1
Backlog 📥
0
128
0%
11
0
0
2
Blocked
0
128
0
0
0
3
Sprint 1
12/08/2024
8/16/2024
0.05
128
100%
7
7
0
5
Diskusi dan Meeting Perjanjian Detail Proyek
Diskusi dan Meeting Perjanjian Detail Proyek
4
Sprint 2
19/08/2024
8/23/2024
0.02
128
100%
3
3
0
5
Diskusi dan Meeting Perjanjian Detail Proyek
Implementasi dokumen MOM & BRS
5
Sprint 3
26/08/2024
8/30/2024
0.04
128
100%
5
5
0
5
Implementasi Aplikasi ERMS PT Permodalan Nasional Madani
Pengembangan Design Master Data Aplikasi ERMS
6
Sprint 4
02/09/2024
9/6/2024
0.14
128
100%
18
18
0
5
Implementasi Aplikasi ERMS PT Permodalan Nasional Madani
Pengembangan Design Master Data Aplikasi ERMS
7
Sprint 5
16/09/2024
9/20/2024
0.09
128
100%
11
11
0
5
Implementasi Aplikasi ERMS PT Permodalan Nasional Madani
Pengembangan RCM & RCSA Step 1
8
Sprint 6
23/09/2024
9/27/2024
0.2
128
100%
25
25
0
5
Implementasi Aplikasi ERMS PT Permodalan Nasional Madani
Pengembangan RCM & RCSA Step 2
9
Sprint 7
30/09/2024
10/4/2024
0.05
128
100%
7
7
0
5
Implementasi Aplikasi ERMS PT Permodalan Nasional Madani
Pengembangan RCM & RCSA Step 2
10
Sprint 8
14/10/2024
10/18/2024
0
128
0
0
0
5
Implementasi Aplikasi ERMS PT Permodalan Nasional Madani
Pengembangan RCM & RCSA Step 2
11
Sprint 9
21/10/2024
10/25/2024
0.01
128
100%
1
1
0
5
Implementasi Aplikasi ERMS PT Permodalan Nasional Madani
Pengembangan RCM & RCSA Step 2
12
Sprint 10
28/10/2024
11/1/2024
0
128
0
0
0
5
Implementasi Aplikasi ERMS PT Permodalan Nasional Madani
Pengembangan RCM & RCSA Step 2
13
Sprint 11
04/11/2024
11/8/2024
0
128
0
0
0
5
Implementasi Aplikasi ERMS PT Permodalan Nasional Madani
Pengembangan RCM & RCSA Step 2
14
Sprint 12
11/11/2024
11/15/2024
0
128
0
0
0
5
Implementasi Aplikasi ERMS PT Permodalan Nasional Madani
Pengembangan RCM & RCSA Step 2
15
Sprint 13
18/11/2024
11/22/2024
0.06
128
100%
8
8
0
5
Implementasi Aplikasi ERMS PT Permodalan Nasional Madani
Pengembangan Kertas Kerja LED & EWS
16
Sprint 14
25/11/2024
11/29/2024
0.07
128
100%
9
9
0
5
Implementasi Aplikasi ERMS PT Permodalan Nasional Madani
Pengembangan Kertas Kerja LED & EWS
17
Sprint 15
02/12/2024
12/6/2024
0.01
128
100%
1
1
0
5
Implementasi Aplikasi ERMS PT Permodalan Nasional Madani
Pengembangan Kertas Kerja LED & EWS
18
Sprint 16
09/12/2024
12/13/2024
0.01
128
100%
1
1
0
5
Implementasi Aplikasi ERMS PT Permodalan Nasional Madani
Pengembangan Kertas Kerja LED & EWS
19
Sprint 17
16/12/2024
12/20/2024
0
128
0%
21
0
0
5
Implementasi Aplikasi ERMS PT Permodalan Nasional Madani
Pengembangan Kertas Kerja LED & EWS
There are no rows in this table
Note: The Current Sprint column automatically gets checked depending on the Sprint Start and Sprint End dates
Definition of Done
DoD List
Definition
1
Requirement Ghatering
The process of gathering technical requirements for the design of an application feature
2
UI Design & Prototype
The process of designing the appearance and prototype of the application based on business objectives and user needs
3
Frontend Visual (Desktop View) / Mobile View
The process of implementing the results of the application interface design
