTRUCTION OF INFRASTRUCTURE IMPROVEMENTS TO VARIOUS STATE‐RUN NURSERIES.
PIA VALLEY INFRASTRUCTURE
PLANS, DESIGN, AND CONSTRUCTION OF FENCES, SIGNAGE, AND TRAIL IMPROVEMENTS FOR NEW RESERVE.
POUHALA MARSH RESTORATION PHASE I
EIGHT ACRE RESTORATION POND CONSTRUCTION
PUA LOKE BASEYARD CONFERENCE AND OFFICE CENTER, KAUAI
PLANS, LAND, DESIGN, CONSTRUCTION AND EQUIPMENT FOR CONFERENCE AND OFFICE FACILITY
PUA LOKE BASEYARD FIBER OPTIC CABLE UPGRADES, KAUAI
CONSTRUCTION FOR FIBER OPTIC CABLE UPGRADES AT PUA LOKE BASEYARD
PUAKEA BAY TRAIL SAFETY IMPROVEMENTS
CERTIFIED SHORELINE SURVEY, METES AND BOUNDS, TRAIL SAFETY ASSESSMENT
PUU MAKAALA AND PUU O UMI NATURAL AREA RESERVE BIRD AND SNAIL PREDATOR REMOVAL
INSTALLING A PREDATOR CONTROL GRID TO PROTECT SNAILS AND SEABIRDS, FOREST BIRDS.
PUU MAKAALA NATURAL AREA RESERVE PREDATOR PROOF FOREST BIRD FENCE
CONSTRUCTION OF THE FIRST PREDATOR PROOF FENCE TO PROTECT FOREST BIRDS. THIS WOULD PROTECT 6 ENDANGERED BIRDS AND ONE SPECIES OF CONCERN ACROSS 950 ACRES.
PUU MAKAALA NATURAL AREA RESERVE, KULANI TRACT FIRE WATER SYSTEM REFURBISHMENT
PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR WATER CATCHMENT REFURBISHMENT TO SUPPORT WILDFIRE SUPPRESSION AND REFORESTATION.
PUU O UMI NATURAL AREA RESERVE SHELTER
CONSTRUCTION OF DECK FOR CAMP TRIPS TO SUPPORT RARE PLANT, SEABIRD, AND SNAIL MANAGEMENT
PUU OO SADDLE HOUSE IMPROVEMENTS
DESIGN AND CONSTRUCTION FOR CABIN IMPROVEMENTS
PUU WAAWAA FOREST RESERVE KILEO ALTERNATE FENCE, HAWAII
CONSTRUCTION OF FENCE TO PROTECT NATIVE ECOSYSTEMS AND WATERSHEDS
PUU WAAWAA FOREST RESERVE ZANTHOXYLUM II FENCE, HAWAII
CONSTRUCTION OF FENCE TO PROTECT MULTIPLE ENDANGERED PLANT SPECIES
RARE PLANT NURSERY EMERGENCY BACKUP GENERATORS AND IRRIGATION, STATEWIDE
PLANS, LAND, DESIGN, CONSTRUCTION AND EQUIPMENT FOR EMERGENCY GENERATORS AND IRRIGATION SYSTEMS FOR PROPAGATION AND SEED BANK FACILITIES
SAND ISLAND SRA, PHASE 2 SEWER SYSTEM IMPROVEMENTS, OAHU
CONSTRUCTION FOR REPLACEMENTS OF SEWER MAINS AND LATERALS, INSTALLATION OF GRINDER PUMPS, RELOCATION OF PUMP STATION, AND RELATED WORK.
SECURITY CAMERA SYSTEM FOR WEST HAWAII BASEYARD
INSTALLATION OF A CAMERA SYSTEM TO INCREASE SECURITY FOR THE BASEYARD.
TREE PLANTING IN KOHALA, KULANI, AND WAIMAU
REFORESTATION FROM LOCALLY SOURCED SEEDLINGS
WAIAKOA LOOP TRAIL AND BOUNDARY TRAIL BRIDGE INSTALLATIONS
INSTALL BRIDGES AT 8 WASHOUT AREAS TO PROVIDE COST EFFECTIVE SOLUTION TO HIGH MAINTENANCE AREAS.
WAIANAPANAPA SP, MAUI
CONSTRUCTION FOR NEW COMFORT STATION AND WASTEWATER SYSTEM, ADA AND PARKING IMPROVEMENTS
WAIMANO BASEYARD RENOVATION
PLANS, DESIGN, AND CONSTRUCTION FOR RENOVATION OF BUILDING AND SEED STORAGE LABORATORY
WAIMEA BASEYARD OFFICE
PLANS AND DESIGN FOR WAIMEA BASEYARD ADMINISTRATIVE OFFICE AND BASEYARD DEVELOPMENT PLAN
WAIMEA BASEYARD PAVEMENT ADDITION AND MAINTENANCE
EXPANSION OF PAVEMENT TO INCREASE STORAGE AREA AND NURSERY PRODUCTION AREA. SEALING OF EXISTING ASPHALT TO EXTEND USEFUL LIFE.
