Method 1
Energy from HVO
Litres of HVO consumed: litres per year kWh per litre HVO consumed: kWh per litre Total Site Energy Consumption Per Year: kWh per year Cost of the HVO per litre: £ Cost of HVO fuel per kWh: £per kWh Cost of HVO Solution (all costs combined) per kWh: £ Energy from Solar
Each Solar Panel is a set of four, estimated to be rated at Watt Total Generation Capacity: kW Yearly Generation Capacity per kW based on irradiation data for Colchester: kWh / kW installed / year Colchester is on A12 route. Irradiation data source: Total Yearly Generation Capacity for this system: kWh Missing Energy Delivered by Hydrogen
Missing Energy after solar system generation is taken off site consumption: kWh NB: This is only theoretically the case if all solar can be consumed when it is being generated, or if the inverter includes a battery to store excess solar energy.
Cost of hydrogen
Stated annual hydrogen fuel cost: Calculated Hydrogen cost per kWh: Calculated Hydrogen total cost per kWh (including generator): Calculated Hydrogen fuel cost per kg: Calculated kg Hydrogen required per year: kg Cost of solar
Total cost of solar system (distribution board, solar panels, inverter): Total cost per kWh for solar generated: per kWh Costs of different setups
Stated Costs of Solar & Hydrogen
Total Cost of Solar & Hydrogen: Method 2
Amount of hydrogen consumed
The usable hydrogen in 1 MCP from BOC is around kg. Total hydrogen per year is kg hydrogen. Energy from hydrogen
One Kg of hydrogen through averagely running generator is kWh. With site energy usage at around kWh. Cost of hydrogen
Rental of two MCP packs per month for the year is £ (there are only ever two packs on site) Hydrogen fuel would cost £ for the year.