4
Backend Logic
Logic implementation process based on application feature business process
5
Merge Request to Dev Env
The process of merging new code in the application dev environment repository
6
Testing Application with Zero Bug & Defect
Application test process based on Acceptance Criteria and Application business process
7
Merge Request to Prod Env
The process of merging new code in the application dev environment repository
There are no rows in this table
Sprint Assignment
Search
Backlog 📥
11
Blocked
0
Sprint 1
7
Sprint 2
3
Sprint 3
5
Sprint 4
18
Sprint 5
11
Sprint 6
25
Sprint 7
7
Sprint 8
0
Sprint 9
1
Sprint 10
0
Sprint 11
0
Sprint 12
0
Sprint 13
8
Sprint 14
9
Sprint 15
1
Sprint 16
1
Sprint 17
21
Master Data Departemen Cabang
Risk Register
Ghiffasya Aufadhia Agistiyas
Faksi Naufal
Sulaiman Saleh
FE
Priority
Konfigurasi Kategori Resiko & Tipe Resiko
Carl Soesanto
Not Started
Kalibrasi Risk Resgister
Carl Soesanto
Not Started
System Integration Testing
IR
Iqbal Abdul Rauf
Not Started
User Acceptance Criteria
Carl Soesanto
IR
Iqbal Abdul Rauf
rizqa puspita
Not Started
Pelatihan Pengguna
Carl Soesanto
Not Started
Laporan Bulanan & Garansi
Carl Soesanto
Kelvyn Lukito
Not Started
Document Test Case Application ERMS
Project Management Documentation
IR
Iqbal Abdul Rauf
rizqa puspita
Not Started
Automation Script Testing Application ERMS
Project Management Documentation
IR
Iqbal Abdul Rauf
Not Started
Peformance Testing Report
Project Management Documentation
IR
Iqbal Abdul Rauf
Not Started
Load Testing Report
Project Management Documentation
IR
Iqbal Abdul Rauf
Not Started
Document Weekly Report Progress #1
Project Management Documentation
Kelvyn Lukito
Complete
1.0.0
8/16/2024
8/12/2024
[Implementation] Project Kickoff Meeting
Project Kickoff
Kelvyn Lukito
Complete
8/16/2024
8/12/2024
[Implementation] Join Planning Session (JPS)
Project Kickoff
Kelvyn Lukito
Complete
8/16/2024
8/12/2024
Minutes of Meeting Document (MOM) - 13 Agustus 224
Project Management Documentation
Alfina Damayanti
Complete
8/16/2024
8/12/2024
Minutes of Meeting Document (MOM) - 14 Agustus 224
Project Management Documentation
Alfina Damayanti
Complete
8/16/2024
8/12/2024
Minutes of Meeting Document (MOM) - 15 Agustus 224
Project Management Documentation
Alfina Damayanti
Complete
8/16/2024
8/12/2024
Minutes of Meeting Document (MOM) - 16 Agustus 224
Project Management Documentation
Alfina Damayanti
Complete
8/16/2024
8/12/2024
Document Weekly Report Progress #2
Project Management Documentation
Kelvyn Lukito
Complete
1.0.0
8/23/2024
8/19/2024
[Implementation] Requirement Ghatering - Business Requirement Document
Project Management Documentation
Carl Soesanto
Complete
Priority
8/23/2024
8/19/2024
[Implementation] Requirement Ghatering - Meeting & MoM
Project Management Documentation
Kelvyn Lukito
Carl Soesanto
Complete
Priority
8/23/2024
8/19/2024
Document Weekly Report Progress #3
Project Management Documentation
Kelvyn Lukito
Complete
1.0.0
8/30/2024
8/26/2024
Pembuatan Master Data Kontrol