WAIMEA BASEYARD SECURITY FENCE
CONSTRUCTION OF A NEW 6' CHAIN‐LINK FENCE SURROUNDING THE BASEYARD TO INCREASE SECURITY.
WAIMEA WAREHOUSE ROOF REPLACEMENT
CONTRACT THE LABOR TO REPLACE THE CARPENTER AND MECHANIC SHOP ROOF. WE HAVE THE NEW ROOFING ON HAND.
WEST HAWAII WATER INFRASTRUCTURE FOR FIRE SUPPRESSION
IMPROVEMENT OF FUEL BREAK NETWORK AT PUU WAAWAA FR AND PUU ANAHULU GMA AND 4 50K GAL WATER TANKS
WEST MAUI PREDATOR PROOF SNAIL FENCE, MAUI
CONSTRUCTION OF PREDATOR PROOF FENCE TO PREVENT SNAIL POPULATIONS FROM EXTINCTION
DEPT OF PUBLIC SAFETY FACILITIES ON OAHU
SUSTAINABILITY IMPROVEMENTS
DEPT OF PUBLIC SAFETY FACILITIES STATEWIDE
ARCH BARRIER REMOVAL & RELATED IMPS
HALAWA CORRECTIONAL FACILITY
REPLACE COOLING TOWER, ADD DINING HALL AIR CONDITIONING AND RELATED IMPROVEMENTS
HALAWA CORRECTIONAL FACILITY
PERIMETER FENCE REPLACEMENT AND RELATED IMPS
HALAWA CORRECTIONAL FACILITY
MECHANICAL & ELECTRICAL INFRASTRUCTURE IMPS
HALAWA CORRECTIONAL FACILITY
SPECIAL NEEDS FACILITY, CHILLER REPL. & ASSOC. REP & IMPS
HAWAII COMMUNITY CORRECTIONAL CENTER
REPLACE SECURITY DOORS
HAWAII COMMUNITY CORRECTIONAL CTR
HALE NANI, SUPPORT SERVICES BUILDING
HAWAII COMMUNITY CORRECTIONAL CTR
HALE NANI ANNEX FIRE PROT & LIFE SAFETY IMPS
HAWAII COMMUNITY CORRECTIONAL CTR
MECHANICAL & ELECTRICAL SYSTEMS REPAIRS & IMPROVEMENTS
KAUAI COMMUNITY CORRECTIONAL CENTER
MECHANICAL AND ELECTRICAL SYSTEMS REPAIRS AND IMPROVEMENTS
KAUAI COMMUNITY CORRECTIONAL CENTER
FOOD SERVICE UNIT FLOOR REPL & REL IMPS
KULANI CORRECTIONAL FACILITY
VARIOUS SECURITY SYSTEM IMPROVEMENTS
KULANI CORRECTIONAL FACILITY
MECH & ELECT SYSTEMS REPAIRS & IMPS PHASE 1 (CONST)
KULANI CORRECTIONAL FCLTY
MECH & ELECT SYSTEMS REPAIRS & IMPS PHASE 1 (CONST)
MAUI COMMUNITY CORRECTIONAL CENTER
DORMITORY 3 ROOFING SYS RENOV AND REL IMPS
MAUI COMMUNITY CORRECTIONAL CENTER
MECHANICAL AND ELECTRICAL SYSTEMS REPAIRS AND IMPROVEMENTS
MAUI COMMUNITY CORRECTIONAL CENTER
DORMS 1 & 2 ROOFING SYS RENOV AND REL IMPS
OAHU COMMUNITY CORRECTIONAL CENTER
MECHANICAL & ELECTRICAL INFRASTRUCTURE IMPS
WAIAWA CORRECTIONAL FACILITY
NEW DOMESTIC WATER SYS AND RELATED IMPROVEMENTS
WAIAWA CORRECTIONAL FACILITY
MECH & ELECT SYSTEMS REPAIRS & IMPS PHASE1(CONST)
WAIAWA CORRECTIONAL FACILITY
FARM WASH STATION AND RELATED IMPROVEMENTS
WAIAWA CORRECTIONAL FACILITY
FIRE PROTECTION SYSTEMS REPAIRS AND IMPROVEMENTS
WOMEN'S COMMUNITY CORRECTIONAL CENTER
HOOKIPA MAKAI COTTAGE RENOVATION FOR NEW CONSOLIDATED FEMALE HOUSING
WOMEN'S COMMUNITY CORRECTIONAL CENTER
