Retrofit plans

Improvement option evaluation including payback and carbon cost effectiveness assessment


This section looks at the measures in your proposed improvement plan and calculates the carbon cost effectiveness and the payback in years of each option, basically how much it costs to save a tonne of carbon. I have taken the figures from the previous page and added in the possible lifetime of the product based on guarantees offered. This lifetime figure is multiplied by the yearly CO2 saving to give a lifetime CO2 saving. The lifetime CO2 saving is then divided by the cost of the measure to give the cost per tonne of carbon saved. In addition the cost of the measure has been divided by the annual fuel bill saving
Costs of installation are estimated, they are included to help you understand relative costs of different measures. These costs based on industry rates for similar work, these can become out of date quite quickly particularly with the challenging market conditions of the last few years. These are not competitive quotations actual costs may be higher or lower, they do not include any grants or incentives that you may be eligible for.
The figures can be updated with further details as the project gets further down the line and you get actual quotes for the work. The lifetime figure is an estimate based on the guarantees offered by installers, insulation may last a lot longer in reality. Ventilation is excluded from the calculation unless you opt for an MVHR system.
The measures listed here were selected using the Parity Projects Crohm system which provides a dynamic database of the measures. The measures have been selected based on the intended options, carbon cost effectiveness, simple payback and funding available to reach this combination of measures and phasing. Further details on how this works and the choices made are available on request.
Phase 1 funded measures
0
Search
Phase 1 Measures
Estimated Costs
Energy Rating
Fuel Bill
tCO2
Annual fuel saving
Carbon Saving
Lifetime
Lifetime CO2 savings
Carbon cost effectiveness
Simple payback in years
1
Where you are now
Per Measure
58 D
£1,070.00
5.37
2
Internal insulation to pre 1900 solid walls
£13,820.00
63 D
£940.00
4.59
£130.00
0.78
25
19.50
£709
106.31
3
Internal insulation to 1950-1966 solid walls
£11,000.00
67 D
£840.00
3.97
£100.00
0.62
25
15.50
£710
110.00
4
Humidity controlled kitchen extractor
£500.00
67 D
£840.00
3.97
5
Humidity controlled extractors per wetroom
£500.00
67 D
£840.00
3.97
6
Humidity controlled passive ventilation to non-wet rooms
£420.00
67 D
£840.00
3.97
7
After Phase 1 Measures
67 D
£840.00
3.97
8
Package Cost & % Improvements
£26,240.00
21%
26%
1.4
25
35.00
£750
9
There are no rows in this table
Phase 2 measures
0
Search
Phase 1 Measures
Estimated Costs
Energy Rating
Fuel Bill
tCO2
Annual fuel saving
Carbon Saving
Lifetime
Lifetime CO2 savings
Carbon cost effectiveness
Simple payback in years
1
After Phase 1
Per Measure
67 D
£840.00
3.97
2
300mm loft insulation from unknown insulation - no access to loft
£850.00
71 C
£720.00
3.28
£120.00
0.69
25
17.25
£49
7.08
3
Roof insulation (up to 150mm) from partially insulated sloping ceiling
£1,000.00
75 C
£640.00
2.78
£80.00
0.5
25
12.50
£80
12.50
4
A++ triple glazed casement windows from double glazing of unknown age
£24,070.00
78 C
£570.00
2.35
£70.00
0.43
25
10.75
£2,239
343.86
5
Part L insulated doors
£3,000.00
78 C
£560.00
2.30
£10.00
0.05
25
1.25
£2,400
300.00
6
Insulated floors (50mm) from 1950 - 1966 solid floor
£1,420.00
79 C
£540.00
2.19
£20.00
0.11
25
2.75
£516
71.00
7
Insulated floors (50mm) from pre-1900 solid floor
£1,960.00
80 C
£520.00
2.05
£20.00
0.14
25
3.50
£560
98.00
8
After Phase 2 Measures
80 C
£520.00
2.05
9
Package Cost & % Improvements
£32,300.00
38%
48%
£320.00
1.92
25
48.00
£673
100.94
10
Cumulative Cost & % Improvements
£58,540.00
51%
62%
£550.00
3.32
25
83.00
£705
106.44
11
There are no rows in this table
Phase 3 measures
0
Search
Phase 3 Measures
Estimated Costs
Energy Rating
Fuel Bill
tCO2
Annual fuel saving
Carbon Saving
Lifetime
Lifetime CO2 savings
Carbon cost effectiveness
Simple payback in years
1
After Phase 2
Per Measure
80 C
£520.00
2.05
2
Install PV system where potential has been identified in a conservation area
£6,560.00
96 A
£40.00
1.21
£480.00
0.84
25
21.00
£312
13.67
3
GSHP (35 degree emitters) with new underfloor central heating and hot water, from A rated gas boiler
£24,250.00
94 A
£80.00
0.13
-£40.00
1.08
14
15.12
£1,604
-606.25
4
After Phase 3 Measures
94 A
£80.00
0.13
5
Package Cost & % Improvements
£30,810.00
85%
94%
£440.00
1.92
19.5
37.44
£823
70.02
6
Cumulative Cost & % Improvements
£89,340.00
93%
98%
£990.00
5.25
24
126.00
£709
90.24