Risk Register
Carl Soesanto
Faksi Naufal
Ghiffasya Aufadhia Agistiyas
Sulaiman Saleh
Complete
Priority
1.0.0
8/30/2024
8/26/2024
Skema relasi master data control
Risk Register
Carl Soesanto
Complete
Priority
1.0.0
8/30/2024
8/26/2024
Skema relasi master data Proses Bisnis
Risk Register
Carl Soesanto
Complete
Priority
1.0.0
8/30/2024
8/26/2024
Skema relasi master data Risk Control Matrix
Risk Register
Carl Soesanto
Complete
Priority
1.0.0
8/30/2024
8/26/2024
Master Data Kemungkinan (Likelihood)
Risk Register
Faksi Naufal
Ghiffasya Aufadhia Agistiyas
Sulaiman Saleh
Complete
Priority
9/6/2024
9/2/2024
Master Risk Matrix
Risk Register
Ghiffasya Aufadhia Agistiyas
Faksi Naufal
Sulaiman Saleh
Complete
Priority
9/6/2024
9/2/2024
Input Sample Data Kemungkinan (Likelihood)
Risk Register
Alfina Damayanti
Carl Soesanto
Complete
1.0.0
9/6/2024
9/2/2024
Input Sample Data Dampak Risiko
Risk Register
Alfina Damayanti
Carl Soesanto
Complete
1.0.0
9/6/2024
9/2/2024
Master Dampak (Consequences)
Risk Register
Faksi Naufal
Ghiffasya Aufadhia Agistiyas
Sulaiman Saleh
Complete
Priority
9/6/2024
9/2/2024
Input data sample departemen
Risk Register
Carl Soesanto
Complete
Priority
1.0.0
9/6/2024
9/2/2024
Master Data Keuangan dan Non Keuangan
Risk Register
Faksi Naufal
Ghiffasya Aufadhia Agistiyas
Sulaiman Saleh
Complete
Priority
9/6/2024
9/2/2024
Master Proses Bisnis
Risk Register
Faksi Naufal
Ghiffasya Aufadhia Agistiyas
Sulaiman Saleh
Complete
Priority
9/6/2024
9/2/2024
Perubahan tampilan pada departemen
Risk Register
Carl Soesanto
Faksi Naufal
Ghiffasya Aufadhia Agistiyas
Sulaiman Saleh
Complete
1.0.0
9/6/2024
9/2/2024
Master Data Control
Risk Register
Faksi Naufal
Ghiffasya Aufadhia Agistiyas
Sulaiman Saleh
Complete
Priority
9/6/2024
9/2/2024
Master Peristiwa Risiko
Risk Register
Faksi Naufal
Ghiffasya Aufadhia Agistiyas
Sulaiman Saleh
Complete
Priority
9/6/2024
9/2/2024
Master Data Departement Pusat
Risk Register
Ghiffasya Aufadhia Agistiyas
Faksi Naufal
Sulaiman Saleh
Complete
Priority
9/6/2024
9/2/2024
Input data dampak keuangan dan non keuangan
Risk Register
Carl Soesanto
Complete
Priority
1.0.0
9/6/2024
9/2/2024
Buat master dampak keuangan dan non keuangan
Risk Register
Carl Soesanto
Complete
Priority
1.0.0
9/6/2024
9/2/2024
Finalisasi Dokumen BRS Bab 1
Project Management Documentation
Carl Soesanto
Permata Nurkhalida Hydra
AI
Adisti Intan
Complete
1.0.0
9/6/2024
9/2/2024
Entri Master Data Kontrol
Risk Register
AI
Adisti Intan
Complete
1.0.0
9/6/2024
9/2/2024
Entry Master Data Kontrol Divisi
Risk Register
AI
Adisti Intan
Complete
1.0.0
9/6/2024
9/2/2024
Weekly Report #4
Project Management Documentation
Kelvyn Lukito
Complete
1.0.0
9/6/2024
9/2/2024
Pembuatan Master Data (worksheet) RCM
Risk Register
Carl Soesanto
Ghiffasya Aufadhia Agistiyas
Faksi Naufal
Sulaiman Saleh
Complete
Priority
1.0.0
9/20/2024
9/16/2024
Master Risk Type
Risk Register
Faksi Naufal
Ghiffasya Aufadhia Agistiyas
Sulaiman Saleh
Complete
Priority
9/20/2024
9/16/2024
Risk Register Step 1 Penamaan 3 level untuk pusat.