MECHANICAL AND ELECTRICAL SYSTEMS REPAIRS AND IMPROVEMENTS
HAWAII COMMUNITY CORRECTIONAL CENTER
NEW MEDIUM SECURITY HOUSING
KAUAI COMMUNITY CORRECTIONAL CENTER
NEW MEDIUM SECURITY HOUSING
KAUAI COMMUNITY CORRECTIONAL CENTER
RESTROOMS & SHOWERS REPAIRS & IMPRVMTS
MAUI COMMUNITY CORRECTIONAL CENTER
NEW MEDIUM SECURITY HOUSING
WOMEN'S COMMUNITY CORRECTIONAL CENTER (WCCC)
NEW HOUSING AND RELATED IMPROVEMENTS; DAGS JOB NO. 12‐27‐5704
PSD 900, P5674 ‐ HALAWA CORRECTIONAL FACILITY (HCF), CONSOLIDATED HEALTH CARE UNIT, OAHU. DAGS JOB NO. 12‐27‐5674
CONSTRUCTION AND EQUIPMENT TO CONSOLIDATE ALL OF THE HEALTH CARE UNIT (HCU) FUNCTIONS AT HCF TO A CENTRAL LOCATION ON THE MAIN CAMPUS SITE. FUNDING REQUEST TO SUPPLEMENT CONSTRUCTION PHASE.
RENOVATE THE KEONI ANA BUILDING FOR PSD, OAHU
CONSTRUCTION AND EQUIPMENT TO RENOVATE AND UPGRADE THE EXISTING KEONI ANA BUILDING, 1177 ALAKEA STREET, FOR THE RELOCATION OF PSD AND ITS RELATED ADMINISTRATION AND PROGRAM OFFICES. DAGS CONSTRUCTION FUNDS PORTION IS $2,567,000; PSD CONSTRUCTION FUNDS PORTION IS $5,000,000. CURRENT FUNDING REQUEST IS TO SUPPLEMENT PSD'S PORTION OF THE CONSTRUCTION FUNDING COSTS.
DOT FMS
FMS
ITO RESTROOM IMPROVEMENTS
RENOVATE 4 PAIRS OF RESTROOMS LOCATED ON THE GROUND FLOOR
HNL INSTALL TAXIWAY HOLD LIGHTS
PROVIDE RUNWAY GUARD LIGHTS TO RUNWAY 4R‐22L AND ITS INTERSECTING TAXIWAYS AND TO RUNWAY 4L‐22R AND ITS INTERSECTING TAXIWAYS
HNL OVERSEAS TERMINAL ASBESTOS ABATEMENT
AIR CONDITIONING MODIFICATIONS IN THE INTERNATIONAL ARRIVALS BUILDING (IAB) NEEDED FOR THE ABATEMENT OF ASBESTOS IN PHASE 2
HNL REEF RUNWAY, TAXIWAY SIGNAGE IMPROVEMENTS
REPLACE EXISTING SIGN PANELS FOR THE REEF RUNWAY AND ASSOCIATED TAXIWAYS; RELOCATE AND REPLACE TWO WIND CONES ADJACENT TO RWY 8R‐26L OUTSIDE OF THE ROFA, AND INSTALL LED RETROFIT KITS TO AFFECTED SIGNS
HNL RESTROOM IMPROVEMENTS PHASE2
2ND PHASE TO RENOVATE PUBLIC RESTROOMS AT HNL, INCLUDING TERMINAL 1
HNL RUNWAY 8L WIDENING PHASE 2
2ND PHASE TO REHABILITATE THE WESTERN END OF RUNWAY 8L, INCLUDING PAVEMENT MARKINGS, SIGNAGE AND LIGHTING
HNL TICKET LOBBY RENOVATIONS
REPLACE TERMINAL 1 & 2 BAGGAGE HANDLING SYSTEMS; RENOVATE TICKET LOBBY 4, 5 & 6 TO MATCH LOBBIES 7 & 8
KOA AIRFIELD LIGHTING IMPROVEMENTS
REPLACE RUNWAY AND TAXIWAY EDGE LIGHTS FROM EXISTING INCANDESCENT LIGHTS WITH NEW LED LIGHTS
KOA ARFF REGIONAL TRAINING FACILITY
PROVIDE A MULTI‐AGENCY, TRAINING FACILITY FOR ARFF FIRE‐FIGHTING AND EMERGENCY RESPONDERS
KOA FEDERAL INSPECTION SERVICES BUILDING
