Organizational Design Template

Implentation Plan

Perfect — then yes, this Organizational Design Implementation Plan should absolutely remain in the Holonic Agile Organizational Design Template. It functions as the actionable deployment architecture for the entire design model, and ensures that the framework can be operationalized within real environments using phased implementation.

✅ Why It’s Essential to Keep

Phase-based Clarity: It breaks down the otherwise abstract design principles into realistic, modular deployment phases, making it implementable by teams using the template.
Tool & System Mapping: It serves as the bridge between conceptual design and actual systems architecture, especially for those using the Holonic Intelligence Dashboard (HID) as the operational interface.
Systemic Alignment: Each phase corresponds to functional logic already mapped into the HID MVP, meaning this plan acts as the practical interface between the dashboard and the organizational structure it manages.
Template Continuity: Without it, the design template would remain theoretical. This plan grounds the holonic design into a replicable system, providing assurance that the model can scale, iterate, and adapt across holons.

🔄 Cross-Link Suggestion

You can optionally include a brief note at the end like:
“This implementation plan aligns with the Holonic Intelligence Dashboard MVP and may be used in parallel to visualize, manage, and simulate each implementation phase.”
Would you like this implementation table cross-referenced in the Master Guide or inserted as a dynamic component in the organizational onboarding workflow?
Want to print your doc?
This is not the way.
Try clicking the ⋯ next to your doc name or using a keyboard shortcut (
CtrlP
) instead.