Risk Register
Carl Soesanto
Sulaiman Saleh
Complete
9/20/2024
9/16/2024
Risk Register Step 1 Penamahan field "Risk Supporting". Pengisian dropdown list level 2 master divisi.
Risk Register
Carl Soesanto
Sulaiman Saleh
Complete
9/20/2024
9/16/2024
Risk Register Step 1 Penambahan field "Identifikasi mengacu Non-KPI". Pengisian typing by user.
Risk Register
Carl Soesanto
Sulaiman Saleh
Complete
9/20/2024
9/16/2024
Risk Register Step 1 Penambahan field "Aktivitas Proses Bisnis". Pengisian dengan memilih level 3 master proses bisnis, dengan penambahan inforamasi Sub Proses dan Core Proses yg terisi otomatis.
Risk Register
Carl Soesanto
Sulaiman Saleh
Complete
9/20/2024
9/16/2024
Risk Register Step 1 Pada tabel "List Penyebab Risiko" di tambahkan kolom "KRI atas penyabab" dan "Controlable/Uncontrolable"
Risk Register
Carl Soesanto
Sulaiman Saleh
Complete
9/20/2024
9/16/2024
Risk Register Step 1 Penambahan kolom "Kriteria dampak finansial" pengisian dropdown dari master kriteria dampak, "Deskripsi dampak finansial", dan pencatatan "Nominal"
Risk Register
Carl Soesanto
Sulaiman Saleh
Complete
9/20/2024
9/16/2024
Risk Register Step 1 Penambahan kolom "Kriteria dampak Non-Finansial" pengisian dropwdown dari master kriteria dampak non finansial dan bisa di pilih lebih dari 1.
Risk Register
Carl Soesanto
Sulaiman Saleh
Complete
9/20/2024
9/16/2024
Weekly Report #5
Project Management Documentation
Kelvyn Lukito
Complete
1.0.0
9/20/2024
9/16/2024
Meeting CR PNM
Project Management Documentation
Kelvyn Lukito
Alfina Damayanti
Carl Soesanto
Complete
9/20/2024
9/16/2024
RCSA Step 1 - Risk Supporting pergantian mekanisme dengan pemilihan secara bebas pada bagian divisi
Risk Register
Sulaiman Saleh
Complete
1.0.0
9/27/2024
9/23/2024
[RCSA Tahap 2] Tambahan Field Lampiran di tabel Control Exsisting
Risk Register
Sulaiman Saleh
Complete
1.0.0
9/27/2024
9/23/2024
[RCSA Tahap 2] Perubahan tampilan keseluruhan untuk tahap 2
Risk Register
Sulaiman Saleh
Complete
1.0.0
9/27/2024
9/23/2024
[RCSA Tahap 2] Tabel Control Exsisting tambah kolom Skor NIK dan NIK dari master efektifitas kontrol.
Risk Register
Sulaiman Saleh
Complete
1.0.0
9/27/2024
9/23/2024
[RCSA Tahap 2] Tambahan informasi Average Skot NEK dan nilai efektifitas dilihat dari master data NEK.