NEW FEDERAL INSPECTION SERVICES FACILITY TO REPLACE THE TEMPORARY FACILITY, INCLUDING AIRCRAFT PARKING, HOLDROOM, AND GROUND TRANSPORTATION
KOA RESTROOM IMPROVEMENTS
RENOVATION OF THE EXISTING RESTROOMS IN THE NORTH AND SOUTH TERMINALS
KOA USDA INSPECTION BUILDING
CONSTRUCTION OF AN IN‐LINE USDA AGRICULTURAL INSPECTION BUILDING. THE AGRICULTURAL INSPECTION STATION WILL BE MOVED TO THE BACK‐OF‐HOUSE, OUT OF THE VIEW OF THE PUBLIC AND IN‐LINE WITH THE TSA SCREENING
LIH EMERGENCY STAGING & STORAGE FACILITY
PROVIDE A SECURED STORAGE SITE FOR LIHUE AIRPORT, THAT CAN ALSO BE USED TO STAGE EQUIPMENT AND SUPPLIES IN TIMES OF DECLARED EMERGENCY
LIH TICKET LOBBY IMPROVEMENTS
DEMOLISH PLANTER BOXES FRONTING THE TICKET LOBBY
OGG HOLDROOM AND GATE IMPROVEMENTS
ENCLOSE THE EXTERIOR WALKWAY AND CONNECT HOLDROOMS A & B
OGG HOLDROOMS A, B & E RESTROOM IMPROVEMENTS
3RD PHASE IN THE OGG RESTROOM RENOVATION PROJECT, WHICH INCLUDES RESTROOMS IN HOLDROOMS A, B & E
OGG INBOUND BAGGAGE HANDLING SYSTEM IMPROVEMENTS
REPLACE EXISTING INBOUND BAGGAGE HANDLING SYSTEM, INCLUDING INSTALLING AN ADDITIONAL UNIT
PAK SECURITY FENCE IMPROVEMENTS
REPLACE THE PERIMETER SECURITY FENCE
DEMOLISH SHED AT PIERS 31‐34, HONOLULU HARBOR
DEMOLISH ENTIRE SHED AND THREE COMFORT STATIONS ‐ PIERS 31‐33
H.C. 10498 KCT WHARF AND DREDGING AT HONOLULU HARBOR
DREDGING AND CONSTRUCTION OF OVER 3000 FT OF PIER FOR A NEW CONTAINER TERMINAL ‐ KCT
H.C. 50113.1 AND .2 QUONSET HUT DEMOLITION AND PIER 2 DEMOLITION AT HILO HARBOR
DEMOLITION QUONSET HUT STRUCTURE AND DEMOLITION OF PIER 2 SHED
H.C. 50148.1 AND .2 DRAIN INLETS HARDENING AND VARIOUS PAVING AT KAWAIHAE HARBOR
DRAIN HARDENING AT PIER 2 AND PAVING 1.78 ACRES AT LOT NEXT TO HARBOR OFFICE‐ KAWAIHAE
PIERS 24‐28 UTILITIES IMPROVEMENTS, HONOLULU HARBOR
UTILITIES RELOCATION AND IMPROVEMENTS AT PIERS 24‐28
FORT BARRETTE ROAD OPERATIONAL IMPROV, ROOSEVELT AVE TO FARRINGTON HWY
FFY 2020 Q2
KAUAI TRAFFIC SIGNAL COMMAND CENTER
FFY 2020 Q2
EROSION CONTROL AND BEST MANAGEMENT PRACTICES FOR STORM WATER PERMIT COMPLIANCE, VARIOUS LOCATIONS ON OAHU
FFY 2020 Q3
GUARDRAIL AND SHOULDER IMPROVEMENT PROGRAM AT VARIOUS LOCATIONS, MAUI, PART 4 ‐ KULA HWY. (RTE 37), AAPUEO PKWY. TO OMAOPIO RD AND PIILANI HWY (RTE 31), NORTH KIHEI RD (MP 0) TO LIPOA ST (MP 2.81)
FFY 2020 Q3
HANA HIGHWAY ROCKFALL MITIGATION, VICINITY OF MILEPOST 12, PH 3
FFY 2020 Q3
HANA HIGHWAY, HOOKELE STREET TO HALEAKALA HIGHWAY RESURFACING
FFY 2020 Q3
HENRY STREET REHABILITATION, KUAKINI HWY TO QUEEN KAAHUMANU HWY
FFY 2020 Q3
HONOAPIILANI HIGHWAY, KUIHELANI HWY TO N KIHEI ROAD RESURFACING
