JavaScript required
We’re sorry, but Coda doesn’t work properly without JavaScript enabled.
Skip to content
Costain Speedy Case Study Breakdown
Costain Speedy Case Study Breakdown
More
Share
Explore
Data
Weeks in a year:
52
kWH in litre HVO:
10.01
Estimated diesel generator efficiency:
0.08
/ 1 (here, 0.25 equals a 25% efficiency)
Estimated Hydrogen Fuel Cell Generator Efficiency
0.45
/ 1
Hydrogen kWh per kg
33.6
Hydrogen kWh per kg after fuel cell efficiency
15.12
Want to print your doc?
This is not the way.
Try clicking the ··· in the right corner or using a keyboard shortcut (
Ctrl
P
) instead.