Risk Register
Sulaiman Saleh
Complete
1.0.0
9/27/2024
9/23/2024
[RCSA Tahap 2] Pencatatan Skor NEK (Hasil dari Skor NIK * Bobot), Beserta keterangan efektifitas kontrol
Risk Register
Sulaiman Saleh
Complete
1.0.0
9/27/2024
9/23/2024
[RCSA Tahap 2] Tabel Control Existing tambah kolom "Desain Kontrol / Bobot" di ambil dari master data Design Control RCM
Risk Register
Sulaiman Saleh
Complete
1.0.0
9/27/2024
9/23/2024
Master DATA design Control RCM
Risk Register
Sulaiman Saleh
Complete
Priority
1.0.0
9/27/2024
9/23/2024
Master Data NEK
Risk Register
Sulaiman Saleh
Complete
Priority
1.0.0
9/27/2024
9/23/2024
Meeting PNM #6
Project Management Documentation
Kelvyn Lukito
Alfina Damayanti
Carl Soesanto
Complete
9/27/2024
9/23/2024
Minutes of Meeting Document (MOM) - 26 Agustus 224
Project Management Documentation
Alfina Damayanti
Complete
1.0.0
9/27/2024
9/23/2024
Minutes of Meeting Document (MOM) - 27 Agustus 224
Project Management Documentation
Alfina Damayanti
Complete
1.0.0
9/27/2024
9/23/2024
Minutes of Meeting Document (MOM) - 28 Agustus 224
Project Management Documentation
Alfina Damayanti
Complete
1.0.0
9/27/2024
9/23/2024
Minutes of Meeting Document (MOM) - 29 Agustus 224
Project Management Documentation
Alfina Damayanti
Complete
1.0.0
9/27/2024
9/23/2024
Minutes of Meeting Document (MOM) - 3 September 224
Project Management Documentation
Alfina Damayanti
Complete
1.0.0
9/27/2024
9/23/2024
Minutes of Meeting Document (MOM) - 5 September 224
Project Management Documentation
Alfina Damayanti
Complete
1.0.0
9/27/2024
9/23/2024
Minutes of Meeting Document (MOM) - 5 September 224
Project Management Documentation
Alfina Damayanti
Complete
1.0.0
9/27/2024
9/23/2024
Minutes of Meeting Document (MOM) - 10 September 224
Project Management Documentation
Alfina Damayanti
Complete
1.0.0
9/27/2024
9/23/2024
Minutes of Meeting Document (MOM) - 11 September 224
Project Management Documentation
Alfina Damayanti
Complete
1.0.0
9/27/2024
9/23/2024
Minutes of Meeting Document (MOM) - 13 September 224
Project Management Documentation
Alfina Damayanti
Complete
1.0.0
9/27/2024
9/23/2024
Minutes of Meeting Document (MOM) - 18 September 224
Project Management Documentation
Alfina Damayanti
Complete
1.0.0
9/27/2024
9/23/2024
Minutes of Meeting Document (MOM) - 20 September 224
Project Management Documentation
Alfina Damayanti
Complete
1.0.0
9/27/2024
9/23/2024
Minutes of Meeting Document (MOM) - 23 September 224
Project Management Documentation
Alfina Damayanti
Complete
1.0.0
9/27/2024
9/23/2024
Minutes of Meeting Document (MOM) - 25 September 224
Project Management Documentation
Alfina Damayanti
Complete
1.0.0
9/27/2024
9/23/2024
Minutes of Meeting Document (MOM) - 26 September 224
Project Management Documentation
Alfina Damayanti
Complete
1.0.0
9/27/2024
9/23/2024
Step 1 RCSA Tambah Data List Penyebab Risiko
Risk Register