FFY 2020 Q3
HONOAPIILANI HIGHWAY, N KIHEI ROAD TO MAALAEA PLACE RESURFACING
FFY 2020 Q3
INTERSTATE ROUTE H‐2, CULVERT RESTORATION @ MP 2.10
FFY 2020 Q3
KAHANA NUI BRIDGE REPLACEMENT
FFY 2020 Q3
KALANIANAOLE HIGHWAY (ROUTE 72) RESURFACING, POALIMA STREET TO VICINITY OF MAKAI PIER ‐ PHASE 2, HULI ST. TO VICINITY OF MAKAI PIER
FFY 2020 Q3
KAUAI BASEYARD IMPROVEMENTS
FFY 2020 Q3
KILAUEA AVENUE REHABILITATION, WAILOA BRIDGE TO PUAINAKO STREET
FFY 2020 Q3
LYDGATE‐KAPAA BIKE PED PATH, PH C
FFY 2020 Q3
TRAFFIC SIGNAL MODERNIZATION AT VARIOUS LOCATIONS, OAHU, PH 1
FFY 2020 Q3
WAHIAWA PEDESTRAIN BRIDGE
FFY 2020 Q3
FARRINGTON HIGHWAY (ROUTE 93), BRIDGE REPLACEMENT, MAKAHA BRIDGES #3 & #3A
FFY 2020 Q4
GUARDRAIL AND SHOULDER IMPROV, VARIOUS LOCATIONS, PH 1‐ HALIIMAILE RD, HALEAKALA HWY TO BALDWIN AVE
FFY 2020 Q4
KAMEHAMEHA HIGHWAY (ROUTE 83), BRIDGE REPLACEMENT, KAIPAPAU STREAM BRIDGE
FFY 2020 Q4
KAUMUALII HIGHWAY INTERSECTION IMPROVEMENTS AT WAIMEA CANYON DRIVE AND MENEHUNE ROAD/HALEPULE ROAD
FFY 2020 Q4
KUHIO HIGHWAY, REPAIRS TO WAILUA RIVER BRIDGE
FFY 2020 Q4
OLD HALEAKALA HIGHWAY TRAFFIC SIGNAL UPGRADE AT PUKALANI STREET
FFY 2020 Q4
FARRINGTON HIGHWAY DRAINAGE IMPROVEMENTS, VICINITY OF LEEWARD COMMUNITY COLLEGE
FFY 2021 Q1
INTERSTATE ROUTE H‐2 AND MOANALUA FWY, GUARDRAIL AND SHOULDER IMPROV, PH 2
FFY 2021 Q1
KAHULUI BEACH ROAD INTERSECTION IMPROVEMENTS AT KANALOA AVE
FFY 2021 Q1
KUHIO HIGHWAY TRAFFIC SIGNAL IMPROVEMENTS, VICINITY OF HANALEI BRIDGE
FFY 2021 Q1
PALI HIGHWAY (ROUTE 61) RESURFACING & LIGHTING IMPROVEMENTS, VINEYARD BLVD (ROUTE 98) TO KAMEHAMEHA HIGHWAY (ROUTE 83), PH 2 ‐ RESURFACING, VINEYARD BLVD TO WAOKANAKA ST
FFY 2020 Q3
KAUMUALII HIGHWAY, ELEELE PED OVERPASS DECK REPAIR
FFY 2020 Q2
INTERSTATE ROUTE H‐201 OUTBOUND AUXILIARY LANE, H‐3 UNDERPASS TO FORT SHAFTER OFF RAMP
FFY 2020 Q3
IOLANI STREET AND LIHOLANI STREET REHAB, AND MOKU PLACE FROM HALEAKALA HWY TO OLD HALEAKALA HWY
FFY 2020 Q3
KAUMUALII HIGHWAY MP 0 TO 2.1 AND MP 12.3 TO 16, PAVEMENT MARKINGS
FFY 2020 Q3
KAWAIHAU ROAD, HAUAALA ROAD AND MAILIHUNA ROAD COMPLETE STREET & SAFETY IMPROVEMENTS
FFY 2020 Q3
KUHIO HIGHWAY (56) WAILAPA ROAD TO KAHILIHOLO ROAD MP 21.72 TO 24.25 (SEP‐14 PAVEMENT MARKING)
FFY 2020 Q3
KUHIO HIGHWAY, KAPUNA TO WAILAPA RD PAVEMENT MARKINGS
FFY 2020 Q3
KUHIO HIGHWAY, KUPUNA TO WAILAPA RD, RESURFACING
FFY 2020 Q3
KUHIO HIGHWAY, WAILAPA TO KAHILIHOLO RD, RESURFACING
FFY 2020 Q3
MILL STREET PAVEMENT RECON, N MARKET ST TO E MAIN STREET
FFY 2020 Q3
OLOHENA ROAD, KUKUI STREET AND ULU STREET IMPROV, PH 1