Sulaiman Saleh
Complete
1.0.0
10/4/2024
9/30/2024
Dashboard ERMS
Risk Register
Sulaiman Saleh
Complete
1.0.0
10/4/2024
9/30/2024
Risk Register Step 3
Risk Register
Sulaiman Saleh
Complete
1.0.0
10/4/2024
9/30/2024
Master Pendaftaran KRI (Pindah dari Risiko utama > Master RCSA)
Risk Register
Faksi Naufal
Ghiffasya Aufadhia Agistiyas
Sulaiman Saleh
Complete
Priority
10/4/2024
9/30/2024
Perubahan nama field “Rencana Mitigasi Risiko” menjadi “Rencana Penanganan Risiko” - Step 3
Risk Register
Ghiffasya Aufadhia Agistiyas
Sulaiman Saleh
Complete
1.0.0
10/4/2024
9/30/2024
Input Master data kontrol divisi
Risk Register
Carl Soesanto
Complete
Priority
1.0.0
10/4/2024
9/30/2024
Input Data Master Data Kontrol
Risk Register
Carl Soesanto
Complete
Priority
1.0.0
10/4/2024
9/30/2024
Dashboard Wording - RCSA
Risk Register
Sulaiman Saleh
Complete
1.0.0
10/25/2024
10/21/2024
Perbaiki label pada menu kemungkinan risiko
Risk Register
Carl Soesanto
Complete
1.0.0
11/22/2024
11/18/2024
Perbaiki label pada Master Dampak
Risk Register
Carl Soesanto
Complete
1.0.0
11/22/2024
11/18/2024
Perbaiki label pada Menu Divisi
Risk Register
Carl Soesanto
Complete
1.0.0
11/22/2024
11/18/2024
Seragamkan Label pada menu Jenis Risiko
Risk Register
Carl Soesanto
Complete
1.0.0
11/22/2024
11/18/2024
Perubahan tampilan Kemungkinan dan Dampak
Risk Register
Carl Soesanto
Complete
Priority
1.0.0
11/22/2024
11/18/2024
Input Master data Proses Bisnis
Risk Register
Carl Soesanto
Complete
Priority
1.0.0
11/22/2024
11/18/2024
Input data Kemungkinan dan Dampak
Risk Register
Carl Soesanto
Complete
Priority
1.0.0
11/22/2024
11/18/2024
Tabel Residual Risk diganti menjadi Historical Risk
Risk Register
Ghiffasya Aufadhia Agistiyas
Sulaiman Saleh
Complete
11/22/2024
11/18/2024
Muncul eror saat input assigned KPI dengan kondisi salah satu filed kosong
Risk Register
Carl Soesanto
Al-Ghifari R
Imam Yabunaiya
Complete
1.0.0
11/29/2024
11/25/2024
Nomer Memo Review Manajemen Risiko > Typing (free text) + Upload dokumen Memo Review nya.
Lost Event Database (LED)
Carl Soesanto
Al-Ghifari R
Imam Yabunaiya
Complete
Priority
1.0.0
11/29/2024
11/25/2024
Master Judul kejadian Peristiwa Risiko > Dijadikan master.
Lost Event Database (LED)
Carl Soesanto
Al-Ghifari R
Imam Yabunaiya
Complete
Priority
1.0.0
11/29/2024
11/25/2024
Penyebab Risiko dan Kategori Risiko > 2 Level
Lost Event Database (LED)
Carl Soesanto
Al-Ghifari R
Imam Yabunaiya
Complete
Priority
1.0.0
11/29/2024
11/25/2024
Kejadian Terkait Fraud / Non Fraud > Pilihan Tipe Kejadian.
Lost Event Database (LED)
Carl Soesanto
Al-Ghifari R
Imam Yabunaiya
Complete
Priority
1.0.0
11/29/2024
11/25/2024
deskrpsi tidak perlu ada wording "level" nya.
Lost Event Database (LED)
Carl Soesanto
Al-Ghifari R
Imam Yabunaiya
Complete
Priority
1.0.0
11/29/2024
11/25/2024
Nomer Rujukan(Evidence) > Typing (free text) + Upload dokumen LHI nya.