FFY 2020 Q3
SAFE ROUTES TO SCHOOL PROGRAM, KING KAUMUALII SCHOOL, PH 1
FFY 2020 Q3
SAFE ROUTES TO SCHOOL PROGRAM, KOLOA SAFE ROUTES, PH 2
FFY 2020 Q3
HALEAKALA HIGHWAY, N FIREBREAK RD TO KULA HWY, RESURFACING
FFY 2020 Q4
HONOAPIILANI HIGHWAY, PUAMANA AREA TO SOUTHERN CONNECTOR ‐ PAVING
FFY 2020 Q4
HONOAPIILANI HIGHWAY, PUAMANA AREA TO SOUTHERN CONNECTOR ‐ STRIPING
FFY 2020 Q4
HONOAPIILANI HIGHWAY, SOUTHERN TERMINUS TO MP 15.0 ‐ PAVING
FFY 2020 Q4
HONOAPIILANI HIGHWAY, SOUTHERN TERMINUS TO MP 15.0 ‐ STRIPING
FFY 2020 Q4
INTERSTATE ROUTE H‐1 RESURFACING, MILLER PEDESTRIAN OVERPASS TO KAPIOLANI INTERCHANGE
FFY 2020 Q4
KAHEKILI HIGHWAY RESURFACING, WAIEHU BEACH ROAD TO CAMP MALUHIA
FFY 2020 Q4
KAMEHAMEHA HWY REHAB, KAPUHI ST TO DAIRY ROAD
FFY 2020 Q4
KAMEHAMEHA HWY, KAMANANUI RD, WILIKINA DR REHABILITATION, VICINITY OF WEED CIRCLE TO H‐2
FFY 2020 Q4
KUHIO HIGHWAY PAVEMENT MARKING KEALIA TO ANAHOLA, MP 10‐14
FFY 2020 Q4
KUHIO HIGHWAY RESURFACING KEALIA TO ANAHOLA, MP 10‐14
FFY 2020 Q4
MAMALAHOA HWY SAFETY IMRPROV, MP 3.90 ‐ MP 6.90
FFY 2020 Q4
MOANALUA FWY, HIGHWAY LIGHTING IMPROV, HALAWA HTS OFFRAMP TO MIDDLE ST OP, PH 2
FFY 2020 Q4
MOANALUA FWY, HIGHWAY LIGHTING IMPROV, HALAWA TO H‐3 OP (MP 0‐MP 0.73)
FFY 2020 Q4
NIMITZ HIGHWAY ‐ SAND ISLAND TO ATKINSONS RESURFACING
FFY 2020 Q4
ROUTE 11 ENHANCED PAVEMENT MARKINGS AND RUMBLE STRIPS MP 16.5 TO 21.3
FFY 2020 Q4
ROUTE 11 PAVEMENT STRATEGIES AND SURFACE TREATMENTS ‐ MP 16.5 TO 21.3
FFY 2020 Q4
ROUTE 130 ENHANCE PAVEMENT MARKINGS AND RUMBLE STRIPS ‐ MP 10.8 TO 14.0
FFY 2020 Q4
ROUTE 130 PAVEMENT STRATEGIES AND SURFACE TREATMENTS ‐ MP 10.8 TO 14.0
FFY 2020 Q4
ROUTE 19 ENHANCED PAVEMENT MARKINGS AND RUMBLE STRIPS ‐ MP 90 TO 93
FFY 2020 Q4
ROUTE 19 PAVEMENT STRATEGIES AND SURFACE TREATMENTS ‐ MP 90 TO 93
FFY 2020 Q4
ROUTE 190 ENHANCED PAVEMENT MARKINGS AND RUMBLE STRIPS ‐ MP 1 TO 39
FFY 2020 Q4
ROUTE 250 ENHANCED PAVEMENT MARKINGS AND RUMBLE STRIPS ‐ MP 2.5 TO 21.9
FFY 2020 Q4
ROUTE 270 ENHANCE PAVEMENT MARKINGS AND RUMBLE STRIPS ‐ MP 2 TO 29
FFY 2020 Q4
FARRINGTON HIGHWAY WIDENING, KAPOLEI GOLF COURSE TO FORT WEAVER ROAD
FFY 2021 Q1
H‐1 EB WIDENING, VICINITY OF WAIKELE TO VICINITY OF HALAWA INTERCHANGE
FFY 2021 Q1
KAPOLEI IC PHASE 3
FFY 2021 Q1
KEAAU‐PAHOA ROAD IMPROVEMENTS, ROUNDABOUTS AT MAKUU AND ORCHIDLAND, PH 1
FFY 2021 Q1
TRAFFIC SIGNAL CONTROLLER UPGRADE ‐ STATEWIDE
FFY 2021 Q1
HALE ALAHONUA AC IMPROVEMENTS
CONSTRUCTION PROJECT
VARIOUS BUILDING ENVELOPE IMPROVEMENTS AND RENOVATIONS
CONSTRUCTION PROJECT
VARIOUS INTERIOR IMPROVEMENTS AND RENOVATIONS
CONSTRUCTION PROJECT
ARC FLASH STUDY, UHM MANOA CAMPUS - PHASE 2
DESIGN PROJECT
ELEVATOR MODERNIZATION PHASE V
DESIGN PROJECT
LEE CC, 7875 LEARNING COMMONS - SPALL REPAIR
CONSTRUCTION PROJECT
KRAUSS REPLACE/UPGRADE CENTRAL PLANT AND HVAC SYSTEMS
DESIGN PROJECT
MARINE SCIENCES BLDG REPLACE/UPGRADE COOLING TOWER AND MISC. MECHANICAL COMPONENTS
DESIGN PROJECT
VARIOUS SITES, CONTINGENCY
CONSTRUCTION PROJECT
DEMOLITION OF PORTABLES
CONSTRUCTION PROJECT
IFA, KENNEDY THEATER AND PHYSICAL SCIENCE BUILDING, REPLACE ELECTRICAL EQUIPMENT
CONSTRUCTION PROJECT
HAWAII HALL REROOF AND VARIOUS IMPROVEMENTS AND RENOVATIONS
CONSTRUCTION PROJECT
UPGRADE EXTERIOR LIGHTING VARIOUS SITES
CONSTRUCTION PROJECT
VARIOUS BUILDINGS REPLACE/UPGRADE FIRE ALARM SYSTEMS
DESIGN PROJECT
RETRO-COMMISSIONING OF VARIOUS SYSTEM OPERATIONS AND CONTROLS
DESIGN PROJECT
GENERAL MECHANICAL SYSTEM REPAIRS
CONSTRUCTION PROJECT
VARIOUS BUILDINGS, REPAIR/UPGRADE HVAC CONTROL SYSTEMS
DESIGN PROJECT
VARIOUS LOCATIONS (OFF-SITE FACILITIES)
CONSTRUCTION PROJECT
BIOMEDICAL SCIENCES BUILDING COURT B AND IBR REPLACE/UPGRADE HVACVAV AND CONTROL SYSTEMS
DESIGN PROJECT
WEBSTER REPLACE/UPGRADE HVAC AND CONTROL SYSTEMS
DESIGN PROJECT
STAN SHERIFF CENTER REPLACE GREASE INTERCEPTORS
DESIGN PROJECT
VARIOUS BUILDINGS WATER CONSERVATION UPGRADES REPLACE PLUMBING FIXTURES, PHASE III
DESIGN PROJECT
BIOMED ROOF IMPROVEMENT, PHASE 2
CONSTRUCTION PROJECT
SHIDLER ROOF IMPROVEMENT, PHASE 2
CONSTRUCTION PROJECT
CAMPUS, ACCESSIBILITY
CONSTRUCTION PROJECT
6-YEAR CIP PROGRAMMING AND SPACE UTILIZATION PLANNING
DESIGN PROJECT
ARCHITECTURE BUILDING EXTERIOR IMPROVEMENTS AND RENOVATIONS
CONSTRUCTION PROJECT
BUSINESS NURSING (KAU)
CONSTRUCTION PROJECT
VARIOUS IRRIGATION SYSTEM UPGRADES
DESIGN PROJECT
UPGRADE/REPLACE MECHANICAL FIRE PROTECTION SYSTEMS
DESIGN PROJECT
DEMOLITION OF PORTABLES
DESIGN PROJECT
HAMILTON LIBRARY LED RETROFIT
CONSTRUCTION PROJECT
SOLAR PV (100 KW/ROOF, $500 K/100KW PV)
CONSTRUCTION PROJECT
BILGER ANNEX EXTERIOR IMPROVEMENTS AND RENOVATIONS
CONSTRUCTION PROJECT
UH HILO REPAVE TENNIS COURTS
CONSTRUCTION PROJECT
LANDSCAPE BUILDING IMPROVEMENTS AND RENOVATIONS
CONSTRUCTION PROJECT
LEE, 7875 LEARNING COMMONS - REROOF PHASE IIC
CONSTRUCTION PROJECT
GENERAL CLASSROOMS AND TEACHING LABS INTERIOR IMPROVEMENTS AND RENOVATIONS
CONSTRUCTION PROJECT
LAW SCHOOL AND LAW LIBRARY EXTERIOR IMPROVEMENTS AND RENOVATIONS
CONSTRUCTION PROJECT
(UHM 14-541-700) ELEVATOR MODERNIZATION, PHASE IV