Lost Event Database (LED)
Carl Soesanto
Al-Ghifari R
Imam Yabunaiya
Complete
Priority
1.0.0
11/29/2024
11/25/2024
Risk Register
Carl Soesanto
Al-Ghifari R
Imam Yabunaiya
Complete
1.0.0
11/29/2024
11/25/2024
Nomer Memo/Nomer Referensi > Typing (free text) + Upload dokumen Memo Referensi nya.
Lost Event Database (LED)
Carl Soesanto
Al-Ghifari R
Imam Yabunaiya
Complete
Priority
1.0.0
11/29/2024
11/25/2024
Bahasa Indonesia pada semua copy writing dimodul LED.
Lost Event Database (LED)
Carl Soesanto
Al-Ghifari R
Imam Yabunaiya
Complete
Priority
1.0.0
12/6/2024
12/2/2024
Progres mitigasi risiko dalam visualisasi progres chart : Menampilkan proses mitigasi risiko per jenis risikonya jika proses mitigasi 100% maka ber status closed
Top 10 Risk
Imam Yabunaiya
AI
Adisti Intan
Ghiffasya Aufadhia Agistiyas
Complete
Improvement
1.0.0
12/13/2024
12/9/2024
Finalisasi Dokumen BRS Bab 2
Project Management Documentation
Carl Soesanto
Permata Nurkhalida Hydra
AI
Adisti Intan
SA/TW
1.0.0
12/20/2024
12/16/2024
Historical risk menggunakan mekanisme NEK
Risk Register
Carl Soesanto
Al-Ghifari R
Imam Yabunaiya
Not Started
1.0.0
12/20/2024
12/16/2024
Finalisasi Dokumen BRS Bab 3
Project Management Documentation
Carl Soesanto
Permata Nurkhalida Hydra
AI
Adisti Intan
SA/TW
1.0.0
12/20/2024
12/16/2024
Level Risk by Jenis Risiko dalam visualisasi Bar Chart : Menampilkan Jumlah risiko per level risk ber dasarkan jenis risikonya
Top 10 Risk
Ghiffasya Aufadhia Agistiyas
AI
Adisti Intan
Imam Yabunaiya
Sulaiman Saleh
BE
Improvement
1.0.0
12/20/2024
12/16/2024
Risk Level by divisi dalam bar chart : Menampilkan Jumlah risiko per level risk ber dasarkan divisinya
Top 10 Risk
Ghiffasya Aufadhia Agistiyas
AI
Adisti Intan
Imam Yabunaiya
Sulaiman Saleh
BE
Improvement
1.0.0
12/20/2024
12/16/2024
Level Risk by KRI dalam Bar Chart : Menampilkan Jumlah risiko per level risk ber dasarkan divisinya
Top 10 Risk
Ghiffasya Aufadhia Agistiyas
AI
Adisti Intan
Imam Yabunaiya
Sulaiman Saleh
BE
Improvement
1.0.0
12/20/2024
12/16/2024
Skor NEK dalam Spedometer chart : menapilkan skor NEK terbesar,terkecil dan rata-rata yang ada di level direktorat
Top 10 Risk
Ghiffasya Aufadhia Agistiyas
AI
Adisti Intan
Imam Yabunaiya
Sulaiman Saleh
BE
Improvement
1.0.0
12/20/2024
12/16/2024
Jumlah RCSA yang sudah dan belum di mitigasi dalam Pie Chart : menampilkan total RCSA yang ada dan jumlah risiko yang sudah dan belum di mitigasi
Top 10 Risk
Ghiffasya Aufadhia Agistiyas
AI
Adisti Intan
Imam Yabunaiya
Sulaiman Saleh
BE
Improvement
1.0.0
12/20/2024
12/16/2024
Total Submit RCSA dalam Number Card : menampilkan jumlah submit RCSA (draft, prepare, submit to risk owner, approve by risk owner dan validated by MR) per divisi
Top 10 Risk
Imam Yabunaiya
AI
Adisti Intan
Ghiffasya Aufadhia Agistiyas
Sulaiman Saleh
BE
Improvement
1.0.0
12/20/2024
12/16/2024