CONSTRUCTION PROJECT
BUILDING EXTERIOR WALL RESEAL (UHWO)
CONSTRUCTION PROJECT
GENERAL CLASSROOMS AND TEACHING LABS INTERIOR IMPROVEMENTS AND RENOVATIONS
CONSTRUCTION PROJECT
HILO, AERONAUTICAL SCIENCE
PENDING ADDITIONAL INFORMATION
HILO, PHARMACY LABORATORY IMPROVEMENTS, HAWAII
PENDING ADDITIONAL INFORMATION
MĀNOA, COLLEGE OF TROPICAL AGRICULTURE AND HUMAN RESOURCES, KULA AGRICULTURE
PENDING ADDITIONAL INFORMATION
SYSTEMWIDE, UNIVERSITY OF HAWAII CANCER CENTER
PENDING ADDITIONAL INFORMATION
BACHMAN HALL RENOVATION
CONSTRUCTION PROJECT
BIOMEDICAL SCIENCES BLDG REPAIR/REPLACE/UPGRADE CENTRAL PLANT/COOLING TOWER/HVAC SYSTEMS
DESIGN PROJECT
CAMPUS SERVICES ROOF IMPROVEMENTS
DESIGN PROJECT
CAMPUS, ACCESSSIBILITY
DESIGN PROJECT
DKAC ROOF IMPROVEMENTS
CONSTRUCTION PROJECT
GENERAL CLASSROOMS AND TEACHING LABS INTERIOR REPAIRS - (PAINTING, CABINETS, FLOORING, ETC.)
CONSTRUCTION PROJECT
HALE KEHAU DINING - REPLACE KITCHEN CEILING
CONSTRUCTION PROJECT
HAWAII HALL, CRAWFORD HALL AND GEORGE HALL REPLACE AIR- HANDLERS AND CONTROLS
DESIGN PROJECT
HOLMES HALL LOOP A UPGRADE CENTRAL CHILLER PLANT/COOLING TOWER, HVAC EQUIPMENT AND CONTROLS
DESIGN PROJECT
HOLMES HALL RESTROOM REPAIRS
CONSTRUCTION PROJECT
KAUA'I CC - 4454 BUSINESS/HEALTH SCIENCES MODERNIZATION
CONSTRUCTION PROJECT
KUYKENDALL SPALL AND LOUVER REPAIRS
CONSTRUCTION PROJECT
LAW SCHOOL COMPLEX REPLACE AIR HANDLERS AND UPGRADE CONTROLS
DESIGN PROJECT
LONG RANGE PLANNING
DESIGN PROJECT
MĀNOA, MINI MASTER PLAN PHASE 2, O'AHU
CONSTRUCTION PROJECT
MAUI CC - 2252 KA'AIKE AND 2253 PAINA HVAC CONTROLS AND DISTRIBUTION REPLACEMENT
CONSTRUCTION PROJECT
MINOR/URGENT REPAIRS (UNDER $250,000)
CONSTRUCTION PROJECT
RETRO-COMMISSIONING OF VARIOUS SYSTEM OPERATIONS AND CONTROLS
CONSTRUCTION PROJECT
SAUNDERS RESTROOMS
CONSTRUCTION PROJECT
SINCLAIR LIBRARY ROOF IMPROVEMENTS
DESIGN PROJECT
SNYDER DEMOLITION
CONSTRUCTION PROJECT
SOLAR PV
CONSTRUCTION PROJECT
ST. JOHN PLANT SCIENCE LABORATORY 2 AND VAULT ROOF IMPROVEMENTS
DESIGN PROJECT
UPGRADE/REPLACE BUILDING ACCESS/KEYING SYSTEM
CONSTRUCTION PROJECT
VARIOUS BUILDINGS REPLACE/SERVICE EQUIPMENT
DESIGN PROJECT
VARIOUS BUILDINGS, REPAIR/UPGRADE HVAC CONTROL SYSTEMS
DESIGN PROJECT
VARIOUS LIGHTING UPGRADES
CONSTRUCTION PROJECT
VARIOUS RELOCATION PROJECTS
CONSTRUCTION PROJECT
VARIOUS ROOF REPAIRS
CONSTRUCTION PROJECT
VARIOUS SITES, CONTINGENCY
CONSTRUCTION PROJECT
ANIMAL QUARANTINE STATION
Description
SEWAGE PRE‐TREATMENT FACILITY IMPROVEMENTS
Amount
550,000
Dept.
AGR
Island
OAHU
FUNDED/UNFUNDED
FUNDED