status submit RCSA dalam bar chart horizontal : menampilkan jumlah submit RCSA (draft, prepare, submit to risk owner, approve by risk owner dan validated by MR) per divisi
Top 10 Risk
Imam Yabunaiya
AI
Adisti Intan
Ghiffasya Aufadhia Agistiyas
Sulaiman Saleh
BE
Improvement
1.0.0
12/20/2024
12/16/2024
Top Risk : menampilkan peristiwa risiko yang memiliki dampak sangat signifikan
Top 10 Risk
Imam Yabunaiya
AI
Adisti Intan
Ghiffasya Aufadhia Agistiyas
Sulaiman Saleh
BE
Improvement
1.0.0
12/20/2024
12/16/2024
Progres mitigasi dalam line chart : Menampilkan total progres risiko yang di mitigasi dan jika meng klik salah satu bar maka akan menampilkan detail risk event yang masih ber progres
Top 10 Risk
Imam Yabunaiya
AI
Adisti Intan
Ghiffasya Aufadhia Agistiyas
Sulaiman Saleh
BE
Improvement
1.0.0
12/20/2024
12/16/2024
Top Risk dalam visualisasi matrix : Menampilkan level kemungkinan dan dampak dari top risk
Top 10 Risk
Imam Yabunaiya
AI
Adisti Intan
Ghiffasya Aufadhia Agistiyas
Sulaiman Saleh
BE
Improvement
1.0.0
12/20/2024
12/16/2024
Tingkat Efektivitas kontrol dalam line chart : jumlah RCSA pada tingkatan efektifitas kontroldata di ambil dari tahap 2 risk register
Top 10 Risk
Imam Yabunaiya
AI
Adisti Intan
Ghiffasya Aufadhia Agistiyas
Sulaiman Saleh
BE
Improvement
1.0.0
12/20/2024
12/16/2024
Progres mitigasi dalam Fishbone chart : Menampilkan total progres risiko yang di mitigasi dan jika meng klik salah satu bar maka akan menampilkan detail risk event yang masih ber progres
Top 10 Risk
Imam Yabunaiya
AI
Adisti Intan
Ghiffasya Aufadhia Agistiyas
Sulaiman Saleh
BE
Improvement
1.0.0
12/20/2024
12/16/2024
menampilkan jumlah lost event, total loss, total recovery,total net loss
Lost Event Database (LED)
Imam Yabunaiya
BE
1.0.0
12/20/2024
12/16/2024
menampilkan total loss dalam beberapa periode
Lost Event Database (LED)
Imam Yabunaiya
Not Started
1.0.0
12/20/2024
12/16/2024
2. pada line chart jika di klik berpindah ke halaman lain untuk menampilkan data loss event, loss actual, recovery, net loss
Lost Event Database (LED)
Imam Yabunaiya
Not Started
1.0.0
12/20/2024
12/16/2024
menmpilkan informasi total kerugian per masing- masing divisi, dan jika menekan salah satu bar maka akan menampilkan detail total kerugian,recovery dan netloss
Lost Event Database (LED)
Imam Yabunaiya
Not Started
1.0.0
12/20/2024
12/16/2024
menampilkan informasi divisi ,jumlah loss event,loss actual,recovery, dan net loss dan dapat di urutkan dari kerugian terbesar dan terkecil
Lost Event Database (LED)
Imam Yabunaiya
Not Started
1.0.0
12/20/2024
12/16/2024
menampilkan informasi kejadian,jumlah loss event,loss actual,recovery, dan net loss dan dapat di urutkan dari kerugian terbesar dan terkecil
Lost Event Database (LED)
Imam Yabunaiya
Not Started
1.0.0
12/20/2024
12/16/2024

Want to print your doc?
This is not the way.
Try clicking the ⋯ next to your doc name or using a keyboard shortcut (
CtrlP
) instead.